Video index
Call to Order
1. 21-2845 Nominations and Election of a Chair.
2. 21-2856 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of Beck Road, a Secondary Arterial Type A requiring 86’ feet of right-of way, between existing New Sulphur Springs Road and existing Burshard Road. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
3. 21-2873 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of East & West Connector, a Secondary Arterial Type A requiring 86’ feet of right-of way, between existing Graytown Road and existing Abbott Road, and designating an existing segment of Abbott Road as a Secondary Arterial Type A, requiring 86’ feet right-of-way, between approximately 3,250’ feet north of the existing intersection of Graytown Road & Abbott Road and existing FM 1346. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
4. 21-2874 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of Graytown Road, a Secondary Arterial Type A requiring 86’ feet of right-of way, between approximately 3,290’ northwest of the existing intersection of Graytown Road and Freudenburg Road and approximately 1,240’ southwest of the existing intersection of Graytown Road and Freudenburg Road; and realigning a proposed segment of East & West Connector, a Secondary Arterial Type A requiring 86’ feet of right-of way, between approximately 4,840’ feet east of existing Schuwirth Road and existing Graytown Road. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
5. 21-2877 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of East & West Connector, a Secondary Arterial Type A requiring 86’ feet of right-of way, between existing Cagnon Road and existing Loop 1604. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
6. 21-2879 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of East & West Connector, a Secondary Arterial Type A requiring 86’ feet of right-of way, between approximately 1580’ east of existing Montgomery Road and existing Cagnon Road. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
7. 21-2880 Consideration, discussion, and make recommendations on amending the Planning Commission Technical Advisory Committee Bylaws.
8. 21-2881 Approval of minutes from the March 8, 2021 meeting.
Apr 12, 2021 Planning Commission Technical Advisory Committee
Full agenda
Share this video
Video Index
Full agenda
Share
Call to Order
1. 21-2845 Nominations and Election of a Chair.
2. 21-2856 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of Beck Road, a Secondary Arterial Type A requiring 86’ feet of right-of way, between existing New Sulphur Springs Road and existing Burshard Road. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
3. 21-2873 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of East & West Connector, a Secondary Arterial Type A requiring 86’ feet of right-of way, between existing Graytown Road and existing Abbott Road, and designating an existing segment of Abbott Road as a Secondary Arterial Type A, requiring 86’ feet right-of-way, between approximately 3,250’ feet north of the existing intersection of Graytown Road & Abbott Road and existing FM 1346. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
4. 21-2874 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of Graytown Road, a Secondary Arterial Type A requiring 86’ feet of right-of way, between approximately 3,290’ northwest of the existing intersection of Graytown Road and Freudenburg Road and approximately 1,240’ southwest of the existing intersection of Graytown Road and Freudenburg Road; and realigning a proposed segment of East & West Connector, a Secondary Arterial Type A requiring 86’ feet of right-of way, between approximately 4,840’ feet east of existing Schuwirth Road and existing Graytown Road. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
5. 21-2877 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of East & West Connector, a Secondary Arterial Type A requiring 86’ feet of right-of way, between existing Cagnon Road and existing Loop 1604. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
6. 21-2879 MAJOR THOROUGHFARE PLAN AMENDMENT: Consideration of a request to amend the Major Thoroughfare Plan, a component of the City of San Antonio Master Plan, by realigning a proposed segment of East & West Connector, a Secondary Arterial Type A requiring 86’ feet of right-of way, between approximately 1580’ east of existing Montgomery Road and existing Cagnon Road. Staff recommends approval. (Marco Hinojosa, AICP, Senior Transportation Planner, (210) 207-4087, Marco.Hinojosa@sanantonio.gov, Transportation)
7. 21-2880 Consideration, discussion, and make recommendations on amending the Planning Commission Technical Advisory Committee Bylaws.
8. 21-2881 Approval of minutes from the March 8, 2021 meeting.
Link
Start video at
Social
Embed
<iframe title="Swagit Video Player" width="640" height="360" src="https://sanantoniotx.new.swagit.com/videos/118402/embed" frameborder="0" allowfullscreen></iframe>
Disable autoplay on embedded content?
Download
Download
Download Selected Item