>> MAYOR JONES: GOOD AFTERNOON, THE TIME IS 4:53 P.M. ON THURSDAY, NOVEMBER 6TH, AND THE CCITY OF SAN ANTONIO'S SPECIAL SESSION IS CALLED TO ORDER. MADAM CLERK, PLEASE CALL ROLL.
[ BRIEFING ONLY]
>> MAYOR JONES: THANK YOU, MADAM CLERK. WE HAVE ONE ITEM TODAY, A BRIEFING ON THE JUNE 12TH BEITEL CREEK POST-EVENT ANALYSIS AND THIS HAS BEEN A POINT OF INTEREST, AND WE LOST TOO MANY NEIGHBORS DURING THIS UNFORTUNATE EVENT SO WE LOOK FORWARD TO THE EXPLANATION, AS BEST AS WE UNDERSTAND IT, AND CERTAINLY THE WAY FORWARD IN THE INTEREST OF PUBLIC SAFETY AND MAKING SURE THAT WE'RE BEING JUDICIOUS IN THESE IMPORTANT INFRASTRUCTURE RELATED INVESTMENTS. ERIK, OVER TO YOU.
>> SO ON JUNE 12TH, 2025 AS YOU ALL KNOW THAT WE HAD AN INTENSE RAINFALL THAT CAUSED FLOODING ALONG THE BEITEL CREEK AREA THAT OVER TOPPED THE LOOP 410 WESTBOUND FRONTAGE ROAD AND THE AUSTIN HIGHWAY UNDERPASS AND THE FLOODWATERS REACHED MORE THAN TWO FEET DEEP WITH FAST CURRENTS, AND SWEEPING VEHICLES INTO THE CREEK AND LEADING TO 11 FATALITIES IN THAT AREA.
THE CITY OF SAN ANTONIO HIRED KLEINFELDER INCORPORATEED TO PERFORM AN INDEPENDENT POST-EVENT ANALYSIS TO FIND THE CONTRIBUTING CAUSES AND TO DEVELOP RECOMMENDATIONS TO REDUCE THE POTENTIAL FOR FUTURE TRAGEDIES. KLEINFELDER, AS YOU WILL SEE IN THE PRESENTATION AND THE REPORT, USED HYDRAULIC MODELING AND FIELD SURVEYS AND A REVIEW OF THE RAINFALL AND RESPONSE DATA TO PROVIDE THEIR ANALYSIS. MR. JUSTIN MURRAY FROM KLEINFELDER WHO IS HERE WITH US TODAY IS GOING TO HIGHLIGHT THE STUDY, THE FINDINGS, AND SHARE THEIR RECOMMENDATIONS, AS THE MAYOR MENTIONED THIS WAS A DEVASTATING EVENT FOR OUR COMMUNITY. AND WE REMAIN COMMITTED TO UNDERSTANDING WHAT HAPPENED AND TAKING EVERY POSSIBLE STEP TO REDUCE THE PROBABILITY THAT THIS WOULD OCCUR AGAIN.
TOWARDS THE END OF THE PRESENTATION, JOHN PETEREK WILL HIGHLIGHT THE CITY ACTIONS AS IT RELATES TO THE RECOMMENDATIONS THAT WE RECEIVED FROM JUSTIN. AND WE'LL TURN IT BACK OVER TO YOU ALL FOR YOUR REVIEW AND QUESTIONS. SO I'LL TURN IT OVER TO JUSTIN
RIGHT NOW. >> THANK YOU, CITY MANAGER.
MUCH. MAYOR, COUNCIL, WHAT A TREMENDOUS OPPORTUNITY IT IS TO BE HERE TO SPEAK WITH YOU TODAY. IT IS AN UNFORTUNATE TRAGEDY THAT WE LOST 11 PEOPLE.
HOPEFULLY SOME OF THE FACTS THAT WE DISCUSS TODAY WILL LEAD TO ACTIONS TO PREVENT -- TO REDUCE THE PROBABILITY THAT IT'S REPEATED. MANY OF YOU MAY NOT BE FAMILIAR WITH KLEINFELDER, I WANTED TO GIVE YOU A QUICK HIT ON WHO WE ARE.
WE'RE A NATIONWIDE FIRM OF OVER 3,000 EMPLOYEES WITH ROUGHLY 110 LOCATIONS THROUGHOUT THE UNITED STATES. WE DO HAVE OFFICES IN AUSTRALIA AND GUAM AS WELL AND OUR KEY MARKET SECTORS ARE PUBLIC IN THE FACILITIES, TRANSPORTATION AND WATER REALMS. SUCH LIKE THE STUDY THAT WE PERFORMED FOR THE CITY THAT WE'RE GOING OVER TODAY.
I WANTED TO FAMILIARIZE EVERYONE WITH THE BEITEL CREEK WATERSHED AND IT'S A 13-MILE WATERSHED AND NORTH IN THE UPPER RIGHT HAND CORNER OF THIS FIGURE. THE UPPER PORTION OF THE WATERSHED BEGINS AROUND LOOP 1604 AND EXTENDS SOUTHWARD TO APPROXIMATELY -- OR NEAR LOOP 410. IH-35 BISECTS IT NORTH/SOUTH AND THE EASTERN THIRD OF THAT WATERSHED. THIS DEPICTION AS YOU SEE HERE, THE LIMITS WHAT WE REFER TO AS THE INTEGRATED MODEL ARE THE BLACK OUTLINE, AND THE DETAILED MODEL THAT WAS USED TO ASSESS DEPTHS AND HAVE SO LOSTITIES ON JUNE 12TH IS -- VELOCITIES IS LIMITED TO THE LEFT OF THIS IMAGE. AND THE RED DOTS THAT YOU SEE ARE THE CITY MAINTAINED STAGE GAUGES THROUGHOUT THE BEITEL WATERSHED. THE SCOPE OF STUDY AND MOST OF
[00:05:06]
THIS TODAY WILL FOCUS ON THE SECOND WORK AUTHORIZATION, BUT THE BROADER ANALYSIS THAT KLEINFELDER HAS PERFORMED ENCOMPASSES OTHER TASKS. THE FIRST OF WHICH WAS SURV SURVEYING. TO SUPPORT THIS STUDY WE COLLECTED HIGH RESOLUTION UPDATE AND DEFINE AND PROPERLY DEPICT WHAT THE EXISTING GROUND LOOKED LIKE ON JUNE 12TH.WE ALSO COLLECTED BRIDGE HYDRAULIC SURVEY DATA FOR THE STRUCTURES THAT ARE WITHIN THE DETAILED STUDY AREA TO MAKE SURE THAT THOSE ARE ON THE SAME DATUM AND WE COLLECTED 303 HIGH WATER MARKS. WE ALSO PERFORMED A METRIC SURVEY, WHICH IS BASICALLY THE UNDERWATER SURVEYING AND THERE'S APPROACHES IN 7 FEET OF DEPTH AND WE WANTED TO HAVE A DEPICTION OF THE UNDERWATER AREAS. AND THE SECOND WORK AUTHORITY IS THE MAJORITY OF THE WORK, THE H AND H MODEL THAT ENCOMPASSES THE DRAINAGE AREA AND THE I HAD HYDC MODEL AND IN A REPORT, THERE'S TWO OTHER COMPONENTS TO KLEINFELDER'S WORK THAT WAS A STRUCTURAL REVIEW OF BRIDGES AT VICKER AND P CAN UPON PERRIN AND THE CHANNEL WITH GEOTECHNICAL EXPLORATION TO SUPPORT THAT STUDY. AND THERE ARE A COUPLE OF KEY POINTS FROM THIS STUDY THAT I WANT TO GO OVER OR TO HIGHLIGHT. THIS EVENT, THE JUNE 12TH EVENT, WAS CONSISTENT WITH THE 25-YEAR STORM EVENT WHICH IN ESSENCE MEANS THAT IT HAS A 4% CHANCE OF OCCURRING IN ANY GIVEN YEAR. AND THE BEST AVAILABLE MODELING PRIOR TO THE EVENT DID NOT ACCURATELY DEPICT THE DEPTH AND VELOCITY ON JUNE 12TH, AND THE SINGLE BIGGEST FACTOR TO WHY THAT OCCURRED WAS RELATED TO THE DENSIFICATION JUST NORTH OF THE FRONTAGE ROAD.
THE LOW POINT THAT HAS BEEN THERE SINCE 197 1979 IS VULNERAE TO OVERTOPPING IN A TEN-YEAR EVENT BASED ON BEST AVAILABLE MODELING. AND ULTIMATELY, WE FOUND THAT THE TXDOT CONSTRUCTION WAS NOT A SIGNIFICANT CONTRIBUTING FACTOR TO THE FLOODING IN JUNE. THE SINGLE BIGGEST REASON THE JUNE 12TH EVENT HAPPENED WAS THE RAINFALL.
THE RAINFALL WAS CONSISTENT WITH A 25-YEAR EVENT WITH PEAK INTENSITY AROUND THAT TEN-MINUTE WINDOW AT SIX INCHES AN HOUR.
HIGHER AMOUNTS OF RAINFALL WERE EXPERIENCED ABOVE THE PARKWAY WITH LOWER AMOUNTS BELOW IT, CLOSER TO LOOP 410.
THE STUDY ITSELF IS VERY TIGHT. STATISTICALLY SPEAKING, TO ILLUSTRATE THAT, WE'VE GOT AN IMAGE ON THE SCREEN SHOWING THE 303 POINTS THAT WERE COLLECTED FOR HIGH-WATER MARKS.
THE MAJORITY OF THEM WERE COLLECTED AROUND THE LOOP 410 FRONTAGE ROAD.
THAT'S THE AREA WE'RE MOST INTERESTED IN. WITH OTHER MARKS COLLECTED TO VALIDATE ADJUSTMENTS. YOU CAN SEE FROM THIS GRAPHIC THAT MANY POINTS WERE WITHIN ONE FOOT, MORE WITHIN HALF A FOOT. THE SCOPE LIMITATION WAS TO BE WITHIN TWO FEET.
MORE THAN 80% OF THESE POINTS WERE WITHIN THAT TWO-FOOT MARK. AND THOSE MARKS AMOUNT TO DEBRIS AND SILT LINES ON CONCRETE. THE STUDY IS BROKEN UP INTO TWO SEPARATE PIECES.
THE PREVIOUS SLIDE FOCUSED ON THE INTEGRATED H&H MODEL USED FOR HYDROLOGY.
AND THIS SLIDE FOCUSES ON THE DETAILED S STUDY. THE FLOWS FROM THE PREVIOUS INFORMATION WERE INPUT IN TO THIS. IT MAY BE HARD FOR THOSE TO SEE HERE OR ONLINE, BUT THERE ARE GREEN DOTS THAT HIGHLIGHT HIGH-WATER MARKS THAT WERE WITHIN HALF A FOOT OF THE MODELED WATER SURFACE ELEVATION WITH YELLOW DOTS FOR HIGH WATER MARKS WITHIN ONE FOOT, SHOWING GENERALLY ALONG THE WESTBOUND FRONTAGE ROAD, MANY POINTS ARE WITHIN HALF A FOOT, INDICATING THERE WAS A HIGH DEGREE OF REPLICATION OF THE EVENTS ON JUNE I 12TH BY THIS MODELING. THIS GRAPHIC SHOWS THE TRAVEL TIME FROM EACH GAUGING STATION ALONG THE MAIN STEM. YOU CAN SEE THE PEAK OCCURRED AT JUDSON AT 4:05 IN THE MORNING AND TOOK UNTIL 5:02 IN THE MORNING TO ARRIVE NEAR THE WESTBOUND FRONTAGE ROAD.
THE GRAPHIC ON THE RIGHT DEPICTS FLOW ON THE Y AXIS AND TIME ON THE X AXIS.
[00:10:08]
SHOWING THE CONNECTION OR THE TRANSMISSION OF THOSE PEAKS DOWN.JUST MAKING SURE THAT THIS VIDEO STILL WORKS. THIS VIDEO IS ACTUAL INFORMATION OR ACTUAL RESULTS FROM THE HYDRAULIC MODEL. WHAT'S KEY IS AROUND THE 4:30 OUR YOU'LL SEE A CONNECTION BETWEEN THE CREEK AND THE FRONTAGE ROAD.
THAT CONNECTION CONTINUES TO DEEPEN UNTIL AROUND 5:05 IN THE MORNING.
IT TAKES UNTIL 6:00 FOR THAT FLOODWATER TO RECEDE. THE WHITE ARROWS, THE SMALLER AND SKINNIER, THE LOWER THE VELOCITY. THE LARGER AND LONGER THEY ARE, THE HIGHER THE VELOCITY. YOU'LL SEE AT THIS 4:30 HOUR THE RED ARROW INDICATING THE SAG POINT LOCATION BECOMES INUNDATED. AT A POINT WHEN FLOWS BEGIN TO OVERTOP THE FRONTAGE ROAD, UP NEAR THE FENCED CONSTRUCTION AREA YOU'LL SEE THAT THE FLOW ARROWS BEGIN TO CROSS THE FRONTAGE ROAD PERPENDICULAR TO THE CREEK.
FLOWS CONTINUE ALONG THAT ENTRANCE RAMP UNTIL THEY REACH THE RED ARROW OF THE SAG POINT.
THESE ARE STILL SHOTS. THE WHITE LINES THAT YOU SEE HERE ARE AN INDICATION OF VELOCITY AND DIRECTION. THE LONGER THE TAILS, THE HIGHER THE VELOCITY, THE SHORTER, THE LOWER THE VELOCITY. YOU CAN SEE AT 4:15 IN THE MORNING THAT DEPTHS HAD ALREADY REACHED ROUGHLY SIX INCHES ON THE FRONTAGE ROAD. THAT RED ARROW HIGHLIGHT AT THE SAG LOCATION. 15 MINUTES LATER, 1 1/2 FEET. BY 5:00 IN THE MORNING, ABOUT FOUR FEET WITH WIDESPREAD FLOODING ACROSS THE FRONTAGE ROAD.
IN -- THIS IMAGE DEPICTS THE RANGE OF VELOCITIES. DEEPER RED, HIGHER.
LIGHTER BLUE, LOWER VELOCITIES. AGAIN, THOSE WHITE LINES INDICATING THE DIRECTION AND THE INTENSITY OF THOSE FLOWS. AT THE SAG POINT AT THE SAME TIME THE PREVIOUS IMAGE SHOWED FOUR FEET OF FLOODING, THE FRONTAGE ROAD ALSO EXPERIENCED VELOCITY.
AS I ITERATED, ONE OF THE SIGNIFICANT FINDINGS WA WAS THE BEST AVAILABLE MODELING ON THE FRONTAGE ROAD IS TIED TO THE ASSUMPTIONS FOR ROUGHNESS IN THE DENSELY VEGETATED AREAS NORTH OF THE FRONTAGE ROAD. THIS GRAPHIC SHOWS IN THE DARK GREEN WHERE THE DENSE AND MEDIUM VEGETATION, WHICH ALSO CONTRIBUTED, ARE LOCATED, IN THE LIGHTER GREEN.
THE STUDY CULMINATED IN RECOMMENDATIONS TO IMPROVE CONDITIONS.
THE FIRST RECOMMENDATION IS TO INSTALL A STAFF GAUGE AT THE SAG POINT TO PROVIDE INFORMATION TO MOTORISTS ON WHETHER IT'S SAFE TO PROCEED OR NOT. WE'RE RECOMMENDING FLASHING LIGHTS AND SIGNS BE ADDED TO ALERT DRIVERS TO POTENTIAL WATER OVER THE ROAD.
THE SECOND RECOMMENDATION IS TO WORK WITH TXDOT TO ELEVATE THE ROADWAY AND BEYOND ELEVATING THAT ROADWAY, ALSO CALL FOR THE CITY'S ADVOCATION THAT TXDOT EXPAND ITS CRITERIA TO ASSESS.
NOT JUST FRONTAGE ROADS, BUT ALL ROADS FOR THE FREQUENCY OF FLOODING, DEPTHS, AND VELOCITIES. HAD THAT INFORMATION EXISTED, THERE'S TO POTENTIAL TXDOT AND THE CITY COULD HAVE IDENTIFIED POTENTIAL FOR THE EVENT AND PREPLAN ACTIVITIES.
THIRD, REVIEW AND ENHANCE EMERGENCY RESPONSE PROTOCOLS AMONGST CITY DEPARTMENTS IN COORDINATION WITH TXDOT, TRANSGUIDE AND OTHER ENTITIES. THE FOURTH IS TO RELOCATE GAUGES TO THE DOWNSTREAM FACE OF CROSSINGS AND SURVEY THE DATUMS TO IMPROVE THE ACCURACY OF THE DATA COLLECTED. I DON'T JOHN WILL TELL US MORE. THE FIFTH IS TO EXPAND SENSOR NETWORKS TO INCLUDE RAIN GAUGES, CAMERAS, AND AUTOMATED BARRIERS. THIS IS A PART OF THE NEXT JEN
[00:15:04]
SYSTEM UNDER WAY AND INTEGRATE THAT WITH PREDICTIVE FLOOD MODELING TOOLS TO GIVE BETTER INFORMATION AND DECISION-MAKING FOR VARIOUS CITY DEPARTMENTS. THE SIXTH IS TO UPDATE MODELS OR EXPAND THE USE OF TWO-DIMENSIONAL MODELS THROUGHOUT THE CITY OF SAN ANTONIO. AS WE SAW IN THE PREVIOUS SLIDES, NOT ALL OF THE FLOW WAS PARALLEL TO THE CREEK. AND THAT IS DIFFICULT TO ESTIMATE USING THE CURRENT MODELING METHODS. IN DISCUSSIONS WITH SARAH, THEY ALSO SUPPORT THE EXPANSION OF TWO-DIMENSIONAL MODELING. THE LAST IS TO CONDUCT A LEGAL REVIEW TO CLARIFY RESPONSIBILITIES AND RIGHTS OF WAY. CLEARLY THERE IS AT LEAST A QUESTION OF WHOSE RESPONSIBILITY OR WHAT LEVEL OF MAINTENANCE WAS REQUIRED JUST NORTH OF THE FRONTAGE ROAD. WITH THAT, I'D LIKE TO HAND IT OVER TO JOHN.>> THANK YOU, JUSTIN. AND I JUST WANT TO SAY THANKS FOR YOUR PARTNERSHIP AND YOUR WORK. MAYOR AND COUNCIL, THE CITY OF SAN ANTONIO WILL BE WORKING WITH OUR PARTNERS TO ADOPT THESE RECOMMENDATIONS. I WANT TO STEP THROUGH THEM AND TALK ABOUT OUR CURRENT POSITION AND WHO WE'LL BE COORDINATING WITH.
THE FIRST RECOMMENDATION IS TO INSTALL A FLASHING LIGHT WARNING TO CREATE THE ACCESS ROAD AS A LOW WATER CROSSING. SO, INSTALL A WARNING WITH A GAUGE AT THE LOOP 410 SAG POINTPOINTAND THE AUSTIN HIGHWAS TO PREVENT ANY TRAGEDY LIKE THIS MOVING FORWARD.
THIS WORK HAS BEGUN. WE'VE BEGUN A CONVERSATION WITH TXDOT.
IN THE INTERIM, TXDOT HAS INSTALLED HIGH WATER SIGNS ON BOTH LOCATIONS AS AN INITIAL STEP. THE COMPLETION OF THIS WORK WILL TAKE MORE COORDINATION, BUT IT'S UNDER WAY. THE SECOND RECOMMENDATION IS TO COORDINATE WITH TXDOT TO PROTECT THE FRONTAGE ROAD BY RAISING ITS LEVEL TO REMOVE IT FROM THE FLOOD PLAIN.
THAT'S GOING TO BE A LONGER EFFORT, BUT THE CONVERSATION WITH TXDOT HAS BEGUN.
THAT'LL TAKE COORDINATION FROM US ON HOW THE CREEK WILL INTERPLAY WITH THAT ACCESS ROAD, BUT WE'RE COMMITTED TO WORKING TOWARDS A SOLUTION THERE. RECOMMENDATION NUMBER 3 HAS TO DO WITH WHAT DATA DO WE HAVE NOW FROM OUR GAUGES IN THE STREAM AND OUR RAIN GAUGES ON PIECES OF LAND THAT COULD ALERT US TO CLOSE THE WESTBOUND FRONTAGE ROAD PREEMPTIVELY.
SO A PROTOCOL HAS BEEN ESTABLISHED AND WORK HAS BEGUN IN COORDINATION WITH TXDOT THAT AS GAUGES IN THE NORTHERN PART AND THE UPPER PARTS OF THIS WATERSHED START TO INDICATE THAT FLOODING IS UNDER WAY, WE WILL PREEMPTIVELY CLOSE THE WESTBOUND FRONTAGE ROAD AND TREAT IT AS A LOW WATER CROSSING. WHEN A RAIN EVENT IS PREDICTED, BARRICADES WILL BE PRE-STAGED AND IN COORDINATION WITH TXDOT WE WILL CLOSE THE WESTBOUND FRONTAGE ROAD JUST LIKE WE WOULD ANY OTHER LOW WATER CROSSING. RECOMMENDATION FOUR AND FIVE HAVE TO DO WITH GAUGES AND SENSORS. AS OUR WORK HAS BEGUN WITH S.A.R.A. AND THE COUNTY TO UPGRADE THE CROS CROSSINGS, THIK WILL HAPPEN. THE LOCATIONS OF THE GAUGES WILL BE UPDATED. THE DATUM WILL BE UPDATED. THAT IS SETTING THE ELEVATION OF EACH GAUGE SO WE CAN PREDICT AND UNDERSTAND THE EXACT THING THAT'S HAPPENING AT THAT LOCATION. THAT WORK IS UNDER WAY IN COORDINATION WITH SARA.
JUSTIN'S REPORT CALLS FOR TXDOT TO BE A PART OF THAT PROCESS.
TXDOT HAS SOME LOW WATER CROSSINGS. WE'LL WORK TO INCLUDE THEM.
THOSE WORKS ARE UNDER WAY. THE SIXTH RECOMMENDATION HAS TO DO WITH INTE INTEGRATING HYDRAUC MONITORING. THIS IS A COORDINATED EFFORT THAT WILL BE DONE WITH S.A.R.A., TXDOT, AND OURSELVES. IT'S A BIG RESEARCH PROJECT, ESSENTIALLY. S.A.R.A. IS INTERESTED IN HOW DO WE GET THAT GOING IN SAN ANTONIO. RECOMMENDATION NUMBER 7 HAS TO DO WITH CLARIFYING MAINTENANCE DUTIES AND PROPER VEGETATION MANAGEMENT OF THE AREAS TO THE NORTH OF THE ACCESS ROAD.
SO, OUR STAFF HAS MADE CONTACT WITH THE PROPERTY OWNERS TO BEGIN THE PROPER VEGETATION MAINTENANCE AND WE'VE SET A REGULAR INSPECTION SCHEDULE TO UNDERSTAND WHAT'S HAPPENING THERE. ON ALL OF THESE RECOMMENDATIONS, WE PLAN TO PROVIDE YOU ALL WITH QUARTERLY UPDATES ON THE IMPLEMENTATION. THERE'S A LOT OF INTERPLAY WITH OUR PARTNERS ON THESE. ITIT WILL INCLUDE THOSE UPDATES. OUTSIDE OF JUSTIN'S RECOMMENDATIONS, THERE ARE SOME ADDITIONAL STEPS HAPPENING THIS YEAR WE WANT TO MAKE SURE YOU'RE
[00:20:03]
AWARE OF. THE FY26 BUDGET INCLUDED CHANNEL REPAIR FUNDING FOR THREE PLACES.IN THIS WATERSHED, THOSE AREAS WILL BE IMPROVED AND CORRECTED. WE'RE COORDINATING ON THE NEXT GEN FLOOD WARNING SYSTEM TO UPGRADE AND REPLACE OUR CURRENT TECHNOLOGIES AROUND FLOOD SENSORS, GAUGES AT LOW WATER CROSSINGS, AUTOMATED GATES. INTENSE EFFORT THERE.
IN THE SAME WATERSHED, THE VICKER ROAD CROSSING WAS IMPACTED.
WE'RE NOT GOING TO REOPEN THAT. THERE'S ANOTHER WAY TO ACCESS THOSE BUSINESSES.
WE'RE GOING TO ELIMINATE A LOW WATER CROSSING THAT WAS A PART OF THIS OVER THE NEXT YEAR.
ADDITIONALLY, THE CITY HAS PRODUCED A PSA THAT HELPS RESIDENTS UNDERSTAND HOW TO TURN ON EMERGENCY ALERTS ON THEIR PHONES. THE NATIONAL WEATHER SERVICE PRODUCES EMERGENCY ALERTS. THIS PSA WILL HELP FOLKS WALK THROUGH THE STEPS OF HOW THOSE TURN THOSE ON SO THAT WE CAN CONTINUE TO WORK ON HOW THE PUBLIC IS NOTIFIED.
I MENTIONED THE LAST ONE ALREADY. WE'RE GOING TO COORDINATE WITH TXDOT TO BARRICADE THE FRONTAGE ROAD. IF ANY OF THE SENSORS ARE INDICATING A FLOOD HEADED THAT WAY. AS YOU BEGIN TO THINK ABOUT FLOODING, WE WANTED TO REMIND YOU ABOUT PROJECT PRIORITIZATION FOR THE CITY AROUND DRAINAGE PROJECTS. THE CITY'S GOING TO CONTINUE TO ASSESS DATA, 311 CALLS, RAINFALL DATA, TO SCORE AND RANK FUTURE DRAINAGE PROJECTS. WE'RE ALSO GOING TO LOOK AT LIFE SAFETY AND PROPERTY DAMAGE BASED ON PROJECT PRIORITIZATION. WE ALSO HIGHLIGHT THAT THERE ARE PHASED DRAINAGE PROJECTS ONGOING AND WE WOULD PRIORITIZE FINISHING THE NEXT PHASES OF THOSE PROJECTS. WE'RE GOING TO APPLY RESOURCES TO THE MOST VULNERABLE AREAS OF TOWN AND THE MOST HAZARDOUS PROPERTIES. AND WE'LL CONTINUE TO UTILIZE THE SAFETY DATA FOR LOW WATER CROSSINGS AND LEVERAGE MULTIPLE RESOURCES -- THE CITY BOND PROGRAM, STORMWATER FEE, FEE IN LIEU OF, FEDERAL AND STATE GRANTS.
WITH THAT, JUSTIN AND I ARE AVAILABLE FOR ANY QUESTIONS YOU MAY HAVE.
>> THANK YOU FOR YOUR PRESENTATION AND OUTLINING THE NEXT STEPS.
WANT TO REITERATE MY SYMPATHY FOR THOSE 13 MEMBERS OF OUR COMMUNITY LOST DUE TO THE FLOODS. AND I'M VERY THANKFUL THAT -- LET ME SAY BASED ON THE CITY STAFF'S QUICK REACTION TO BE ABLE TO REQUEST THIS INDEPENDENT REVIEW AND COLLECT DATA QUICKLY, THAT ALLOWED US TO HAVE AS GOOD AN UNDERSTANDING OF WHAT HAPPENED AS POSSIBLE.
I APPRECIATE THE QUICK RECOGNITION WHICH ALLOWED FOR THE REPORT TO BE CONDUCTED.
I ALSO APPRECIATE THE CITY STAFF'S EFFORTS TO BEGIN IMPLEMENTING THINGS WE CAN GET AFTER RIGHT AWAY. THERE IS CONTINUED INTEREST FROM THIS BODY TO MAKE SURE THAT WE UNDERSTAND THE TIMELINE AND COST ASSOCIATED WITH THOSE. NOT ALL OF THESE THINGS ARE JUST WITHIN CITY CONTROL. WE UNDERSTAND THERE'S MUCH-NEEDED PARTNERSHIP.
BUT THAT TIMELINE AND THE COST ASSOCIATED WILL BE HELPFUL IN MANAGING THE PUBLIC'S EXPECTATIONS ABOUT HOW WE ADDRESS THE ISSUES AROUND JUNE 13TH IN PARTICULAR.
AS WE KNOW, THE ONLY FUNDING IN THE '26 BUDGET WAS RELATED TO REPAIR.
IF WE MADE THOSE REPAIRS AND THE SAME EVENT HAPPENED AGAIN WE'D BE IN THE SAME BOAT.
SO MAKING SURE THAT WE ARE BEING THOUGHTFUL. THE HOLISTIC REVIEW THAT I'VE ASKED FOR -- I APPRECIATE IT BEING REFLECTED IN THE WAY AHEAE COMMUNITY IS LOOKING TO DO.
AS MENTIONED FROM A PUBLIC SAFETY STANDPOINT TO THOSE 14 PROJECTS ON THE STATE'S FLOOD PLAN THAT IS SCOPED, AMOUNT TO $411 MILLION ON TOP OF PROJECTS LIKE 300 CHANNING STREET, WHICH WE'VE HEARD A LOT ABOUT. I KNOW MYSELF, LIKE MY COLLEAGUES, WHENEVER WE HAVE A MAJOR ENGAGEMENT, INFRASTRUCTURE PROJECTS, FLOOD-RELATED PROJECTS ARE TOP OF MIND FROM A PUBLIC SAFETY ISSUE AND FROM A PROPERTY VALUE STANDPOINT. SO, WE LOOK FORWARD TO THE QUARTERLY UPDATES. I THINK THAT HOLISTIC REVIEW WILL ALSO BE REALLY IMPORTANT AS WE COMMUNICATE TO OUR CONSTITUENTS ABOUT THE WAY WHICH WE ARE IDENTIFYING,
[00:25:05]
PRIORITIZING, AND FUNDING THESE. 411 MILLION FOR 14 PROJECTS DEMONSTRATES THE SIGNIFICANT BILL ASSOCIATED WITH THESE THINGS. SO HOW WE CAN DEMONSTRATE AND SHOW THE WAYS IN WHICH THE LOGICAL APPROACH, THE TRANSPARENCY AND TIME WILL BE VERY HELPFUL. EARLIER THIS YEAR, WHEN THIS HAPPENED, I WENT UP TO AUSTIN FOR THE SPECIAL SESSION AND TALKED WITH EACH OF THE MEMBERS ABOUT WHAT THE 14 PROJECTS LOOKED LIKE IN OUR COMMUNITY. I'M TALKING MORE HOLISTICALLY ABOUT THE WAY AHEAD.THIS IS NOT SOMETHING WE'RE GOING TO BE ABLE TO FUND INTERNALLY OURSELVES.
IT'S GOING TO BE REALLY IMPORTANT THAT WE CONTINUE TO WORK WITH OUR STATE AND FEDERAL DELEGATIONS TO ENSURE WE HAVE SUFFICIENT RESOURCES FOR THESE PROJECTS.
THANK YOU FOR THE VERY THOUGHTFUL ANALYSIS, THE WAY AHEAD.
AND THE NEXT STEPS AS WE MONITOR THIS. I WILL OPEN IT UP TO MY COLLEAGUES FOR THOSE WHO WOULD LIKE TO COMMENT. NO ONE HAS SIGNED UP.
WOULD ANYONE LIKE TO SIGN UP? OKAY. COUNCILWOMAN VIAGRAN.
>> VIAGRAN: NOW, SO -- I THINK R WITH THE FLOODING OF THE SOUTH SIDE.
AND THE ONE THING THAT I WOULD TELL MY RESIDENTS -- IT'S NOT IF, IT'S WHEN.
AND WHE WHAT DO WE DO IN PREPARN FOR THAT. AND I FEEL THIS WAS SOMETHING WE KNEW WHERE IT FLOODED IN THE CITY, WE JUST DIDN'T EXPECT IT HERE.
SO, THANK YOU FOR THE WORK. AND JOHN, THANK YOU FOR THE STEPS OF BEING PROACTIVE IN THIS SPECIFIC AREA. BUT I THINK WHAT WE NEED TO DO IS START WORKING WITH THE STATE MORE TO IDENTIFY, AS CONSTRUCTION COMES IN, AS WE GET RID OF SOME OF THIS VEGETATION -- THANK YOU FOR BRINGING THAT POINT -- WE NEED TO SEE AND BRING GROUPS IN TO SAY THIS LOOKS VERY FAMILIAR TO WHAT WAS HERE. AND THAT IS WHERE WE AS A CITY ARE GOING TO NEED TO LOOK AT THAT. IT'S 25 YEARS, BUT WE KNOW -- WE DON'T KNOW WHEN THAT NEXT 25 YEARS AND WHERE IT'S GOING TO HIT.
SO, IT WAS VERY REMINISCENT OF THINGS THAT HAPPENED. THERE WASN'T THE LOSS OF LIFE ON THE SOUTH SIDE, BUT IN TERMS OF THE HOMES AND DAMAGES WE EXPERIENCED, WHICH FELT 15 YEARS AGO. I WAS LIKE, ANOTHER LESSON LEARNED.
AND WE KNOW THE EXPERIENCES AND WHAT HAPPENED. SO, I THINK WE NEED TO -- IT'S NOT AN IF, IT'S A WHEN, AND WHAT CAN WE DO TO IDENTIFY THAT. THANK YOU FOR YOUR EFFORTS.
I LOOK FORWARD TO WORKING AT THIS IN THE DIFFERENT COMMITTEES AND MAKING THIS A PRIORITY FOR OUR NEXT LEGISLATIVE SESSION AS WE GO UP TO AUSTIN IN 18 MONTHS. THANK YOU.
>> MAYOR JONES: COUNCILMEMBER SPEARS. >> SPEARS: THANK YOU, MAYOR.
I ALSO WANT TO ECHO WHAT YOU WERE SAYING ABOUT HOUR SHARED SADNESS FOR THE LOSS OF LIFE ON THAT TRAGIC DAY. THANK YOU FOR THE EXCELLENT REPORT.
AND IT'S VERY ENLIGHTENING AND FULL OF INFORMATION FOR US. AND I APPRECIATE OUR STAFF FOR MOVING QUICKLY TO ASK FOR THAT REPORT, ERIC AND JOHN, FOR YOUR QUICK RESPONSE AS WELL.
AND I APPRECIATE THAT. AND I LOOK FORWARD TO WORKING ON THIS TOGETHER WITH MY
COLLEAGUES. THANK YOU. >> MAYOR JONES: COUNCILMEMBER
GALVAN. >> GALVAN: THANK YOU, MAYOR. THANK YOU TO CITY STAFF AND THE CONSULTANT FOR PUTTING THIS PRESENTATION TOGETHER, AND ALL THE WORK DONE IN THE BACKGROUND.
I WANT TO EXPRESS SYMPATHY TO EVERYBODY WHO WAS IMPACTED, AS WELL AS THE FAMILIES IMPACTED, AND REITERATE A LOT OF THESE THINGS WE SEE IN TERMS OF THE NEED FOR INFRASTRUCTURE IMPROVEMENTS, PARTICULARLY WITH DRAINAGE ACROSS OUR CITY, BUT ESPECIALLY IN PLACES LIKE THESE AND OTHERS. AND I THINK A LOT ABOUT FOLKS IN DISTRICT 6 WHO HAVE EXPRESSED CONCERNS, SOME OF THESE MAJOR INFRASTRUCTURE PROJECTS THAT ARE NEEDED THAT REQUIRE A SIGNIFICANT AMOUNT OF FUNDING, PARTICULARLY AROUND THE DAMAGE CENTERS AROUND CREEK WAYS AND WATERSHEDS. KEEPING THAT TOP OF MIND. I'M EXCITED TO WORK WITH MY COLLEAGUES TO ADDRESS THIS ISSUE EVERY YEAR WE'RE HERE. AND WHATEVER WAY WE CAN.
AND I WANT TO EXTEND AN EXPRESSION OF GRATITUDE TO THE FOLKS WITH THE RIVER AUTHORITY WHO HAVE BEEN WORKING WITH THE DISTRICT 6 OFFICE AND RESIDENTS DISCUSSING AREAS TO MAKE SURE
[00:30:05]
WE'RE PREPARED AND MAKING AN EFFORT THERE. WE ALWAYS ARE, BUT WANT TO MAKE SURE WE'RE THINKING AS HOLISTICALLY AS POSSIBLE HOW WE CAN CONTINUE TO IMPROVE OUR DRAINAGE NEEDS AS WELL ADDRESSING FLOODING CONCERNS THROUGHOUT OUR CITY AND DISTRIC.THANK YOU SO MUCH, AND THANK YOU, MAYOR. >> MAYOR JONES: HAS EVERYONE
SPOKEN? >> I WANTED TO ECHO THE COMMENTS THAT HAVE HAVE ALREADY BEEN SAID AND SAY THANK YOU TO COUNTY AND CITY STAFF THAT HAVE PUT REAL DOLLARS BEHIND CREATING
SOLUTIONS IN THIS AREA. THANKS, MAYOR. >> MAYOR JONES: OKAY.
WITH THAT, WE LOOK FORWARD TO THE UPDATE IN A QUARTER. OKAY.
THANK YOU. THE TIME IS