Link


Social

Embed


Download

Download
Download Transcript


GOOD

[00:00:01]

MORNING.

IT IS APRIL 9TH, 2026 AT 9:04 AM WELCOME TO THE BUILDING STANDARDS BOARD.

MY NAME IS KAYLA AND I AM THE CHAIR OF THE B PANEL.

UH, CAN WE HAVE A ROLL CALL, PLEASE? KAYLA MIRANDA HERE.

JOEL SOLIS PRESENT, GEORGE GRIMES JR.

PRESENT, DR. LINDA LOPEZ RODRIGUEZ.

PRESENT YVONNE ADDISON.

PRESENT.

ROBERT TAPIA.

FRED ANDIS.

PRESENT.

ALSO PRESENT IN THE MEETING FROM THE CITY OF SAN ANTONIO ARE SAVITA FROM THE CITY ATTORNEY'S OFFICE AND FROM DEVELOPMENT SERVICES.

JENNY RAMIREZ.

INTERIM CODE ENFORCEMENT ADMINISTRATOR, MELISSA GARZA, ADMINISTRATIVE ASSISTANT TWO.

ESTHER ORTIZ, DEVELOPMENT SERVICES SPECIALIST ONE.

AND MYSELF, JUDY KRUM, DEVELOPMENT SERVICES SPECIALIST SUPERVISOR CHAIR AORM IS PRESENT.

THE CITY OF SAN ANTONIO PROVIDES INTERPRETATION SERVICES.

CAN WE PLEASE HAVE THAT STATEMENT? GOOD MORNING.

UM, THANK YOU.

AS STATED, A QUORUM IS PRESENT.

PLEASE SILENCE YOUR CELL PHONE AND ANY OTHER DEVICE THAT MAY DISRUPT THIS PUBLIC HEARING.

NO PERSON SHALL DELAY OR DISRUPT THE PROCEEDINGS OR DISOBEY THE ORDER OF THE CHAIR.

IF YOU WISH TO SPEAK ON A CASE, YOU WILL BE ALLOWED THREE MINUTES.

HOWEVER, AN OWNER OR OWNER'S REPRESENTATIVE WILL HAVE UNLIMITED TIME.

PLEASE KEEP ALL INFORMATION RELEVANT TO THE PROPERTY IN QUESTION AND THE CODE VIOLATION.

AS ADVISED PRIOR TO THIS PUBLIC HEARING, THE CITY WILL PROVIDE TRANSLATION SERVICES FOR ANYONE NEEDING ASSISTANCE.

IT IS OUR UNDERSTANDING THAT YOU HAVE MADE SUCH ARRANGEMENTS AS IS ADVISED IN YOUR NOTICE OF HEARING, OUR EXPECTATION IS THAT YOU SUBMITTED THE REQUIRED DOCUMENTS PRIOR TO THIS PUBLIC HEARING.

YOUR RESPONSIBILITY AS A PROPERTY OWNER OR LIENHOLDER OF A DILAPIDATED CASE OR STRUCTURE CASE IS TO DETERMINE, UH, DEMONSTRATE THE FOLLOWING, PROVIDE THE REQUIRED DOCUMENTS, DISCUSS YOUR DE DETAILED SCOPE OF WORK WITH THE COSTS FOR EACH ITEM OUTLINED IN THE ORDER TO BRING THE PROPERTY INTO COMPLIANCE TO THE SATISFACTION OF THE CODE OFFICER.

SUBMIT THE REQUIRED PROOF OF FINANCIAL ABILITY TO PAY FOR PROPOSED WORK AND DISCUSS FEASIBILITY OF REPAIRS DEPENDENT UPON MONIES AT HAND REQUEST THE AMOUNT OF TIME NEEDED TO COMPLETE THE WORK.

ALL ABATEMENTS ORDERED BY THE BOARD SHALL BE ENFORCED.

ALL WORK PROPOSED MUST BE DONE WITHIN CODE REGULATIONS WITH REQUIRED PERMITS PRIOR TO COMMITMENT COMMENCEMENT OF WORK.

YOU MUST BE OR YOU MUST OBTAIN ALL PERMITS FROM THE DEPARTMENT OF DE DEVELOPMENT SERVICES LOCATED IN 1901 SOUTH ALAMO STREET, SAN ANTONIO, TEXAS 7 8 2 0 4 IN DOUBT.

AS TO THE PROCESS DURING THIS TIME, PLEASE CONTACT THE CODE O CODE ENFORCEMENT OFFICER.

ANY O OWNER OR LIEN HOLDER DISSATISFIED WITH THE ORDER OF THIS BOARD MAY FILE AN APPEAL IN THE CIVIL DISTRICT COURT WITHIN 30 DAYS AFTER THE DATE THAT THIS ORDER IS MAILED.

IF YOU HAVE ANY QUESTIONS REGARDING THE ORDERS, PLEASE CONTACT THE CODE ENFORCEMENT OFFICER OR DEVELOPMENT SERVICES STAFF MEMBER BY PHONE AT (210) 207-5422.

PLEASE NOTE THAT IT IS UNLAWFUL FOR ANY PERSONS PRESENT TO SOLICIT OR PEDAL SERVICES RE REGARDING ANY PROPERTY UNDER CONSIDERATION BY THIS BOARD DURING THE COURSE OF THIS PUBLIC HEARING.

AS PER CITY CODE SECTION 16 DASH 2 3 6.

THANK YOU.

[ Approval of Minutes  ]

DO I HAVE A MOTION ON THE MINUTES I MOVE TO APPROVE MS. JOEL? OKAY.

DO WE HAVE A SECOND? SECOND.

I SECOND.

ALL IN FAVOR SAY AYE.

AYE.

AYE.

ANY OPPOSED? ORDER PASSES OR APPROVAL OF MINUTES PASSES? SORRY.

UM,

[ Briefing and Possible Action on the following items  ]

CAN WE HAVE THE STAFF REPORT PLEASE? GOOD MORNING, BOARD MEMBERS.

GOOD MORNING.

MY NAME IS JENNY RAMIREZ.

I DO HAVE A COUPLE OF ITEMS TO READ INTO THE RECORD THIS MORNING, IF I MAY PROCEED.

YES.

[00:05:01]

WE HAVE, UM, AN EMERGENCY DEMOLITION THE STRUCTURE LOCATED AT 5 63 WEST HERMOSA DRIVE LOCATED IN CITY COUNCIL.

DISTRICT NUMBER ONE, UM, WAS DEMOLISHED ON APRIL THE FIRST OF 2026 DUE TO A FIRE WHICH OCCURRED ON MARCH 17TH, 2026.

PURSUANT TO CHAPTER SIX DASH 1 75, NO FURTHER ACTION IS NEEDED BY THE BOARD AT THIS TIME.

THERE ARE BEFORE AND AFTER PHOTOS NEXT PROPERTY.

THE STRUCTURE LOCATED AT ONE 11 EAST VIRAY BOULEVARD WAS, UM, IN COUNCIL DISTRICT THREE WAS DEMOLISHED ON APRIL THE SECOND OF 2026 DUE TO A FIRE WHICH OCCURRED ON MARCH 21ST, 2026.

PURSUANT TO CHAPTER SIX DASH 1 75, NO FURTHER ACTION IS NEEDED BY THE BOARD AT THIS TIME.

AND THERE ARE BEFORE AND AFTER PHOTOS OF ACTION TAKEN.

THAT DOES COMPLETE MY REPORT THIS MORNING UNLESS THERE'S ANY QUESTIONS.

OKAY.

THANK YOU.

THANK YOU.

OKAY, WE'RE DOING 7 25 RIVER STREET.

IT'S SENT ON GOOD MORNING BOARD.

GOOD MORNING FOR THE RECORD.

MY NAME IS CYNTHIA SANTANA, DANGEROUS PREMISE OFFICER FOR THE CITY OF SAN ANTONIO DEVELOPMENT SERVICES DEPARTMENT.

THE STRUCTURE BEING PRESENTED TODAY IS LOCATED AT 7 25 ROPER STREET WITH A RECOMMENDATION FOR DEMOLITION IN ACCORDANCE WITH CITY CODE ARTICLE EIGHT, CHAPTER SIX.

THIS CASE IS THE FIRST TIME BEING HEARD BEFORE THIS BOARD.

THE LEGAL DESCRIPTION IS NCB 1 1 7 3 BLOCK TWO LOT 13, LOCATED IN CITY COUNCIL DISTRICT TWO.

THE OWNER ON RECORD IS JOSE ALBERTO WADO WITH A MAILING ADDRESS OF 1605 EAST CARSON STREET, SAN ANTONIO, TEXAS 7 8 2 0 8 DASH 1614.

ALL NOTICES OF HEARING WERE PROPERLY ISSUED AS REQUIRED.

UH, THE FOLLOWING INDIVIDUALS ARE PRESENT ON BEHALF OF THE CASE.

UH, THE OWNER, MR. HUARDO AND, UH, A FRIEND CHERYL TEE, A PHONE NUMBER WAS FOUND FOR, AND I HAVE SPOKEN WITH THE OWNER, THE OFFICE OF HISTORIC PRESERVATION HAS CONFIRMED ON FEBRUARY 19TH, 2024 THAT THE PROPERTY IS NOT ELIGIBLE FOR HISTORIC DESIGNATION.

THE FOLLOWING IS A TIMELINE OF EVENTS REGARDING THE NOTIFICATION PROCESS.

THE FIRST INSPECTION REGARDING 7 25 ROPER STREET WAS CONDUCTED ON SEPTEMBER 19TH, 2023.

ORIGINAL NOTICE WAS MAILED AND ON SEPTEMBER 25TH, 2023 AND THE CERTIFIED RECEIPT WAS UNCLAIMED.

A SECONDARY NOTICE OF VIOLATION WAS MAILED ON NOVEMBER 4TH, 2025, AND CLAIMED ON NOVEMBER 6TH, 2025 ON MARCH 26TH, 2026.

THE NOTICE FOR THE BSB HEARING WAS POSTED AT 7 25 ROPER STREET ON MARCH 24TH, 2026.

THE NOTICE FOR THE BSB HEARING WAS MAILED TO THE OWNER AND THE CERTIFIED RECEIPT HAS NOT BEEN RETURNED.

NO SCOPE OF WORK OR FINANCIAL PROOF OR LETTER OF CREDIT OR ENGINEER'S REPORT HAD BEEN PROVIDED, UH, TO ME.

I DO BELIEVE THE OWNER HAS BROUGHT SOME DOCUMENTATION, UH, FOR THE BOARD TODAY.

THERE IS A FOUNDATION PERMIT ON FILE.

THE MINOR, MINOR COMMERCIAL REPAIR PERMIT WAS WITHDRAWN BY THE BUILDING DEPARTMENT FOR DISCREPANCIES IN THE APPLICATION.

THE MAJORITY OF THE PHOTOS BEING PRESENTED, UH, TODAY WERE TAKEN ON MARCH 10TH, 2025, OR I'M SORRY, 2026 WITH ADDITIONAL PHOTOS FOR CONTEXT, UH, THAT WERE TAKEN ON SEPTEMBER 30TH AND OCTOBER 13TH, 2025, AS WELL AS FEBRUARY 25TH AND MARCH 26TH, 2026.

[00:10:10]

THANK YOU.

I WANTED TO INCLUDE THE SATELLITE IMAGERY OF THE STRUCTURE.

UM, AS WE GO THROUGH IT, IT, IT KIND OF SEEMS AS THOUGH THERE MAY BE TWO STRUCTURES, BUT THIS IS ACTUALLY ONE AND I JUST WANTED TO MAKE SURE THAT, UH, YOU HAD THE OPPORTUNITY TO SEE IT FROM ABOVE.

OKAY.

THIS PHOTO IS OF THE FRONT ELEVATION AS IT FACES ROPER STREET SHOWING A SINGLE STORY STRUCTURE IN A COMMERCIAL ZONE.

UM, THE STRUCTURE IS 2,504 SQUARE FEET ACCORDING TO BEXAR COUNTY APPRAISAL DISTRICT.

UM, SOME OF THE, THE PORTIONS OF THE STRUCTURE ARE BEING DEMOLISHED.

UM, THE MAIN STRUCTURE WAS, UH, CONSTRUCTED IN 1935.

UH, THE ADDITION OF THE CONCRETE SECTION THERE, UM, WAS BUILT IN 1955.

THE STRUCTURE, UH, HAS A PURIN BEAM FOUNDATION UNDER THE LEFT SIDE.

UH, THE SLAB ON GRADE FOUNDATION IS ON THE ADDITION TO THE RIGHT.

THE LEFT SIDE HAS A CROSS GABLE ROOF WITH SHINGLES, WOOD SIDING, AND THE ADDITION HAS A FLAT ROOF WITH ROLLED ROOFING AND CINDER BLOCK WALL CONSTRUCTION.

THIS STRUCTURE IS LOCATED WITHIN A THOUSAND FEET OF PERSHING ELEMENTARY, WHICH IS EXACTLY ONE STREET OVER TO THE LEFT OF THE STRUCTURE.

THERE'S BEEN NO WATER AT THIS LOCATION SINCE NOVEMBER 23RD, 2025, AND IT HAS NO ACTIVE ELECTRICITY ACCOUNT.

THE FRONT OF THE STRUCTURE HAS EXPOSED STUDS, A LACK OF WEATHER PROTECTION AND IS UNLEVEL.

THIS IS A VIEW OF THE RIGHT SIDE OF THE FRONT ELEVATION.

UH, HERE.

THE INTERIOR SIDE OF THE ADDITION IS EXPOSED AS THE ORIGINAL BUILD HAD PULLED AWAY FROM IT.

UM, WHEN THE PURIN BEAM FOUNDATION FAILED, THE EXPOSED STRUCTURAL MEMBERS AT THE TOP OF THE ADDITION WERE ONCE ATTACHED TO A ROOM AT THE FRONT OF THE ORIGINAL BUILD, UH, WHICH HAS, UM, RECENTLY BEEN DEMOLISHED.

THIS IS THE LEFT SIDE OF THE FRONT ELEVATION.

THE SIDING LACKS WEATHER PROTECTION AND THE FLOOR JOISTS ARE EXPOSED TO THE ELEMENTS ALONG WITH THE WALL STUDS THAT YOU CAN SEE ON THE RIGHT SIDE OF THE PHOTO HERE.

YOU CAN ALSO SEE ACCESSORY NUMBER TWO, UH, TO THE LEFT OF THE PHOTO, UH, WHICH APPEARS TO BE A SMALL CARPORT.

THIS PHOTO IS OF THE LEFT ELEVATION.

THE FLOOR JOISTS ARE ROTTED AND EXPOSED TO THE ELEMENTS.

THE SIDING LACKS WEATHER PROTECTION AND THE STRUCTURE IS UNLEVEL.

YOU CAN SEE THE FRONT ELEVATION IS LISTING FORWARD TOWARDS THE STREET.

THIS PHOTO IS OF THE RIGHT SIDE.

UH, UH, I'M SORRY.

THIS IS THE RIGHT SIDE OF THE REAR ELEVATION.

UH, THERE WAS A BATHROOM HERE AS RECENTLY AS OCTOBER, 2025.

I HAD WRITTEN A CITATION FOR THE DEMOLITION WITHOUT A PERMIT.

HOWEVER, THE OWNER STATED THAT HE DID NOT DEMOLISH IT, THAT IT, UH, RATHER FELL OFF.

THE STRUCTURE IS UNLEVEL AND PULLING AWAY FROM THE ADDITION IN THE CENTER OF THE PHOTO THERE.

THIS PICTURE SHOWS THE LEFT SIDE OF THE REAR ELEVATION.

HERE YOU CAN SEE THE RAFTERS ARE DETERIORATED AND MISSING.

THE CINDER BLOCK WALLS HAVE SIGNIFICANT STEP CRACKING FROM THE FOUNDATION, WHICH IS SINKING INTO THE GRADE.

ON THIS SIDE, THIS IS THE RIGHT ELEVATION.

THE DECKING AND THE RAFTERS ARE SIGNIFICANTLY DETERIORATED, MISSING IN LOCATIONS AND WATER DAMAGED.

THE WALL IN THE CENTER OF THIS ELEVATION IS CAVING IN TOWARDS THE STRUCTURE.

THIS IS A CLOSEUP OF THAT SEPARATION THAT OCCURRED, UH, BETWEEN THE ORIGINAL BUILD AND THE ADDITION WHEN THE PURIN BEAM FOUNDATION FAILED.

THE STEP CRACKING IS ALSO VISIBLE ON THIS ELEVATION TO THE RIGHT OF THE PHOTO.

THIS PHOTO IS FROM FEBRUARY 25TH, 2026 OF THE FRONT ELEVATION.

SHOWING THE ROOM, UH, TO THE FRONT THERE, I'VE HIGHLIGHTED IT, UH, THAT WAS DEMOLISHED WITHOUT A PERMIT.

UH, THE OWNER HAS NOT SPECIFIED, UH, WHETHER OR NOT THAT FELL OFF.

[00:15:01]

THIS WAS THE INSIDE OF THAT ROOM LAST OCTOBER, UM, SHOWING THE AMOUNT OF LISTING THAT HAD OCCURRED FROM THE DAMAGED FOUNDATION.

AND THIS IS WHAT IT LOOKED LIKE ON MARCH 10TH.

THE SHINGLES ON THIS STRUCTURE, UH, WERE PUT ON, UM, ACCORDING TO SATELLITE IMAGERY, SOMETIME BETWEEN 2022 AND 2024 WITHOUT A PERMIT.

THIS IS THE BATHROOM ON THE REAR ELEVATION, UH, IN SEPTEMBER, 2025.

AND THIS IS AN INTERIOR PHOTO OF THAT AREA IN OCTOBER.

NATURAL LIGHT IS VISIBLE FROM ALMOST EVERY ANGLE, AND THIS IS A CLOSEUP OF THAT AREA.

IN MARCH.

UH, THE FOUNDATION SILL BEAMS ARE DEFLECTED, ROTTED, AND EXPOSED TO THE ELEMENTS.

THE PLUMBING DRAINS AND THE SEWER PIPES ARE DAMAGED.

UH, THE CEDAR POSTS ARE LEANING HEAVILY TO THE RIGHT UNDER WHERE THE BATHROOM WAS.

THE SIDING IS WATER DAMAGED AND LACKS WEATHER PROTECTION.

INTERIOR WALLS ARE NOW EXPOSED TO THE ELEMENTS AND THE FASCIA IS WEATHERED FROM THE ANGLE.

YOU CAN SEE THE CONDITION OF THE ROOF STRUCTURE ABOVE THE ADDITION.

YOU CAN CLEARLY SEE THE MISSING DECKING, THE BROKEN AND DETERIORATED RAFTERS.

THE STEP CRACKING IS ALSO VISIBLE ON THIS RIGHT ELEVATION.

UM, THIS ANGLE SHOWS THE EXTERIOR WALL ON THE RIGHT ELEVATION IS LISTING INTO THE STRUCTURE.

IN THE NEXT PHOTO, WE ARE GOING TO WHAT, CAN WE GO BACK JUST A SECOND IN THE NEXT PHOTO? UH, WE'RE GOING TO WALK THROUGH THAT DOOR RIGHT THERE IN THE CENTER OF THE STRUCTURE JUST SO YOU HAVE AN IDEA OF, OF WHAT WE'RE LOOKING AT.

THANK YOU.

AS YOU WALK INTO THIS ADDITION AND YOU LOOK DIRECTLY UP, YOU CAN SEE THE EXTENT OF THE WATER DAMAGE, UH, THAT HAS OCCURRED, LEAVING THE DECKING WITH EXTENSIVE HOLES EXPOSING THE INTERIOR TO THE WEATHER ELEMENTS.

THE RAFTERS ARE WATER DAMAGED.

THE ROOF SHEATHING AND ROOF COVERING ARE DAMAGED.

THE INTERIOR WALL, UH, COVER IS, UM, BUCKLING FROM THE WATER ON THE LEFT SIDE OF THE PHOTO THERE.

INSULATION AND DRYWALL HAVE COLLAPSED FROM THE CEILING.

THIS IS THE SAME, THE SAME DAMAGE OCCURS ACROSS THE ENTIRE FRONT OF THE RIGHT ELEVATION WITH RAFTERS BREAKING AND COLLAPSING FROM YEARS OF EXPOSURE TO THE ELEMENTS.

LOOKING TO THE RIGHT AS YOU WALK IN THAT DOOR, YOU CAN SEE NATURAL LIGHT AT THE CEILING AND THE EXTENT OF STEP CRACKING ON THE, THIS IS THE REAR ELEVATION WALL.

THIS IS THE FRONT ELEVATION WALL.

UM, LOOKING TO THAT TO THE LEFT, UH, FROM THAT DOOR.

IT HAS THE SAME DEFICIENCIES WITH NATURAL LIGHT VISIBLE AT THE ROOF.

AND STEP CRACKING IS SO SEVERE THAT YOU CAN SEE THE NATURAL LIGHT COMING THROUGH THE CINDER BLOCKS THERE.

CEILINGS ON THE ORIGINAL BUILD ARE HEAVILY DAMAGED BY WATER ENTERING THE STRUCTURE.

UH, THE WOOD PLANKS ARE WARPED, DETERIORATED, AND COLLAPSING.

THE WALL PLASTER IS CRACKED AND SEPARATING.

THIS IS A ROOM, UH, TOWARDS THE FRONT OF THE ORIGINAL BUILD, UM, WITH THE SAME DEFICIENCIES AND YET ANOTHER ROOM, UH, IN THE FRONT OF THE ELEVATION OF THE ORIGINAL BUILD.

THIS IS THE FLOORING ON THE ORIGINAL BUILD.

UH, THIS IS VERY CLOSE TO THE ADDITION.

UH, THAT CORRUGATED METAL SHEET THAT YOU SEE IN THE MIDDLE WAS AN ACTUAL DOORWAY TO THE, UM, ADDITION THAT YOU COULD WALK THROUGH.

AND AS IT FURTHER, UH, DETERIORATED, IT SEPARATED, UM, AND YOU HAD TO WALK ACROSS A PLANK TO GET FROM ONE UH, STRUCTURE TO THE OTHER AS THEY HAD SEPARATED.

THE SUBFLOOR IS EXPOSED IN ALL THE ROOMS. UH, YOU HAVE TO STEP UP ONTO THE BOARDS JUST PAST THIS GAP.

UH, AS THERE IS A SIGNIFICANT SHIFT IN THE LEVEL OF THE FLOOR.

THE GRADE IS VISIBLE THROUGH THE WOOD FLOORING THROUGHOUT THE ENTIRE STRUCTURE.

THIS IS ACCESSORY ONE IN THE REAR YARD, WHICH APPEARS TO HAVE SOME, UH, BE SOME TYPE OF WOOD SHED.

IT WAS BUILT WITH METAL PIPING DIRECTLY INTO THE GRADE AND HAS A CORRUGATED METAL ROOF COVERING.

MOST OF THE PIPING ON THE LEFT SIDE IS COLLAPSED.

THE COVERING IS MISSING

[00:20:01]

AND IT IS LISTING TO THE LEFT.

THIS IS A CLOSEUP PORTION OF THE STRUCTURE THAT IS STILL UPRIGHT.

THE METAL ROOFING IS SEPARATED FROM THE POLES AND RUSTED.

THIS IS THE RIGHT ELEVATION, WHICH HAS A LACK OF WEATHER PROTECTION AND IS RUSTED ON BOTH ENDS.

THIS IS ACCESSORY TO, UH, THE CARPORT AT THE FRONT OF THE MAIN STRUCTURE CONSTRUCTED WITH METAL POSTS DIRECTLY INTO THE GRADE WOOD DECKING WITH METAL SHEETS ON TOP.

THE RAFTERS ARE WATER DAMAGED AND LACK WEATHER PROTECTION.

THE ROOF IS SAGGING IN THE CENTER AND THE DECKING IS WATER DAMAGED, DECAYED, AND HAS HOLES.

THIS STRUCTURE HAS BEEN DETERIORATING FOR APPROXIMATELY SEVEN YEARS, UH, WITH SATELLITE IMAGERY INDICATING VISIBLE DECLINE SINCE 2019.

THE IMAGERY SHOWS HOLES IN THE ROOF OVER THE BATHROOM AREA, WHICH IS NOW DETACHED FROM THE MAIN STRUCTURE ALONG WITH THE REAR ELEVATION.

DUE TO NEGLECT BY THE OWNER, THE INITIATING OFFICER GRANTED THE PROPERTY OWNER A NINE MONTH HARDSHIP PERIOD DURING 2023 TO 2024.

DURING THAT TIME, THE OWNER REPLACED THE ROOFING SHINGLES WITHOUT OBTAINING THE REQUIRED PERMITS.

NO ADDITIONAL WORK WAS PERFORMED UNTIL I CONDUCTED MY INITIAL INSPECTION.

AFTER RECEIVING THE CASE IN SEPTEMBER OF 2025, AT WHICH TIME I REQUESTED INTERIOR PHOTOS, A NEW NOTICE OF VIOLATION WAS ISSUED TO THE OWNER, AT WHICH POINT IT APPEARED.

HE UNDERSTOOD THE STRUCTURE WOULD BE BROUGHT BEFORE THIS BOARD.

SUBSEQUENTLY, MR. HUARDO BEGAN FOUNDATION REPAIRS WITHOUT A PERMIT.

ONLY AFTER A CITATION WAS ISSUED DID HE OBTAIN THE REQUIRED PERMIT.

THE OWNER CONTACTED ME SHORTLY AFTER RECEIVING THE CITATION TO STATE THAT HE HAD ALREADY, HE ALREADY HAD A FOUNDATION PERMIT.

HOWEVER, RECORDS SHOW THE PERMIT WAS PURCHASED APPROXIMATELY 20 MINUTES AFTER THE CITATION WAS ISSUED.

THIS MATTER PROCEEDED TO MUNICIPAL COURT WHERE HE WAS FOUND LIABLE.

THE OWNER LATER APPLIED FOR A COMMERCIAL REPAIR PERMIT, WHICH WAS SUBSEQUENTLY WITHDRAWN BY THE BUILDING DEPARTMENT DUE TO INACCURATE REPRESENTATIONS OF THE WORK BEING PERFORMED.

DESPITE THE WITHDRAWAL DEMOLITION ACTIVITY CONTINUED ON THE FRONT PORTION OF THE STRUCTURE, THE STRUCTURE EXHIBITS SIGNIFICANT DEFICIENCIES ACROSS ALL MAJOR COMPONENTS FROM THE FOUNDATION TO THE ROOFING SYSTEM.

FLOOR JOISTS, SEAL BEAM, SEAL BEAMS, WALL STUDS, AND CEILING JOISTS ARE ROTTED AND DETERIORATED.

THE FOUNDATION UNDER THE, UH, ORIGINAL STRUCTURE IS UNEVEN AND FAILING.

WHILE THE ADDITION IS SINKING INTO THE GRADE.

CINDER BLOCK WALLS HAVE SHIFTED ON ALL THE ELEVATIONS, CREATING VISIBLE GAPS THAT ALLOW NATURAL LIGHT TO PASS THROUGH ROOF FAILURE OVER THE ADDITION HAS RESULTED IN EXTENSIVE DETERIORATION OF THE RAFTERS, MANY OF WHICH ARE BROKEN AND MISSING ENTIRELY.

TO RECAP, THE STRUCTURE LOCATED AT 7 25 ROPER STREET IS IN VIOLATION OF CITY CODE ARTICLE EIGHT, CHAPTER SIX DASH 1 56.

SUBSECTIONS 1 2 5 7 8, 12, 15, 17, AND 18 FOR THE MAIN 7, 8, 12, AND 15 FOR ACCESSORY ONE, THE WOODSHED AND 5 8, 12, AND 15 FOR ACCESSORY TO THE CARPORT IN WHICH ANY BUILDING OR STRUCTURE WHICH HAS HAD ANY OR ALL OF THE CONDITIONS OR DEFECTS HEREIN AFTER DESCRIBED, SHALL BE DEEMED TO BE A DANGEROUS BUILDING AND A HAZARD TO PUBLIC HEALTH, SAFETY AND WELFARE.

PROVIDED THAT SUCH CONDITIONS OF DEFECTS OF DILAPIDATION, SUBSTANDARD, OR UNFITNESS FOR HUMAN HABITATION POSE A THREAT OR POTENTIAL THREAT TO LIFE, HEALTH, PROPERTY OR HUMAN SAFETY STAFF RECOMMENDS DEMOLITION.

THAT CONCLUDES MY PRESENTATION FOR 7 25 ROPER STREET.

DOES ANYONE HAVE QUESTIONS? THIS IS FRED ANDERSON.

UH, ON, UH, 10 17 23.

THERE'S A PIECE IN HERE THAT'S INTRIGUING.

IT SAYS PROPERTY FALLS WITHIN THE VACANT BUILDING PROGRAM.

WHAT HAPPENED? IT'S NOT IN THE VACANT BUILDING PROGRAM.

WHY? I DON'T KNOW THE, THEY WOULD HAVE TO ANSWER THAT QUESTION.

I DON'T HAVE ANY, UM, ANY INFORMATION FROM THAT DEPARTMENT.

DID STAFF HAVE A ANSWER? GOOD MORNING.

UH, THIS IS KATHY RODRIGUEZ, DEVELOPMENT SERVICES ADMINISTRATOR.

UM, YES.

THIS WAS AN ACTIVE CASE WITH THE VACANT BUILDING PROGRAM.

UM, WE DID FILE CASES.

THE OWNER DID REGISTER, UH,

[00:25:01]

RECEIVED SOME FEE WAIVERS BECAUSE HE WAS DEMONSTRATING EFFORTS TOWARDS IMPROVING CONDITIONS, UM, BECAUSE THE, UH, OWNER HAS NOT, UM, MADE THE PROGRESS THAT HE COMMITTED TO ALONG THE WAY.

FOR THAT REASON, THE CASE WAS, UH, RECOMMENDED TO MOVE FORWARD TO THE BSB.

ALL RIGHT.

'CAUSE IT WASN'T IN THE NOTES AND I DIDN'T HEAR HER MENTION ANYTHING WHY IT WASN'T OR TOOK OUT, SO, OKAY.

THAT EXPLAINS IT.

ALRIGHT, THANK YOU.

JUST LOOKING FOR CLARIFICATION, YOU'RE ASKING FOR DEMOLITION, BUT IN THE, UH, THE WRITEUP OF THE REPORT, THERE'S ACTUALLY SAYING THAT THIS SHOULD BE DECONSTRUCTED.

CORRECT? UH, THE DECONSTRUCTION COMES AS A DETERMINATION, UM, BASED ON AN ORDINANCE.

THE CITY HAS THAT WHEN A CERTAIN STRUCTURE, UH, WAS BUILT AT BEFORE A CERTAIN TIME PERIOD, THAT IF IT IS ORDERED DEMOLISHED, THAT IT'S REQUIRED THAT WE GO IN, WE RECLAIM SOME OF THE WOOD FROM THE STRUCTURE AND IT GOES INTO A PROGRAM, UH, FOR THAT, FOR THAT ORDINANCE.

SO IN THIS PARTICULAR CASE, IS THERE ACTUAL MATERIAL THERE TO BE RECLAIMED? THAT WOULD BE DETERMINED, UM, BY OHP.

SO EVEN IF, IF WE WERE TO MOVE FORWARD WITH A DEMOLITION, THAT WOULD ACTUALLY INVOLVE LOOKING TO, SEEING IF THERE'S ANYTHING SALVAGEABLE, CORRECT.

SALVAGE WOULD HAPPEN.

THEY DO COME AND DO AN EVALUATION.

THANK YOU.

YOU'RE WELCOME.

IF A CHAIRWOMAN, IF I COULD ADD A LITTLE MORE, UH, INFORMATION AND DETAIL FOR THE EDUCATION OF THE BOARD.

SO YES, IT'S CORRECT.

THE CITY HAS AN ORDINANCE THAT REQUIRES PRIVATE OR CITY ORDER DEMOLITION TO BE DECONSTRUCTED IF THE STRUCTURE IS OLDER THAN 1945 WITHIN THE CITY LIMITS.

AND THAT PROCESS, WHAT IT LOOKS LIKE IS ONCE THE ORDER OR A PERMIT IS APPROVED FOR DECONSTRUCTION, THE CONTRACTOR WILL DO AN ASSESSMENT AND CREATE A PLAN FOR SALVAGING MATERIALS THAT ARE SALVAGEABLE.

AND THEN THOSE ARE EITHER RETAINED BY THE OWNER OR THEY ARE DONATED TO THE CITY'S MATERIAL INNOVATION CENTER.

AND THOSE MATERIALS ARE MADE AVAILABLE FOR AFFORDABLE HOUSING PROJECTS WHERE THEY ARE PRESERVING, UH, EXISTING HOUSING STOCK.

UH, MADAM CHAIR, UM, DOES THIS PROPERTY CURRENTLY HAVE ELECTRICAL OR WATER SERVICE? IT DOES NOT.

THANK YOU.

IS THERE ANY PROBLEM WITH CRIMINAL ACTIVITY OR BREAK-INS? NO, WE HAVE NOT HAD ANY REPORTS OF THAT.

OKAY.

ANY OTHER QUESTIONS? OKAY, THANK YOU.

UH, WE DO HAVE, UH, TWO PEOPLE SIGNED UP TO SPEAK.

UM, WE'LL HEAR FROM THE OWNER.

CHRIS, GOOD MORNING BOARD.

UH, MY NAME IS JOSE GUDO.

I'M THE OWNER.

AND CAN YOU STATE YOUR ADDRESS FOR THE, OR YOUR CITY COUNCIL DISTRICT? YES, UH, I FOR THE HOUSE 7 25 FOR THE 7 25 ROBERT STREET.

OKAY.

I LIVE JUST ACROSS THE STREET ON THE FRONT.

SO, UH, ALL THE TIME, UH, I DECIDE TO NOT PUT THE ELECTRICITY AND WATER BECAUSE SOMETIMES WHEN I TURN IT DOWN, I MEAN, UH, I, I, I CALLED TO CUT THE WATER SERVICE AND THE ELECTRICITY WAS BECAUSE I DON'T NEED IT AND EXCEPT SOME TIME, BUT, UH, AND BROKE THE, FOR THE ICE WHEN IT'S COLD.

SO I NEED REPAIR.

SO I, I DECIDE NOT GET THE WATER SERVICE AND THE ELECTRICITY BECAUSE THE TREE FALL DOWN OVER THE, UH, WIRES, HIGH VOLTAGE WIRES.

SO I MAKE THEM SOME DAMAGE.

SO I DECIDE, CUT IT RIGHT AWAY TO KNOW, UH, TO CUT IT DOWN AND THEY REMOVE ALL COMPLETE THE LINE.

SO I TRY TO MAKE THE BEST POSSIBLE TO MAKE IT RIGHT.

THE THINGS, BECAUSE I LIVE ACROSS THERE NEVER WAS BACKHAND BECAUSE ALL THE TIME I TURN IT AROUND TO SEE WHAT IS, HOW IS MY PROPERTY, AND, AND I DECIDE TO PAY ATTENTION TO SEE IF I CAN START WORKING TO FIX IT.

BUT I WAS SICK AND VERY HARD.

MY HANDS, I COULDN'T MOVE ANYTHING FOR A LONG PERIOD OF TIME.

BUT THE DOCTORS SAY THAT YOU DON'T HAVE A PROBLEM BECAUSE THEY TOOK ME OPIA FROM HERE AND THEY SAY, NO, IT'S NO CANCER.

BUT THEY DON'T KNOW THE SPECIALIST WHAT HAPPENED WITH YOUR HANDS AND WAS VERY HARD TO, TO PAINTS AND CUT IT FROM INSIDE TO OUTSIDE.

SO NOW I'M, I'M FINE.

I HAVE A RECORDS ON THAT IF YOU NEED IT TO.

I, WHAT I KNOW NEED, I TAKE TIME TO DO IT.

WHEN I DECIDE TO PUT THE, THE ROOF, IT IS BECAUSE IT WAS MY FIRST TIME AND THE PEOPLE HELP ME TO, TO DO IT.

THEY SAY, WELL, WE CAN JUST REPAIR WHAT IS THE LEAKS, BECAUSE I DON'T WANT TO GET MORE WATER INSIDE THE HOUSE.

SO I SAY, WELL CHECK IT, BUT AT THE TIME THEY CHECK IT, THEY SAY THEY START MOVING EVERYTHING.

[00:30:01]

SO, OKAY, YOU ALREADY REMOVED TOO MUCH, SO KEEP GOING.

THEY'RE GONNA TRY TO GET THE PERMITS.

BUT I COULDN'T IN THAT MOMENT.

I JUST GET ALL THE PERMITS.

IT'S ON RECORDS JUST TO START DOING THE OTHER THINGS ON THE BUILDING, ON THE, UH, COMMERCIAL TO START, TRY TO NOT GET TOO MUCH WATER OR SOMETHING MORE DAMAGED, BUT THE SAME THING.

SO, UH, THE WEATHER WAS TOO HARD AND PUT MORE WATER, BUT ON THE OTHER SIDE, DOESN'T MATTER TOO MUCH BECAUSE IT WAS CONCRETE, EVERYTHING INSIDE, SO THE WATER RUNNING TO THE DRAINAGE AND GO AWAY.

BUT EVEN IF THAT HAPPENED, I HAVE ALREADY, UH, NOW THE, THE TALK TO HERE FOR THE PERMITS, EVERYTHING TOLD ME IS A COMMERCIAL, EVERYTHING.

SO DO YOU NEED, YOU NEEDED A, A SPECIAL, UH, PERMIT FOR THAT WITH ENGINEER.

OKAY.

I FIND THE ENGINEER AND THE, UH, UM, THE, THE FOUNDATION MAN, THE REPAIR, THEY HAVE EVERYTHING FOR MAKER LIKE A BUSINESS, UH, COMMERCIALS, PILES OR CONCRETE.

SO THEY GIMME THE PERMISS TO KEEP GOING.

SO WE START MOVING AND START, UH, FIX IT.

BUT THE PART OF THE FRONT AND THE BACK WAS FALL DOWN WAS BECAUSE SOMETIMES TWO LONG TIME AGO, THEY NO MAKE IT RIGHT AND WAS CROOKED, CROOKED AND CROOKED.

AND WHEN THEY START LEVEL IT THAT FALL DOWN, EVERYTHING WE, WE REMOVE IT BECAUSE WE DON'T WANT DAMAGE FOR THE PEOPLE WORKING THERE IS WHY.

WE JUST TAKE IT DOWN, WHATEVER FALL DOWN.

AND I HAVE THE PICTURE WHEN THE WORK THE WORKERS WERE, THEY WAS THERE WHEN THEY FALL DOWN.

SO I DON'T KNOW IF MY ENGLISH IS VERY GOOD BECAUSE IT'S WHY I HAVE MY FRIEND TO EXPLAIN MORE, BUT I TRY TO MAKE THE BEST POSSIBLE.

SO, UH, RIGHT NOW IN THIS, AT THIS POINT, I HAVE THE ENGINEER TO WORKING FOR THE, UH, BLUEPRINTS.

FOR THE CONTAINER.

FOR THE PERMIT, RIGHT PERMITS AND UH, TO MAKE A RIGHT TO REBUILD ON THE BACK AND THE FRONT FOR THE HOUSE.

AND I HAVE THE CONTRACT ALREADY FOR THE, UH, WAR FOUNDATIONS TO START, UH, STABILIZE THE CONCRETE BUILDING BECAUSE IT'S, HE SAY YOU DON'T NEED IT LEVEL IT, BECAUSE IT'S NOT OUT LEVEL TOO MUCH.

THE PROBLEM ON THE, ON THE FRONT WHERE YOU SEE IT IS JUST THE WOOD.

SO THAT IS NOT THE CONCRETE IS THE WOOD.

OKAY.

SO I DESIRE, UH, GET CONTRACT FROM HIM TO START, UH, WHEN WE HAVE THE PERMIT TO DOING THE CONCRETE ON THE BUILDING.

BUT RIGHT NOW THE, THE PRIORITY FOR ME IS THE, UM, THE ROOF TO NOT HAVE MORE DAMAGE TO THE WOOD.

SO I HAVE ALREADY THE CONTRACT TO SEE IF THEY CAN HELP ME AND THEY SAY, YES, WE CAN HELP YOU TO FI TO REMOVE ALL THE ROOF BED AND PUT IN THE NEW ROOF AND CHECK ALL THE, THE, THE WOOD JUST TO PUT THE, THE, THE ROOF TO NOT HAVE MORE WATER, EVEN TO NO DAMAGE TO THE HOUSE.

SO, OKAY, BUT I NEED NOW THE PERMIT.

SO LET ME SAY, UH, SEE IF I CAN MAKE IT, UH, THE PERMIT FOR THE, THE ROOF JUST FOR, UH, STORAGE FOR THE MOMENT, JUST FOR THE STORAGE TO MAKE EVERYTHING CLOSE.

AND, AND, AND THEN, AND THEN WE HAVE SOMETHING TO START, MAKE SPACE TO GET ALL THE MATERIAL WHAT I NEED TO KEEP WORKING ON, ON THE, UH, HOUSE AND BUILDING.

I DON'T KNOW IF I TALKING TOO FAST, I, MY ENGLISH IS NOT TOO GOOD, BUT IT IS WHAT IT IS WHAT I HAVE ALREADY AND, AND HANDS AND, AND I HAVE DEMAND TO, UH, TO WORKING WITH ME ON THE CONSTRUCTION, UH, STRUCTURAL, UH, UH, WOOD FOR BOATS IN THE BACK AND THE FRONT TO MAKE A RIGHT WITH THE ENGINEER.

HAVE YOU SUBMITTED ALL ? OH, SORRY.

YES.

HAVE YOU SUBMITTED THOSE DOCUMENTS? YES.

OKAY.

CAN WE SEE THOSE? I HAVE ALL THE PROOFS.

WHAT I'M DOING CHAIR, THIS IS JUDY KRUM.

ON THE SCREEN IS A ENGINEER'S LETTER.

WE ALSO HAVE PAYMENT RECEIPTS, FOUNDATION LEVELING DOCUMENTS, BLUEPRINTS AND PHOTOS TO PRESENT.

UH, MADAM CHAIR.

YES.

UH, SO CAN WE SEE THOSE DOCUMENTS ON THE SCREEN NOW? ARE THE BLUEPRINTS,

[00:35:49]

THE DOCUMENT ON THE SCREEN IS RELATED TO THE FOUNDATION.

THE DOCUMENT ON YOUR SCREEN IS RELATED TO PAYMENT RECEIPTS.

WE ALSO HAVE SOME PHOTOS THAT WERE PRESENTED BY THE OWNER.

OKAY.

UM, MADAME CHAIR? YES.

UH, AS, AS I UNDERSTOOD THOSE DOCUMENTS, THE FOUNDATION, UH, CONTRACT WAS, UH, ISSUED OCTOBER 17TH, UH, 1925.

IT DID NOT APPEAR FROM THE PHOTOGRAPHS THAT THAT WORK WAS COMPLETE.

IS IS THE FOUNDATION WORK COMPLETED? NOT YET.

IT'S ALMOST BECAUSE IT WAS HARD TO LEVEL IN, BUT IT'S CLOSE TO FINISH OF THE HOUSE.

SO WHEN DO YOU ANTICIPATE THAT WORK BEING COMPLETE? EXCUSE ME? WHEN, WHEN WILL IT BE COMPLETE? OH, WELL, UH, THEY SAY IT IS VERY CLOSE.

I DON'T KNOW.

I NEED TO ASK HIM TO THE, TO THE MEN WHEN HE GONNA COMPLETE IT.

BUT IT'S, UH, VERY CLOSE TO COMPLETED BECAUSE IT'S, THEY ALREADY START MARKET WHERE THE CONCRETE PILOT'S GONNA BE TO START WORKING ON THE PILOT, WORKING, TRYING TO WORK IN EVERY, EVERYTHING TO KEEP WORKING BECAUSE, UH, THE THING IS WE NEED, AS SOON I HAVE THE BLUEPRINTS, I WANT TURN IT IN THE, THE, THE, TO GET THE PERMITS BECAUSE THEY NEED TO MAKE THE ADDITION WHILE FALL DOWN TO THE BACK AND THE FRONT TO CONTINUE LEVELING EXACTLY WHERE IT GONNA BE TO FINISH IS WHY I NEEDED THE PERMITS.

UH, AS SOON THEY, THEY TOLD ME THEY GONNA BRING ME THE BLUEPRINTS BEFORE NINE, BUT THEY COULDN'T SEND ME THE, BUT I ALREADY PAID FOR THAT.

I ALREADY PAID A LOT OF THINGS ALREADY.

I INCLUDE, UH, THE, BECAUSE I KNOW I DON'T WANT BE VIOLATION OF CODE.

I KNOW I DID KEEP TRASH IN THE, IN THE

[00:40:01]

DUMPSTER.

SO IT IS WHY YESTERDAY I PUT THE DUMPSTER TO START PICK UP ALL THE TRASH.

AND I WANNA WAIT BECAUSE THE OFFICER SAY, WHY NOT MAKE NOTHING MORE UNTIL WE DESIRE, BECAUSE THAT I HAVE, I NEED TO PICK UP ANY WEALTHY TRASH AND START DOING WHATEVER IS ALREADY ON THE PERMIT.

SO WE KEEPING GOING, WORKING ON THE LEVELING, NOT THIS BECAUSE IT'S NOT WORK.

IS THAT ALL THE DOCUMENTS? UM, CAN WE GO TO THE FIRST PHOTO OF THE BEAM AND THE LAST PHOTO? THE OTHERS ARE NOTHING BUT STREET PHOTOS.

AND I WANNA, UH, YOU, YOU CAN NARRATE THIS SINCE YOU'RE THE ONLY ONE HERE.

UM, THE FIRST PHOTOS, THE ONES HE JUST GAVE YOU HIS PHOTOS, THE FIRST ONE WAS OF ONE BEAM AND A P BE THE NEXT ONE.

I'M SORRY, IT'D BE THE SECOND PHOTO THEN THERE.

THAT PHOTO RIGHT THERE.

IS THAT WHAT THEY'RE PUTTING ON YOUR HOUSE? YEAH, THAT THE THE NEW ONES.

BUT JUST IT IS JUST FOR YEAH, THAT JUST WHEN THEY STARTED, BUT THEY HAVE A A LOT ALREADY.

UH, UH, YOU CAN SPEAK TO THE MICROPHONE.

OH, SORRY, .

YEAH.

AND WE GOT A BIGGER PICTURE UP HERE IF YOU WANNA SEE THAT ONE.

YES.

UM, NOW ON THE NEW ONE, YOU CAN SEE ALL COMPLETE TOO MANY MORE, MORE AND MORE AND MORE.

THAT ONE, THAT ONE IS NOT THE FINAL.

THIS ONE RIGHT HERE, THAT'S YOUR FINAL.

NEVER IS THE FINAL BECAUSE THEY'RE GONNA, UH, JUST MARKET WHERE THE COAT DESIRE, UH, THE, THE RIGHT COAT TO START DOING WITH PILOTS.

THE, THE DIAMETER 12 INCHES CONCRETE WITH REBARS.

BECAUSE THEY TOLD ME THAT THE, UH, THE COMMERCIAL THING, SO THEY WANT COMMERCIAL.

WELL, I UNDERSTAND THAT, BUT THIS HERE IS NOT ANCHORED, CORRECT? YEAH.

IT'S JUST NO, CORRECT.

IT'S JUST A YES.

THE YES THEY WOOD.

YES, THEY WOOD.

THE BEAM STAYS CORRECT.

THE BOTTOM BEAM STAYS THE BEAM.

YEAH, THE BEAM STAYS.

BUT IS IT ANCHORED THE ANCHORED WALL TO THE JOISTS FLOOR JOISTS, THOSE PIECES THAT ARE ON TOP OF FLOOR JOISTS? YEAH.

THAT, THAT GONNA BE, IF YOU SEE IT GONNA BE REFOR, REINFORCE IT, BUT IS NOT COMPLETE.

ALL YOU SEE ON THE BACK, THE OFFICE GONNA BE GONNA BE, UH, UH, REINFORCER WITH NEW WOOD TO COMPLETE THE LEVELING, BUT IT'S NOT COMPLETE RIGHT NOW.

BUT WHAT I'M ASKING IS, IS WHAT YOU HAVE RIGHT HERE IS A BEAM, WHICH IS REQUIRED UHHUH.

, OKAY.

YES.

AND THOSE RAFTERS ARE STUDS RIGHT THERE.

AND THESE, UH, RIMS THAT ARE SUPPOSED TO GO ON HERE ARE SUPPOSED TO BE FASTENED TO THAT BEAM.

AND IT DOES NOT LOOK LIKE THEY'RE FASTENED TO IT.

UH, I DON'T UNDERSTAND EXACTLY.

UH, WHAT DO WE DO? WE HAVE THE POINTER.

WELL, YOU'RE SAYING THIS IS THE ONLY THING THAT THEY HAVE TO DO NOW IS PUT IN CONCRETE? NO, NO, NO, JUST, JUST TO, UH, JUST TO START.

THEY PUT WOOD OR CONCRETE, WHATEVER THEY FIND IT JUST TO STABILIZE COMPLETE AND START LEVELING.

AND I UNDERSTAND THAT I'M A GENERAL CONTRACTOR.

OH, OKAY.

THAT'S WHY I'M ASKING THIS.

YES.

BECAUSE WHAT YOU'RE EXPLAINING TO US IS RIGHT, RIGHT HERE IS THE MAIN BEAM THAT STAYS.

YES.

THAT'S GOOD.

RIGHT? RIGHT.

AND THEN DOWN HERE, THEY'RE GONNA POUR CONCRETE.

UH, RIGHT NOW IT IS NOT MAJOR.

NOT RIGHT NOW.

THAT'S WHAT THEY'RE SUPPOSED TO DO, CORRECT? CORRECT.

CORRECT.

OKAY.

CORRECT.

THESE RIGHT HERE ARE SUPPOSED TO BE ANCHORED.

OH YEAH.

YEAH.

GONNA BE ANCHORED TO THE CONCRETE, NOT TO THAT, THAT BOARD.

YEAH.

THEY HAVE TO BE ANCHORED TO THIS BOARD.

YEAH, THEY'RE GONNA BE ANCHORED.

BUT WHEN THEY, IT IS NOT FINISH LEVELING, THEY'RE GONNA RAISE IT UP MORE AND MORE AND MORE.

WELL, WHAT I'M SAYING IS, IS IT'S NOT ANCHORED RIGHT NOW.

NO.

SO HOW ARE THEY LEVELING? IF IT'S NOT ANCHORED? THEY YES.

NO, NOT GONNA LEVELING UNTIL RAISE IT UP.

BECAUSE THE HOUSES STILL HAVE, UH, AN ANGLE THAT WHEN THEY MARKET TO PUT THE CONCRETE, AND THEY'RE GONNA BE ANCHORED ALL COMPLETE ON THE, ON THE BOARD, ON THE SKATEBOARD.

THE OTHER PHOTO OF THE SINGLE BEAM DOWN.

WHERE'S IT SUPPOSED TO GO? YOU HAD THE, THE FIRST PHOTO RIGHT THERE.

WHERE IS THAT BEAM SUPPOSED TO GO? OH, I UNDERSTAND WHAT YOU'RE TALKING.

THAT, UH, CONCRETE ON THE BOTTOM IS NOT THE, THE, THE CONCRETE FOR THE HOUSE THAT THEY MAKE A, LIKE A, SOME PIECE OF

[00:45:01]

CONCRETE INSIDE LONG TIME AGO.

THEY USE IT LIKE A PUT JUST THAT THIS RIGHT HERE.

THAT RIGHT HERE? YES.

THAT ONE IS NOT ANCHORED.

NO, IT IS NOT ANCHORED BECAUSE JUST, JUST USE IT TO NO FALL DOWN BECAUSE IT IS NOT YET READY.

JUST USE IT TO THE, UH, I DON'T KNOW IF I CAN, I HAVE ANOTHER PHOTOS TO PUT WHERE THEY USE IT.

A LOT OF TWO BY FOURS.

TWO BY UH, FOUR BY, UH, SIX BY SIX TO JUST PUT IT LIKE A CONCRETE JUST TO, TO STACK MORE, UH, TO THE, TO THE BEAM TO START LEVELING.

BECAUSE IT IS VERY HEAVY.

THE HOUSE, BECAUSE HAVE A, A WOOD INSIDE AND WOOD OUTSIDE ALL COMPLETELY.

IT IS VERY OLD.

IT'S 11 FEET HIGH.

SO IT IS WHAT I TRIED TO SAVE IT.

THE OTHER PICTURE BEFORE THIS ONE HERE SHOWED A BUNCH OF, UH, UHHUH TEMPORARY.

YES.

UH, WHAT YOU'RE TALKING ABOUT.

YES.

NOTHING IS ANCHORED.

RIGHT.

AND IT'S SUPPOSED TO BE ANCHORED.

SO WHEN DID THEY GO IN AND PUT THE CONCRETE PIERS IN? WHEN WHEN THEY HAVE, THEY HAVE A ALMOST TO FINISH THE, THE PART, THE THE CRITICAL PART ON THE, ON THE, UH, FALL DOWN THE HOUSE IS WHY THEY NO FINISH, BUT IT IS STILL WORKING ON THAT WHEN HE FINISH AND THEN GONNA, UH, PUT THE CONCRETE AND ANCHOR AND EVERYTHING BECAUSE THEY GONNA MEASURE IT, UH, TO SEE WHERE IT GONNA BE.

THE PILOT, THE CONCRETE TO START ADVANCE THE, THE, THE WORK WITH THE REBARS AND EVERYTHING TO ANCHOR TO THE, THAT BEAM.

BUT IT'S NOT YET.

SO THEY HAVEN'T STARTED ANY OTHER THAN WHAT YOU HAVE RIGHT HERE ON YOUR FOUNDATION? YES.

UH, UH, WE BRING MORE PHOTOS ON THE FRONT.

THEY GOT MORE BEAMS ALREADY ALL AROUND.

WELL SEE HERE, THESE PHOTOS DON'T DO US NO GOOD FOR FOUNDATION.

'CAUSE THEY'RE NOT SHOWING ANYTHING TO DO WITH FOUNDATION.

NO, THAT'S IS ALL PHOTOS.

RIGHT.

BUT THIS IS ONE OF THE ONES YOU PUT IN THERE AND THERE'S ONLY TWO PHOTOS THAT SHOW YOU FOUNDATION, WHICH IS THE TWO BEAM ONES.

SO THE ONLY THING YOU HAVE IS THEY ONLY PUT IN A BEAM AND THEY HAVEN'T EVEN STARTED ACTUALLY LEVELING IT YET.

ALL THE, THIS ONE HERE.

AND THEN THE NEXT ONE ONLY SHOW THIS ONE IS, IS WHAT WE'RE LOOKING, THAT'S WHAT WE NEED RIGHT HERE.

BUT YOU'RE NOT SHOWING US WHERE THE CONCRETE I, I HAVE, I HAVE, UH, PHOTOS SENT.

THEN WE NEED TO SEE THOSE PHOTOS SO WE CAN GET, IF THIS IS ALL THEY'VE DONE, THEN WE'RE NOT GRASPING.

WHAT THEY'RE DOING HERE IS IT LOOKS LIKE THEY'RE JUST PUTTING A BUNCH OF WOOD ON, ON GRADE, WHICH IS NOT IN CODE.

SO IF YOU HAVE A PHOTO OF THEM AT LEAST STARTING TO POUR THE CONCRETE OR HAVE ONE OF THEM DONE, THEN WE CAN SEE OR GRASP A LITTLE MORE OF WHAT YOU'RE TALKING ABOUT.

'CAUSE WE DON'T SEE THAT.

I BELIEVE THE, THE OWNER HAS ALREADY RESPONDED THAT THEY HAVE NOT STARTED THE CONCRETE YET AND THAT THEY ARE WORKING ON IT.

IT IS NOT COMPLETE, IT'S NOT DONE.

UM, LET'S MOVE ON TO A NEW QUESTION IF YOU HAVE ANY OTHERS.

NO, NO, NO, NO.

GO OVER THERE.

BUT HE WAS SAYING HE DOES HAVE SOME WITH PHOTO, WITH CONCRETE.

I AM SORRY.

AND, AND NOW IT'S OVER THE STEP, OVER THE CONCRETE STEPS.

SO THEY HAVE RAISED IT UP A LITTLE BIT MORE ALREADY, BUT I, I DON'T TAKE MORE PICTURES RIGHT NOW, BUT IT'S ALMOST WITH ALL AROUND.

BUT IT IS NOT READY FOR THE CONCRETE TO ANCHOR YET.

YEAH.

THAT PICTURE DOESN'T SHOW ANY CONCRETE 'CAUSE THEY HAVEN'T POURED IT YET.

ALRIGHT.

OKAY.

UH, IS THERE ANY OTHER QUESTIONS? DID YOU BRING PROOF OF FINANCIAL MEANS? YES.

I BRING SOME.

CAN WE SEE IT? UH, DO YOU WANT OF THE, YOU HAVE THIS SCREENSHOT CHAIR? UH, YES.

ONE OF THE DOCUMENTS, MR. GU, I THAT FROM THE BANK FOR ONE OF THE DOCUMENTS, MR. GUDO, UH, PROVIDED, UH, CORRECT WAS A TAX RETURN, UH, THAT CANNOT BE MADE PUBLIC, UH, NOR SHARED WITH THE BOARD.

THAT IS, UH, UM, UH, THEY TALKED TO THE BANK AND THEY, THEY GIMME, UM, I TURN IN THE APPLICATION FOR GIMME EQUITY LOANS AND PERSONAL LOANS.

SO THEY SAY YESTERDAY,

[00:50:01]

UH, TWO, TWO DAYS OR THREE DAYS AGO, I WAS THERE AND HE SAY, UH, ALMOST THE PART OF THE, UH, PERSONAL LOAN I CAN GIVE YOU RIGHT AWAY.

BUT THE OTHER ONE, UH, TAKE TIME TO GET THE, UH, THE EQUITY LOAN FOR THE HOUSE.

I MEAN, YEAH, EQUITY LOAN FOR MY HOUSE.

AND I DON'T HAVE ON OTHER DEBT, SO I'M RETIRED, BUT I, UH, MY WIFE IS WORKING.

SO, UM, AND I HAVE TWO SON.

THEY CAN HELP ME JUST IN CASE IF I NEED IT, BUT I DON'T WANT TO DISTURB HIM BECAUSE THEY WORKING TOO HARD AND HAVE ALL, EVERYBODY HAS HOME PROBLEMS. BUT, UH, THEY CAN HELP ME JUST IN CASE I HAVE A, A PROPERTY.

I HAVE THE PROPERTY TITLE HERE IN ROMA, TEXAS WHERE I GONNA, UH, SELL IT TO KEEP WORKING ON HERE, IN HERE.

AND BECAUSE I DON'T NEED IT OVER THERE IN ROMA, TEXAS, THAT, AND IT IS, IT IS, THE VALUE OF THE PROPERTY GOING UP WAS VERY GOOD FOR ME IN THAT MOMENT BECAUSE IT'S VERY CENTER OF DRAMA TEXAS, CLOSE TO THE BORDER, CLOSE TO THE SHOPPING CENTER.

SO NOW I HAVE A GOOD VALUE ON THE, THAT PROPERTY TO SELL IT.

AND I HAVE A CREDIT AND MY CREDIT CARDS ON THE BANK.

UH, YOU HAVE TWO CREDITS CARDS.

OKAY.

ANY OTHER QUESTIONS? UH, MADAM CHAIR? YES.

UH, MR. HUARDO, UH, DO YOU HAVE AN ESTIMATE FOR THE TOTAL COST TO, UH, REPAIR THIS PROPERTY SUFFICIENT TO MEET, MEET BUILDING CODE REQUIREMENTS? UH, NOT EXACTLY.

NOT EXACTLY, BUT I GONNA, UH, AS SOON AS POSSIBLE IS I WORKING ON IT BECAUSE, UH, FOR THE MOMENT I TRY TO COVER WHATEVER NEEDS IN THIS MOMENT, LIKE, LIKE A PRIORITY TO COVER THE, THE MORE DAMAGE ON THE PROPERTY, LIKE AT THE ROOF AND UH, AND WHATEVER IS NEEDED TO NOT VIOLATE MORE VIOLATION OF CODES, LIKE A SIDING TO COVER ALL THE HOLES AND THE WINDOWS ARE GONNA WORK LATER ON THAT.

BUT I ALREADY COVER ON THE HOUSE FOR, UH, UH, WOOD, SO NOBODY GO INSIDE.

SO EVEN NO RISK FOR NOTHING, NOBODY, BECAUSE NO, NO, NO ELECTRICITY, NO WATER.

AND I'M NOT GONNA PUT GAS ON THAT.

YES, ELECTRICITY AND UH, AND, AND WATER WHENEVER IT'S READY.

SO, UH, THE, THE STORE NOT GONNA BE NO MORE STORE FOR THE MOMENT, JUST STORAGE.

SO I'M GONNA NEED JUST THE ROOF.

I'M NOT GONNA WORK INSIDE TO LIKE PUT ELECTRICITY, OTHER THINGS FOR THE MOMENT, JUST THE STORAGE BECAUSE OF WHAT I NEED JUST TO PROTECT FOR MATERIALS, WHAT I NEED TO KEEP GOING, WORKING ON THE HOUSE BECAUSE I DON'T HAVE ANY OTHER PLACE TO PUT IT.

SAME ON THE BACK YARD, LIKE A ROOF.

I NEEDED SOMETHING TO PUT ROOF COMPLETELY TO, WE CAN WORK IN JUST IN CASE RAIN OR PROTECTION OF THE WOOD.

AND DO, DO YOU HAVE AN ESTIMATE OF HOW LONG IT WOULD TAKE TO GET THIS BUILDING, UH, IN COMPLIANCE WITH THE BUILDING CODE? IF, UH, AT THE, TO THE POINT WHERE I GONNA NEED TO PROTECTION OF THE ROOF? YES, MORE OR LESS.

BUT ONE MORE OR TWO MONTHS MORE IS, IS WHAT THE VALUE OF THE FOUNDATION SAY WE FINISH AND, AND, AND WE NEEDED TAKE SOME MONTHS TO SEE IF NO GOING DOWN TO STABILIZE AND THEN CHECK IT FOR THE DELIVERY FINAL LEVEL.

BUT THE, BUT WE CAN KEEP WORKING ON THE ROOF, ON THE, UH, STORAGE OR STORE BECAUSE THAT ONE IS, UH, FOR THE MOMENT I GONNA STABILIZE AFTER I PUT THE ROOF BECAUSE IT'S NOT GONNA BE LEVELING.

IT'S GONNA BE STABILIZE.

SO THEY'RE GONNA ESCAPE, PUT EVERYTHING NEED FOR STABILIZE FOR THE, UH, BLOCKS, NO CRACK NO MORE, AND GOING TO STAY IN THE SAME PLACE.

AND IT'S NOT GONNA MOVE FOR THAT IS WHAT HE EXPLAIN ME.

BECAUSE YOU'RE GONNA BE VERY, UH, PIPES ON THE GROUND LONG WAY DOWN TO NO MOVE IT BECAUSE EVERYTHING OF THAT HOUSE IS MOVING, WAS MOVING BECAUSE ALL THE WATER GOING TO THE BELOW THE HOUSE IS WILL FALL DOWN.

SO, UH, WHEN DO YOU THINK THE FOUNDATION COM, UH, REPAIR WOULD BE COMPLETE? I ASSUME BEFORE THE PERMITS EXPIRE BECAUSE IT IS WHAT HE WORRY ABOUT

[00:55:01]

THAT IT, WHAT HE TOLD ME BECAUSE HE GOT MORE WORK.

SO SOMETIMES COMING TO WORK, SOMETIMES NOT BECAUSE AT A LOT OF WORKS, BUT WHEN HE COME, HE START MAKE PROGRESS ON THE, ON THE HOUSE.

SO I SAY WE OKAY BECAUSE WE GOING TO SEE PRO UH, PROGRESS ON THE LEVELING BECAUSE I TAKE A PICTURE, I DON'T KNOW, I DON'T UNDERSTAND THERE, BUT I TOOK A PICTURE FROM THE BOTTOM, THE HOUSE TO SEE WHAT ELSE MORE THEY WORKING ON.

AND IT IS STILL WORKING.

I MEAN, THEY HAVE A LOT OF THINGS ALREADY, UH, TO RAISE IT UP LITTLE BY LITTLE BECAUSE THEY KNOW THEY, THEY CAN'T, NO, NOBODY CAN LIFT JUST ONE SIDE OF THE HOUSE.

I THINK FOR ENGINEERING, IT NEED TO BE LITTLE BY LITTLE ALL COMPLETE TOGETHER TO GET STABILIZE.

SO IT IS WHY I TAKE MORE TIME.

SO I I DIDN'T HEAR A DATE.

WHEN DO YOU THINK THIS'LL BE DONE? I NO CHECK THE PERMITS, BUT I THINK, I ASSUME IT'S IN TWO OR THREE MONTHS.

AND SO FAR THE ONLY PERMIT YOU HAVE IS FOR THE FOUNDATION, RIGHT? FOR THE MOMENT, YES, BECAUSE I NEED TO TURN IN THE, THE, TO KEEP GOING WORKING.

I NEED TO TURN IN THE, THE BLUEPRINTS IS WHAT THEY TOLD ME IS THE ENGINEER IS, IS WORKING ON THAT.

AND I WANNA, UH, CHECK FOR THE PERMITS FOR THE ROOF TO START REMOVE IT BECAUSE THEY NO WANT IT TO REMOVE ANY, TO REPAIR THE ROOF IS WHAT I TAKE.

I HAVE THE DUMPSTER BECAUSE AS SOON AS POSSIBLE I WANNA HAVE GET THE PERMITS FOR REMOVE THE ROOF TO START WORKING BECAUSE IT IS WHAT I NEED FOR PRIORITY BECAUSE I DON'T WANT MORE DAMAGE AND AND RAIN IF RAIN.

RIGHT.

ANY OTHER QUESTIONS? UH, YES.

UH, WHAT IS YOUR INTENTION WITH REGARD TO THE TWO ACCESSORY BUILDINGS? WHAT TO ACCESS? OH, DO YOU INTEND TO REPAIR THOSE? OH YEAH.

DO YOU INTEND TO DEMOLISH THOSE FIRST ON THE FRONT? WHAT UH, THE CONSTRUCTION, NEW CONSTRUCTION GONNA BE? THE FRONT GONNA BE LOOKS LIKE, UH, TOGETHER WHEN WE KNOW ON THE, ON THE BACK, THE HOUSE ARE GONNA TRY TO PUT IT TOGETHER TO NOT GET WATER INSIDE IN BETWEEN THAT GONNA STAY LIKE THAT.

AND WE GONNA, I, I ALREADY TRIED TO EXPLAIN AND TALK TO THE, UM, FOUNDATION MAN TO HOLD WHENEVER IT IS READY, HOLD THE HOUSE.

LIKE HE SAY, ANCHOR TO THE CONCRETE OF THE PILES OF THE HOUSE THAT MOVE THAT NEVER GONNA MOVE IT AWAY AGAIN.

CAN WE, CAN WE PULL UP THE PICTURES FROM THE TWO ACCESSORIES PLEASE? BECAUSE WE GONNA STAND THE BEAMS TO THE HOUSE TO GET FLOOR COMPLETE LIKE A HOUSE AGAIN TOGETHER BECAUSE NOT GONNA MOVE NO MORE AND WE CAN NEED TO GET THE WATER OUT OF THE CENTER.

I'M SORRY, HE'S TALKING ABOUT .

OH, THAT'S WHAT HE'S TALKING ABOUT ALL THESE? YEAH.

WHAT WERE YOU GONNA DO WITH THIS? YEAH, YEAH.

THAT, THAT OLD TRASH, UH, I, FROM THE FIRST TIME I TOLD HIM, TRY TO TRY TO SE TO SAVE THE WOOD BECAUSE THAT, THAT SIDING IS THE OLD KIND OF SIDING FOR OLD HOUSES.

IT'S SPECIAL.

IT'S NOT THE SAME SITE.

SO I, I KEEP IT BECAUSE I WANNA REPAIR SAME WHAT WE HAVE IN THE SITE.

WHATEVER IS GOOD FOR, TO REPAIR BECAUSE YOU CAN FIND IT AGAIN, THE SAME SIZE OF SIDING.

SO I HAVE THAT SIDING AND I DON'T WANT TO, I TELL HIM THE GOOD SIDING WHEN YOU REMOVE IT, WHATEVER IS PIECE LITTLE ONE OR NO LITTLE ONE, WE GONNA SAVE IT BECAUSE WE DON'T FIND IT NO MORE TO REPAIR THE SAME SIDING INSIDE THE HOUSE.

AND EVEN IF YOU NEED A MOUSE MORE, BECAUSE I WORKING IN CONSTRUCTION WITH THE BUILDER AND ENGINEER BEFORE, UH, WE WORK IN ALL HOUSES AND, AND WHEN THEY THROW AWAY A LOT OF UH, THAT KIND WOOD SIDING, I REMOVE IT AND I TELL THEM, CAN I HAVE IT SAY, YEAH.

AND I, AND I TOOK IT AND SAVE IT IN, IN MY PROPERTY ANOTHER PLACE.

SO JUST IN CASE NEEDED WOOD, SPECIAL FOR REPAIR SIDING, OLD ONE.

SO THE, THE MATERIALS THAT WERE IN THE PICTURE, THAT'S PART OF THE DECONSTRUCTED WOOD THAT YOU WANT TO PRESERVE, BUT THE ACTUAL STRUCTURE IS WHAT WE'RE TALKING ABOUT THIS? YEAH, THIS IS TRUCK.

I, I, I ALREADY TALKED TO ONE OF MY FRIENDS, UH, GIMME AN IDEA BETTER TO MAKE A, UH, NO WOOD, I MEAN STEEL TO, TO BETTER MAKE BETTER AND UH, MAKE LIKE A PORCH WITH, UH, METAL JUST FOR THE PORCH AND SAME THING.

AND NEW, NEW, NEW, NEW METAL.

NO OLD ONE, LIKE ON THE BACK.

SAME THING ON THE BACK.

SO IS IT YOUR INTENTION TO

[01:00:01]

DEMOLISH THIS AND REBUILD NEW IF THE, IF THE CITY GIMME PERMISSION? I DON'T WANNA TOUCH IT BECAUSE I DON'T WANT MORE VIOLATION OF THE CODE IS WHAT I JUST, WHAT I DID IS JUST UH, UH, PUT IT STRAIGHT BECAUSE WAS LIKE A FALL DOWN, BUT I MAKE IT STRAIGHT AND NOW IT'S STRAIGHT.

OKAY.

THE PIPES.

DID THAT ANSWER YOUR QUESTION? OKAY.

OKAY.

ANY OTHER QUESTIONS? ALRIGHT, SAME THING.

I HAVE A QUESTION.

YES.

UH, I HAVE IN THE FRONT BIG TREE, UH, CAUSED TOO MUCH DAMAGE.

DAMAGE UP TO THE, TO THE ROOF.

THAT WOULD BE A QUESTION FOR YOUR CODE OFFICER.

OKAY.

I NEED TO KNOW IF I CAN CUT WHATEVER GOING TO THE, TO THAT.

OKAY.

THAT, THAT WOULD BE A QUESTION YOU WOULD ASK YOUR CODE OFFICER.

OH, OKAY.

I DIDN'T KNOW .

OKAY, NO PROBLEM.

IF I HAVE A PERMISS FOR THAT, YES.

TO CODE WHATEVER IS GOING TO THE HOUSE.

OKAY.

YEAH, THAT WOULD BE A QUESTION FOR YOUR CODE OFFICER.

OKAY.

YOU MAY HAVE A SEAT.

UM, CHERYL D OR T I'M SORRY? YEAH, DICE.

DICE.

OKAY.

ARE ARE YOU GOING TO SPEAK YES FOR JUST A MINUTE? OKAY.

YEAH, YOU CAN HAVE A SEAT.

THANK YOU.

THANK YOU.

GOOD MORNING.

GOOD MORNING.

I'M CHERYL TIES.

I LIVE AT 500 CORONA AVENUE, ZIP 7 8 2 0 9.

UH, I HAVE KNOWN MR. WADO FOR OVER 20 YEARS.

MY LATE HUSBAND AND I USED HIM FREQUENTLY AS OUR HANDYMAN AND ALSO MY MOTHER AND HER FAMILY.

UM, AS I'M LISTENING TO EVERYTHING AND, AND WHAT OFFICER SANTANA SPOKE ABOUT, UM, THERE'S A HUGE AMOUNT OF CONFUSION, UM, AS FAR AS THE PERMITS AND WHAT HAVE YOU, UNFORTUNATELY, UM, JOSE HIRED THE WORLD FOUNDATION REPAIR PEOPLE, UH, IN OCTOBER OF 2025.

UM, AND SINCE THE TIME THAT HE HAS HIRED THEM, UH, I FEEL LIKE ONCE I STARTED HEARING HIS SIDE OF THE STORY AND WHAT THE PROBLEMS HE WAS HAVING, I FEEL LIKE THEY WERE TELLING HIM YES, THEIR PART OF THE CONTRACT WAS THAT THEY WOULD GET THE PERMITS FOR HIM THAT WERE NEEDED AND THEN THEY WOULD TELL HIM, WELL, NO, WE CAN'T START BECAUSE THE CITY'S TELLING US WE NEED RESIDENTIAL PERMITS AND THEN NO, WE CAN'T START.

'CAUSE THEY'VE DECIDED NO, THAT IT'S COMMERCIAL AND BACK AND FORTH.

I FELT AS THOUGH THE COMPANY WAS POSSIBLY JUST TRYING TO STALL BECAUSE THEY HAD ALREADY GOTTEN A HUGE DEPOSIT FROM HIM.

AND, UM, THAT DEFINITELY WAS A, A HUGE PROBLEM.

SO WHEN THEY FINALLY WOULD START, THEY WOULD DO A LITTLE BIT AND THEN THEY WOULDN'T SHOW UP FOR LIKE A WEEK OR SO.

UH, HE WAS TOLD THAT HE FINALLY, THEY HAD THE PERMIT AND THEY STARTED IN EARNEST ON, UH, DECEMBER 10TH, 2025.

AND ALMOST IMMEDIATELY THE CODE ENFORCEMENT PUT UP A STOP WORK ORDER ON THE BUILDING.

AND THAT WAS WHEN JOSE REALLY STARTED TELLING ME WHAT WAS GOING ON.

HE SAID HE HAD TO APPEAR AT MUNICIPAL COURT ON JANUARY 13TH.

SO WE LOST AN ENTIRE MONTH.

NOTHING COULD BE DONE AT THE HOUSE.

AND WHEN WE GOT THERE, UH, THE FINE WAS $300.

THEY WERE WILLING TO REDUCE IT TO 75 IF HE DIDN'T GO IN FRONT OF A JUDGE.

SO HE WENT AHEAD AND TOOK THAT BECAUSE WE ASKED IF WE CAME BACK IN FRONT OF A JUDGE.

THEY DIDN'T KNOW WHEN THEY COULD SCHEDULE THAT AGAIN.

SO HE JUST LOST THE MONTH THERE.

UM, HE GOT ANOTHER PERMIT, AND I DO HAVE THAT ON FEBRUARY 24TH TO WORK ON A CLOSET IN THE HOUSE AFTER, UM, AFTER THEY GOT IT LEVELED.

BUT THEN ALL OF A SUDDEN WE GOT THE NOTICE TO APPEAR IN FRONT OF THE BOARD THAT THEY WERE OPTING TO DEMOLISH, UH, THE PROPERTY.

SO I'M, I'M SO CONFUSED ABOUT, WELL, WHY HAS HE BEEN ISSUED THESE PERMITS? IF THE PLAN WAS THAT THE AREA NEEDED TO BE DEMOLISHED? UM, BECAUSE UP TO DATE, JOSE HAS PAID, UH, FOR PERMITS.

HE'S PAID A TREMENDOUS AMOUNT OF, UH, UH, DOWN PAYMENT TO THE FOUNDATION REPAIR.

HE'S, UH, PAID ENGINEERING FEES.

UH, HE'S BOUGHT LUMBER.

HE RENTED THE ROLL OFF DUMPSTER TO GET RID OF Y'ALL.

SAW THE PICTURES OF ALL THE STUFF IN THE AREA.

UM, BLUEPRINTS ARE COMING.

UM, WHICH YOU SAW TODAY WAS JUST, I THINK A THUMBNAIL, UH, FROM THE ENGINEERS.

HE'S PAID CODE VIOLATION FEES, UM, AND HE'S ALSO HIRED AND PAID A CARPENTER.

YOUR, YOUR THREE MINUTES HAS EXPIRED.

OH, OKAY.

I THOUGHT I COULD, THAT WAS THE BEEPING.

I THOUGHT I COULD SPEAK

[01:05:01]

ON HIS BEHALF.

UM, FOR OVER THREE, NO, ONLY AN O OWNER GETS UNLIMITED TIME.

OKAY.

AND THE SPEAKERS GET THREE MINUTES.

OKAY.

IF YOU WOULD LIKE TO SUBMIT THAT, YOU CAN SUBMIT, UM, THE FULL COMMENT TOO.

OKAY.

ALRIGHT.

THAT SOUNDS GREAT.

I APPRECIATE YOUR HELP.

THANK YOU.

UM, I HAVE A FEW QUESTIONS.

OFFICER SANTANA, A DANGEROUS PREMISE OFFICER.

UM, SO WHEN YOU WERE SPEAKING EARLIER, YOU SAID HE WAS FOUND GUILTY OF, WAS, THAT WAS A PLEA DEAL, NOT A, A JUDGE SAYING YOU ARE GUILTY? UH, CORRECT.

UM, WHEN WE WENT, UH, TO COURT, UM, HE HAD GONE, LIKE I SAID, AFTER I ISSUED THE CITATION, SOMEBODY WENT AND GOT THE FOUNDATION PERMIT AFTER THE CITATION WAS ISSUED.

SO THE FACT THAT HE DID ACTUALLY OBTAIN THE PERMIT, WE WERE WILLING TO REDUCE THE FINE TO $75.

OKAY.

AND YOU, YOU SAID THAT THE PERMIT WAS PULLED 20 MINUTES AFTER THE CITATION, CORRECT? I ISSUED THE CITATION.

HE PULLED THE PERMIT.

IT EITHER IT WAS HIM OR THE FOUNDATION COMPANY.

I DON'T KNOW WHO PAID FOR IT, BUT IT WAS TIMESTAMPED 20 MINUTES AFTER.

SO A ACCORDING TO THE, THE, THE OTHER INFORMATION GIVEN TO US, THE, UM, THE OWNER MAY HAVE NOT KNOWN THAT THEY DIDN'T HAVE THE PERMIT ALREADY.

IT WOULD IF IT WAS THE, THAT'S WHY I WANT TO KNOW WHO PULLED THE PERMIT.

IF, IF IT WAS THE COMPANY, THE COMPANY DEFRAUDED HIM.

AND IT'S NOT NECESSARILY HIS FAULT.

I HAVE NO IDEA OF KNOWING THAT.

OKAY.

AND IT'S NOT PART OF THE APPLICATION PROCESS THAT THE PERSON THAT FILES AND PULLS THE PERMIT IS NOT REQUIRED TO SHOW IDENTIFICATION OR ANYTHING? I'M SURE THAT SOMETHING, UM, YOU KNOW, HE SIGNED THE APPLICATION.

MR. WAR HARDO SIGNED THE APPLICATION.

I DID SEE THAT.

OKAY.

ALL RIGHT.

AS FAR AS WHO PAID FOR IT, I DON'T KNOW.

UM, OKAY.

YEAH, THAT, THAT, THAT WAS MY QUESTIONS.

THANK YOU MADAM CHAIR.

I'D LIKE TO YEAH, GO AHEAD.

ASK CODE SOME.

THE ZONING OF THIS IS 99, CORRECT? Z NINE NINE? UM, LEMME SEE.

I THINK THAT'S WHAT'S ON THE PAPERWORK.

I THOUGHT IT WAS A C TWO ZONING.

IT MIGHT.

I SAW Z NINE NINE.

I'M NOT, IT SAID INFORMATION Z NINE NINE.

BUT CAN YOU EXPLAIN, CAN YOU PUT UP A PICTURE OR I'M SORRY, UH, JPEG, UM, 94, THAT RIGHT THERE DIVIDES THE, THE BUILDINGS CORRECT TO THE FRONT ELEVATION.

UH, IT'S SEPARATED.

UM, IF YOU LOOK THROUGH THE CRACK TO THE BACK, IT'S STILL CONNECTED.

SO THIS WHOLE THING, AND THE REASON I ASK IS WHAT IS THE ZONING OF THIS IS BECAUSE APPARENTLY THERE SEEMS TO BE A ZONING ISSUE.

'CAUSE SOME SAY IT'S RESIDENTIAL AND SOME SAY IT'S COMMERCIAL.

WE HAVE IT BOARD MEMBERS.

THIS IS JENNY RAMIREZ.

WE HAVE IT LISTED AS C TWO.

THE PROPERTY IS LISTED AS C TWO.

SO THAT WOULD BE COMMERCIAL.

THE ENTIRE PROPERTY, INCLUDING THE RESIDENCE, THE HOUSE, WELL, THE USAGE OF THE HOUSE WAS RESIDENTIAL.

THE OTHER SIDE OF THE PROPERTY, I BELIEVE IT'S ONE TIME WAS USED FOR COMMERCIAL USE.

SO HE HAS A COMBINATION ON BOTH ENDS OF IT.

OKAY.

SO THAT COULD BE THE CONFUSION THAT THEY'RE TELLING HIM IS YEAH, THEY'RE LOOKING AT THE HOUSE AND TELLING.

'CAUSE UH, MY UNDERSTANDING IS THE SLAB IS CONCRETE.

THE COMMERCIAL SIDE, THE BRICKS, THE ADDITION WAS THE SLAB ON GRID.

AND THEY'RE SAYING THE HOUSE PEER AND BEAM NEEDS TO BE DONE COMMERCIAL.

BECAUSE I THINK, I DON'T KNOW IF IT'S BECAUSE IT'S ALL CONNECTED.

I, I WOULDN'T BE ABLE TO SPECULATE ON THAT.

HERE WE GO.

SO THEN THAT WOULD, WELL YOU CAN'T HAVE IT BOTH WAYS.

IF IT'S ZONED AS C TWO, IT WOULD HAVE TO GO UNDER THE COMMER, UH, UNDER RESIDENTIAL ZONING, CORRECT.

FOR THE HOUSE PART BOARD.

I DON'T HAVE AN ANSWER FOR YOU ON THAT END.

IF HE'S BRINGING IT UP TO CODE, THAT WOULD BE DEPENDENT ON, ON WHAT HIS, UM, REQUIREMENTS ARE, WHAT HE'S TRYING TO DO.

IF HE'S GONNA BRING IT UP TO LIVING AS A LIVING OR RESIDENTIAL STRUCTURE, OR IF THE ENTIRE PROPERTY IS GONNA BE UTILIZED FOR COMMERCIAL ACTIVITY.

I'M NOT SURE WHAT HE APPLIED FOR OR WHAT HE IS LOOKING TO DO WITH THE PROPERTY ON THE STIPULATION OF THOSE, UM,

[01:10:01]

REPAIRS.

WELL, MY UNDERSTANDING IS WHEN HE WENT TO GET THE PERMITS AND STUFF, THEY'RE TELLING HIM THAT IT HAS TO BE COMMERCIAL, BUT IT'S ZONED RESIDENTIAL.

THAT WOULD'VE BEEN FOR HIM TO HAVE CLARIFIED WITH, UH, AT THE PERMIT COUNTER.

WE WOULDN'T HAVE HAD A, A CLARIFICATION POINT ON THAT.

WE, WE WOULDN'T HAVE WALKED WITH HIM TO APPLY FOR THAT PERMIT OR CLARIFIED THAT FORM.

HE WOULD NEED TO STIPULATE THAT WITH THE, WITH THE PERMIT COUNTER.

SO I GUESS IT ALL GO BACK TO THE SAME FACT THAT IF IT CONNECTS IT, THEN IT, THEN IT'D HAVE TO APPLY FOR REZONING.

IT IS CONNECTED.

IT IS.

THE PROPERTY IS CONSIDERED ONE, ONE PROPERTY AT THIS TIME.

'CAUSE IT IS STILL CONNECTED.

SO THEN HE'D HAVE TO GO THROUGH A REZONING THEN IF THEY'RE SAYING IT'S COMMERCIAL, WHICH MEANS HE'D HAVE TO GO THROUGH THE PAPERWORK FOR REZONE TO GET IT FROM RESIDENTIAL TO COMMERCIAL.

ACTUALLY THE OPPOSITE.

IF HE WANTED TO DOWN ZONE, THAT MAY BE A POSSIBILITY.

THAT WOULD BE, UM, SOMETHING FOR THE OWNER TO TAKE INTO CONSIDERATION.

IT, IT'S COMMERCIAL NOW.

IT'S C ONE, IT'S SEVEN.

WELL IT'S C TWO NOW IS WHAT THE THING SAYS.

WHICH MEANS IT'S RESIDENTIAL.

IT'S C ONE.

NO, C ONE.

NO, THE PROPERTY IS ZONED C TWO.

THE USAGE FOR HALF OF THE PROPERTY PREVIOUSLY APPEARS TO HAVE BEEN RESIDENTIAL.

THE USAGE IS DIFFERENT THAN WHAT'S ZONED.

AND THAT'S WHAT I'M SAYING IS IF IT'S CONNECTED, SOMEBODY DIDN'T CHANGE THE ZONE BECAUSE IF IT'S C ONE, IT'S COMMERCIAL.

CORRECT.

THERE'S, THERE'S NO CHANGING THE ZONE.

THAT WOULD BE, THAT WOULD REQUIRE, UM, A REQUEST FROM THE OWNER TO CHANGE OR DOWNGRADE HIS ZONING.

WELL THAT, THAT'S WHAT I'M SAYING.

THEY'RE TELLING HIM IT'S A C ONE TO GO COMMERCIAL FOR THE FOUNDATION ON P AND BEAM.

IF SO, IF IT'S A C TWO, THAT'S WHERE THEY'RE CONFUSING IT BECAUSE THEY'RE SAYING IT'S A C ONE AND HE'S SAYING IT'S A C TWO.

THAT'S WHAT THE CONFUSION IS.

AND IT'S MARKED IN THE PAPERWORK C TWO, WHICH MEANS RESIDENTIAL.

NO SIR.

C TWO MEANS COMMERCIAL, SIR.

C TWO, C ONE.

C TWO ARE COMMERCIAL.

ARE ANY OF THE R DESIGNATIONS, SIR, ARE RESIDENTIAL? IT'S THE FIRST LETTER OF, THE WORD C IS COMMERCIAL R RESIDENTIAL.

OKAY.

SO ALL THIS LOT IS A COMMERCIAL LOT.

DO WE KNOW WHEN THAT WAS ZONED? BECAUSE THIS HOUSE WAS BUILT WHAT, 1933? 33 TO 45 I THINK IS WHAT IT SAID.

55.

50 COMMERCIAL PART.

THE COMMERCIAL PORTION WAS ADDED IN 1955 I GUESS BECAUSE WHEN THEY ATTACHED IT, YOU TOOK THE WHOLE THING.

SO HE'S APPLIED FOR COMMERCIAL PERMITS AND HE STILL WANTS TO CONNECT THE OLD, THE HOUSE PART TO THE, WHICH IS WHAT'S THE PROBLEM THERE? IT'S ALREADY CONNECTED.

IT WELL, IT'S PARTIALLY BECAUSE OF YEAH, BUT THE PLANS.

BUT YEAH, THE PLANS THAT WERE PRESENTED SHOWS THAT THEY'RE GOING TO CONNECT IT COMPLETELY.

THAT RECONNECT.

YEAH, RECONNECT IT.

RIGHT.

HE'S GONNA RE REPAIR THAT.

RIGHT.

SO THE CONNECTION WILL STILL BECOME THE SAME.

CORRECT.

AND HE ALSO STATED THAT IT IS NOT HIS INTENTION TO USE THAT AS COMMERCIAL, BUT AS STORAGE TO USE THAT BUILDING.

OKAY.

'CAUSE I THINK THAT'S WHAT WAS CONFUSING.

'CAUSE THEY'RE TELL THERE'S A, A RESIDENTIAL COMMERCIAL MM-HMM.

CONFLICT HERE, WHICH IS NOT REALLY BECAUSE IT'S COMMERCIAL AND THAT'S WHY HE'S HAVING PROBLEMS PULLING THE PERMITS BECAUSE WHAT, AND WE ONLY ADDRESS THE HOUSE SIDE OF IT.

CORRECT.

WE DIDN'T ADDRESS THE CONCRETE SITE.

IN WHAT, IN WHAT ASPECT? WE'VE ONLY BEEN ADDRESSING THE FOUNDATION ON THE HOUSE SIDE.

N NO, THE ENTIRE CASE.

UH, WELL, YEAH.

THE CASE, BUT WHEN WE WERE TALKING TO THE, TO THE PROPERTY OWNER, WE'VE ONLY ADDRESSED THE FOUNDATION STUFF FOR THE HOUSE SIDE AND WE HAVEN'T TOUCHED EVEN THE CONCRETE SIDE.

HE DID STATE THAT THE CONCRETE SIDE DID NOT NEED LEVELING.

WELL, THE BRICKS DO, BUT IT NEEDED STAB, STABILIZING IS WHAT HE WAS SAYING.

IT DOES.

I PUT A LEVEL ON THE INSIDE AND IT IS, UH, AS YOU WALK IN THE FRONT DOOR OF THE CONCRETE SECTION, IT SINKS TO THE RIGHT.

OKAY.

YEAH.

OKAY.

THANK YOU.

I JUST NEED THAT CLARIFIED.

OKAY.

ANY OTHER QUESTIONS? YOU GUYS KEEP IT ON THE MIC.

ANY OTHER QUESTIONS? OKAY.

I AM OPEN TO TAKE A MOTION.

[01:15:10]

UM, MADAM CHAIR, THIS IS GEORGE GRIMES.

I HAVE A MOTION.

OKAY.

I MOVE THE PROPERTY LOCATED AT 7 25 ROPER.

I DON'T THINK YOUR MIC IS ON OR YOU NEED TO BE CLOSER.

UM, I, I, I WOULD LIKE TO MAKE A MOTION ON 7 25 ROPER STREET.

UH, WITH REGARD TO THE MAIN STRUCTURE, UH, I MOVE THAT IS A PUBLIC NUISANCE, WHICH IS FEASIBLE TO BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6, SUBSECTIONS 1, 2, 5, 7, 8, 12, 15, 17, AND 18.

I MOVE THAT THE PROPERTY BE REPAIRED WITHIN, UH, 90 DAYS OF THE INSURANCE OF THIS ORDER WITH REGARD TO THE ACCESSORY STRUCTURES MOVE THAT THE, UH, ACCESSORY NUMBER ONE AND ACCESSORY NUMBER TWO ARE PUBLIC NUISANCES, WHICH ARE NOT FEASIBLY BE REPAIRED AT THIS TIME AND ARE IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6.

UH, AS TO ACCESSORY ONE, UH, 7, 8, 12, AND 15 AS TO ACCESSORY 2, 5, 8, 12, AND 15.

AND THAT THOSE PROP, THOSE ACCESSORY BUILDINGS BE DEMOLISHED WITHIN, UH, 30 DAYS.

OKAY, LET ME REPEAT THAT.

YES.

OKAY.

SO THE MOTION IS THAT THE PROPERTY AT 7 25 RIVER STREET FOR THE MAIN IS A PUBLIC INNOCENCE, WHICH IS FEASIBLE TO REPAIRED AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6, SUBSECTIONS 1, 2, 5, 7, 8, 12, 15, 17, AND 18 AND SHOULD BE REPAIRED WITHIN 90 DAYS.

AND FOR THE ACCESSORIES, ONE AND TWO ARE NOT FEASIBLE TO BE REPAIRED AND IN IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 56 FOR ACCESSORY ONE SUBSECTIONS 7, 8, 12, AND 15, AND FOR ACCESSORY TO SUBSECTIONS 5, 8, 12, AND 15 AND SHOULD BE DEMOLISHED WITHIN 30 DAYS.

DO WE HAVE A SECOND? THIS IS YVONNE ADDISON, I SECOND.

OKAY.

ANY DISCUSSION? CAN WE DO A ROLL CALL VOTE OR, I'M SORRY.

YEAH, GO AHEAD.

KAYLA MIRANDA? YES.

JOEL SOLIS.

YES.

GEORGE GRAHAMS JR.

YES.

DR. LINDA LOPEZ.

RODRIGUEZ? NO.

YVONNE ADDISON? YES.

FRED ANDES.

NO.

MOTION PASSES WITH A VOTE OF FIVE TO TWO, I'M SORRY, FOUR TO TWO.

YOU MAY GET WITH THE CODE OFFICER TO GET YOUR INSTRUCTIONS.

OUR THANK YOU.

OUR NEXT, UH, CASE IS GONNA BE IN 1918 MCCULLOUGH AVENUE.

GOOD MORNING BOARD.

GOOD MORNING FOR THE RECORD.

MY NAME IS HASSAN AL.

I'M A DANGEROUS PREMISES OFFICER WITH CITY OF SAN ANTONIO DEVELOPMENT SERVICES DEPARTMENT.

THE STRUCTURE IS BEING PRESENTED TODAY IS LOCATED AT 1 9 1 8 MCCULLOUGH AVENUE, SAN ANTONIO, TEXAS, WITH A RECOMMENDATION FOR REPAIR IN ACCORDANCE WITH CITY CODE ARTICLE EIGHT, CHAPTER SIX.

THIS IS THE FIRST TIME THIS CASE IS BEING HEARD BEFORE THIS BOARD.

THE LEGAL DESCRIPTION IS NCB 2 9 9 9 BLOCK ONE, LOT SEVEN, LOCATED IN CITY COUNCIL

[01:20:01]

DISTRICT ONE.

THE OWNER ON RECORD IS ARD HERBERT LAWRENCE, WITH A MAILING ADDRESS OF 5 1 0 7 VILLAGE WAY, SAN ANTONIO, TEXAS 7 8 2 1 8.

ALL NOTICES OF HEARING WERE PROPERLY ISSUED AS REQUIRED.

I BELIEVE WE HAVE AN INDIVIDUAL WHO CLAIMED TO BE, UH, THE PROPERTY OWNER IS PRESENT TODAY.

UH, NO CONTACT WITH WAS MADE WITH A PROPERTY OWNER.

THE OFFICE OF HISTORIC PRESERVATION HAS CONFIRMED ON JANUARY 15TH, 2026.

THE PROPERTY IS NOT ELIGIBLE FOR HISTORIC DESIGNATION THE FOLLOWING TIME ON THE FOLLOWING TIMELINE OF EVENTS REGARDING THE NOTIFICATION PROCESS.

THE FIRST INSPECTION REGARDING 1 9 1 8 MCCULLOUGH AVENUE WAS CONDUCTED ON MARCH 11TH, 2025.

THE ORIGINAL NOTICE OF VIOLATION WAS MAILED ON MARCH 12TH, 2025, AND THE NOTICE OF VIOLATION RETURNED ON CLAIM ON APRIL 4TH, 2025.

THE CONFERENCE MEETING LETTER WAS MAILED TO THE PROPERTY OWNER ON NOVEMBER 26TH, 2025.

ON DECEMBER 19TH, 2025, CONFERENCE MEETING HELD AT DSD WITH NO ATTENDANCE OF THE, THE PROPERTY OWNER, UM, ON JANUARY 9TH, 2020.

UH, SIX.

A SECOND CONFERENCE MEETING WAS HELD AT DSD WITH NO ATTENDANCE OF THE PROPERTY OWNER ON MARCH 26TH, 2026.

THE NOTICE FOR BSB HEARING WAS POSTED AT 1 9 1 8 MCCULLOUGH AVENUE AND ON MARCH 25TH, 2026, THE NOTICE, UH, FOR THE BSB HEARING WAS MAILED TO THE PROPERTY OWNER.

NO SCOPE OF WORK OR FINANCIAL PROOF OR LETTER OF CREDIT OR ENGINEER'S REPORT HAS BEEN PROVIDED AS OF TODAY.

APRIL 9TH, 2026.

NO PERMIT ON, ON FILE AS OF TODAY, APRIL 9TH, 2026.

THIS IS THE, A CONTEXTUAL PHOTO OF THE STRUCTURE.

IT IS A, A SINGLE STORY COMMERCIAL STRUCTURE WITH A SLAP ON GRADE FOUNDATION, BRICK SIDING, AND FLAT ROOF SYSTEM.

THE NEXT PHOTO SHOWING THE FRONT LEFT ELEVATION OF THE STRUCTURE.

AS YOU CAN SEE, THERE IS, UH, DETACHING OF THE BRICK SIDING ON THE LEFT HAND SIDE WITH A GAP.

THIS IS JUST A, A CLOSER VIEW OF DETACHING SIDING.

UM, AS YOU CAN SEE, THE, THE BRICK SIDING IS KIND OF LIKE, THERE'S A, A SMALL GAP BETWEEN THE STRUCTURE AND THE BRICK, UH, SIDING.

UH, THE NEXT PHOTO SHOWING, UM, THE FRONT LEFT ELEVATION OF THE STRUCTURE.

THIS IS THE BEST, UH, ANGLE THAT I CAN GET BECAUSE THERE'S A, ANOTHER STRUCTURE RIGHT NEXT TO IT.

THE NEXT PHOTO SHOWING THE FRONT RIGHT ELEVATION OF THE STRUCTURE.

THIS IS JUST A CONTEXTUAL PHOTO.

UM, THE NEXT PHOTO SHOWING, UH, THE RIGHT REAR ELEVATION OF THE, UH, OF THE STRUCTURE.

UH, THERE ARE SOME CRACKS ON THE, ON THE SIDE.

UH, THIS IS THE BEST ANGLE THAT I CAN GET, UH, IS SHOWING THE CONTEXTUAL PHOTO OF THE BRICK SIDING.

THERE'S MULTIPLE CRACKS ON THE BRICK SIDINGS.

UH, I WAS TRYING TO ZOOM IN TO SHOW, UH, UH, THE, THE CRACKS, AS YOU CAN SEE ON THE, ON THE RIGHT ELEVATION AND ON THE REAR ELEVATION, THERE'S MULTIPLE, UH, STEPPING CRACK IN THE BRICK SIDING.

THE NEXT PHOTO IS THE CONTEXTUAL PHOTO OF THE REAR ELEVATION OF THE STRUCTURE.

AS YOU CAN SEE, THERE IS MULTIPLE CRACKS IN THE BRICK SIDING.

THE NEXT PHOTO IS THE CONTEXTUAL PHOTO OF THE REAR, REAR LEFT ELEVATION OF THE STRUCTURE.

THERE IS A CRACKS GOING ALL THE WAY, UH, FROM THE FRONT ALL THE WAY TO THE, UH, REAR ELEVATION OF THE STRUCTURE.

AS YOU CAN SEE, LIKE RIGHT BELOW A COUPLE OF FEET.

I WAS TRYING TO ZOOM IN TO SHOW THE, THE CRACK IS GOING ALL THE WAY ON THE BRICK SIDING ON THE, UH, LEFT ELEVATION OF THE STRUCTURE.

THE NEXT PHOTO SHOWING THE REAR ELEVATION OF THE STRUCTURE.

AS YOU CAN SEE ON THE TOP RIGHT CORNER, THERE IS MULTIPLE STEPPING CRACK.

UM, THERE'S, UH, UH, MULTIPLE CLASH CRACKS IN THE BRICK

[01:25:01]

SIDINGS BY THE WINDOWS.

AS YOU CAN SEE, THERE IS ANOTHER STEPPING CRACK ON THE LEFT TOP ANGLE.

THIS IS JUST A CONTEXTUAL PHOTO OF THE STEPPING CRACK OF THE BRICK SIDING, UH, AT THE REAR RIGHT ELEVATION OF THE STRUCTURE.

AND AS YOU CAN SEE, THERE'S MULTIPLE CRACKS BY THE WINDOWS AS WELL.

THE NEXT PHOTO IS UP UPON ENTERING THE, THE STRUCTURE.

UM, THE CEILING COVERING IS, UH, COLLAPSING AND IS MISSING IN SOME AREAS.

THE NEXT PHOTO SHOWING, UH, THE CENTER OF THE STRUCTURE UPON ENTERING THE STRUCTURE.

AS YOU CAN SEE, UH, THERE ARE SOME HOLES, UH, BETWEEN THE, THE, THE SIDING AND THE CEILING COVERING.

THE CEILING COVERING IS MISSING IN SOME AREAS WITH SOME CRACKS IN THE BRICK SIDING.

THE NEXT PHOTO IS TOWARDS THE, UH, LEFT, UH, SIDE OF THE STRUCTURE.

INTERIOR.

AS YOU CAN SEE, THE CEILING COVERING IS MISSING AND DAMAGED IN SOME AREAS WITH SOME HOLES, UM, THAT EXPOSE THE, THE INTERIOR TO THE ELEMENTS.

AS YOU CAN SEE, THERE IS MULTIPLE USE OF THE EXTENSION CORD THAT IS, UH, POSING ELECTRIC HAZARD.

THE THE NEXT PHOTO IS FURTHER DOWN TO THE LEFT, UH, HAND, LIKE WHEN YOU WALK TO THE MAIN STRUCTURE TO THE LEFT.

FURTHER DOWN, AS YOU CAN SEE, THE CEILING COVERING IS COLLAPSING AND DAMAGE IN SOME AREAS.

THIS IS THE CONTEXTUAL PHOTO OF THIS CEILING COVERING THAT IS DAMAGED AND, UH, ROTTED.

THIS IS, UH, ANOTHER PHOTO OF THE LEFT REAR ELEVATION OF THE STRUCTURE, UH, FOR THE EMERGENCY EXIT.

AT THE BACK, AS YOU CAN SEE, THERE ARE MULTIPLE, UH, CRACKS IN THE SIDING.

THERE IS, UH, MULTIPLE USE OF THE EXTENSION CORD, WHICH IS POSING ELECTRIC HAZARD WITH SOME HOLES IN THE, IN THE SIDING.

THIS IS JUST A CLOSER VIEW, UH, INDICATING THE, THE HOLES THAT IS EXPOSING THE INTERIOR TO THE ELEMENTS.

AND THIS IS A CONTEXTUAL PHOTO OF THE RIGHT PORTION OF THE STRUCTURE INTERIOR.

AS YOU CAN SEE, UH, THE CEILING COVERING IS MISSING AND DAMAGE IN SOME AREAS WITH MULTIPLE HOLES, UH, EXPOSING THE INTERIOR TO THE ELEMENTS.

THIS IS JUST ANOTHER CONTEXTUAL PHOTO OF THE, UH, LEFT SIDING OF THE STRUCTURE ANTERIOR.

THIS IS A SINGLE STORY COMMERCIAL STRUCTURE.

THE FRONT LEFT BRICK SIDING IS DETACHING WITH MULTIPLE CRACKS AT THE LEFT REAR AND THE BACK SIDING ELECTRIC, UH, WITH MULTIPLE OR ELECTRIC HAZARD WITH HOLES IN THE SIDING EXPOSING THE INTERIOR TO THE ELEMENTS.

THE SIDING IS LACKING WEATHER PROTECTION.

UH, I JUST WANT TO ADD, UM, ACCORDING TO THE, UH, STRUCTURE, TENANTS, TENANTS, THEY STATED THAT EVERY TIME IT RAINS, IT START LEAKING.

SO JUST WANT TO BRING THAT UP TO THE BOARD OF ATTENTION.

TO RECAP, THE STRUCTURE LOCATED IN 1918 MCCULLOUGH AVENUE IS IN VIOLATION OF CITY CODE ARTICLE EIGHT, CHAPTER SIX DASH 1 56, SUBSECTION 1, 2, 5, 7, 8, 11, 12, AND 15, IN WHICH ANY BUILDING OR STRUCTURE, WHICH HAS ANY OR ALL OF THE CONDITION OR DEFECTS HEREIN AFTER DESCRIBED, SHALL BE DEEMED TO BE A DANGEROUS BUILDING AND HAZARD TO PUBLIC HEALTH, HEALTH, SAFETY, AND WELFARE.

PROVIDED THAT SUCH CONDITIONS ARE OF DEFECTS, ARE DILAPIDATION, SUBSTANDARD, OR UNFITNESS FOR HUMAN HABITATION POSE A THREAT OR POTENTIAL THREAT TO LIFE, HEALTH, PROPERTY OR HUMAN SAFETY STAFF RECOMMENDS REPAIRS.

THAT CONCLUDES MY PRESENTATION OF 1918 MCCULLOUGH AVENUE.

CAN YOU, OKAY.

UH, I DO HAVE, OH, SORRY, GO AHEAD.

UM, MY APOLOGIES.

UM, I WOULD LIKE TO ADD A DEFINITION 11 FOR THE SUBSECTIONS, PLEASE.

OKAY.

OKAY, SO 11 IS ADDED.

OKAY.

UM, SO IT, THERE'S A RENTER AT THE PROPERTY THAT RUNS THE BUSINESS, OR, YES, IT IS A TIRE SHOP, MA'AM.

OKAY, SO THAT'S, THE RENTER

[01:30:01]

IS NOT THE OWNER OF THE PROPERTY? NO, THEY'RE, THEY'RE THE TENANTS.

THEY'RE PAYING RENT AND THAT IS WHAT THEY'RE GETTING .

AWESOME.

UM, OKAY.

UH, DO YOU KNOW WHO, UH, DID YOU EVER TALK TO THE MR. ALLISON THAT WAS A CONTRACTOR AGAIN? NO, MA'AM.

AFTER THAT, MA'AM, HE CALLED ME AND HE WAS TRYING TO GET MORE INFORMATION.

HE SAID HE GONNA DO ALL THE REPAIRS NEEDED, HE GONNA PAINT ALL THE PERMITS, BUT NONE OF THAT HAPPENS.

OKAY.

OKAY.

AND THERE IS WATER AND ELECTRICITY AT THESE PROPERTIES? YES, MA'AM.

OKAY.

IT IS AN ACTIVE BUSINESS.

OKAY.

ANY OTHER QUESTIONS? YEAH, GO AHEAD.

CAN JUST GET CLARIFICATION ON THAT LEFT SIDE, UH, BRICK, UH, WALL ON THE FRONT THAT LOOKS LIKE THAT IS, UH, STRUCTURAL, IT IS SUPPORTING THAT IT IS FALLING AWAY.

AND YOU DIDN'T TALK ABOUT THE FOUNDATION THAT IT IS STARTING TO SINK DEGRADE, BUT IS THAT WHAT'S HAPPENING IN THAT CORNER? CAN YOU PUT WHICH PICTURE? PICTURE? YEAH, TO THE FIRST PHOTO.

I MEAN, SECOND PHOTO, YEAH.

JPEG 1, 2 8.

IT'S ACTUALLY THE, THE, THE BRICK SIDING IS DETACHING.

UM, THE FOUNDATION, THE, THE WAY THAT THE, THE STRUCTURE IS DESIGNED IS, HAS LIKE A LITTLE, LIKE, IT'S GOING UP AND DOWN.

LIKE WHEN YOU DRIVE, THEY HAVE LIKE A LITTLE DRIVEWAY AT THE FRONT.

SO I BELIEVE THIS IS HOW IT HAD BEEN DESIGNED.

SO I DON'T THINK THERE'S ANY ISSUES WITH THE FOUNDATION.

ANY OTHER QUESTIONS? UH, MADAM CHAIR? YES.

UH, DID YOU SAY THERE HAVE BEEN NO PERMITS, UH, ISSUED FOR THIS, FOR REPAIR OF THIS BUILDING? NO, SIR.

OKAY.

I GOT A QUESTION.

YES.

ON 11 25 25, A EMAIL WAS SENT TO THE VACANT BUILDING PROGRAM.

IF THIS IS A BUSINESS, AN ACTIVE BUSINESS, WHY WAS AN EMAIL SENT TO VACANT TO THE VACANT BUILDING PROGRAM? SO THE VACANT BUILDING PROGRAM IS THEY, THEY COORDINATE WITH THE OHP, THE OFFICE OF HISTORIC RESERVATION.

SO WE NEED TO MAKE SURE THAT WE GET THE GREEN LIGHT FROM, UH, THE OFFICE OF HISTORIC RESERVATION TO CONFIRM THAT IT'S NOT SUBJECT FOR HISTORIC DESIGNATION.

SO IT IS JUST A PART OF THE PROCESS.

WE SEND IT TO THE VVP AND TO THE OHP.

OKAY.

THANKS.

THANK YOU.

THANK YOU.

UH, WE DO HAVE THE OWNER HERE.

UM, HERBERT, I DON'T WANNA PUT YOUR LAST NAME.

POLL.

ARD.

THANK YOU MADAM.

MADAM CHAIR? YES.

UH OH.

MR. LENARD, YOU CAN GO AHEAD AND COME UP.

UH, JUST FOR THE BOARD'S, UH, CLARIFICATION.

MM-HMM .

THE VACANT BUILDING PROGRAM WAS OPERATED UNDER THE OFFICE OF HISTORIC PRESERVATION, SO THAT'S WHY THEY WERE BOTH INCLUDED.

UH, SUBSEQUENT, UH, STARTING APRIL 1ST, UH, THE VACANT BUILDING PROGRAM IN ITS ENTIRETY HAS MOVED UNDER CODE ENFORCEMENT.

YOU WANT TO STAND, UH, FOR RIGHT NOW? YEAH, I MAY HAVE TO USE IT.

OKAY.

THANK YOU, COUNSEL.

THANK YOU.

OKAY.

DO I HAVE THE FLOOR? UH, DO I HAVE THE FLOOR NOW? YEAH.

OKAY.

YES.

FIRST OF ALL, I'M GOING TO WAIT ONE SECOND.

CAN, CAN YOU PLEASE STATE YOUR NAME AND YOUR, UH, CITY COUNCIL DISTRICT OR YOUR ADDRESS? I'M SORRY, WHAT? YOUR, YOUR NAME AND YOUR CITY COUNCIL DISTRICT, OR YOUR ADDRESS? UH, MY NAME IS HERBERT LENARD.

MM-HMM .

MY ADDRESS IS TWO 20 WEST SKYVIEW.

THANK YOU.

7 8 2 2 8.

OKAY.

UH, I WANTED TO ASK FOR, UH, RESET ON THIS BECAUSE I WASN'T PREPARED.

I JUST GOT NOTICE ON THIS FRIDAY.

HOWEVER, I CALLED YOUR OFFICES AND MADE NOTE OF THAT.

AND WHAT'S BEEN HAPPENING IS THAT THEY'VE BEEN SENDING IT TO THE WRONG ADDRESS.

I DON'T KNOW WHY, AND I'VE HAD THIS DISCUSSION WITH 'EM BEFORE, BUT IT CONTINUES TO HAPPEN.

I'VE LIVED AT TWO 20 LEWIS SKYVIEW FOR 26, 27 YEARS.

THAT'S MY ADDRESS.

I HAVE AN OFFICE BUILDING DOWN THE STREET AT 1000 NORTH MAIN.

I'VE MADE THAT QUITE CLEAR.

IF YOU NEED TO GET IN TOUCH WITH ME TO THE OFFICER HERE, THE ONLY CONTACT I'VE HAD WITH HIM OR NOTICE IS THROUGH MY TENANTS WHEN HE COMES BY TO VISIT HIM.

I HAVE NO PROBLEM MAKING THE REPAIRS, AND THAT'S WHY WE RETAINED MR. ALLISON.

UNFORTUNATELY, MR. ALLISON PASSED AWAY TWO WEEKS AGO.

OKAY.

SO I'M GETTING ANOTHER CONTRACTOR NOW.

I AM PREPARED WITH

[01:35:01]

A SHORT NOTICE.

I'VE GOT AN ENGINEER'S STATEMENT, IF YOU'D LIKE TO LOOK AT IT, IS THAT WOULD HELP YOU IN YOUR DECISION MAKING.

BUT AS FAR AS THE CONTRACT I HAVE, I DON'T HAVE A REPLACEMENT CONTRACTOR.

I DON'T HAVE ABILITY TO FILE PERMITS DURING THAT SHORT TIME PERIOD.

FRIDAY TILL TODAY, I HAVE NO PROBLEM REPAIRING THE BUILDING.

HOWEVER, IT IS A TIRE SHOP.

NOW, THAT BUILDING WAS MY OFFICE FOR 30 YEARS.

I MOVED OUT AND BOUGHT THE BUILDING OF 1000 NORTH MAIN ACROSS FROM MOVIES.

THAT'S WHERE I CURRENTLY OFFICE AND I HAVE THREE TENANTS IN THERE, AND I DON'T HAVE ANY PROBLEMS WITH CO COMPLIANCE THERE.

I THINK WHAT THE PROBLEM IS HERE IS YOU'VE GOT ALL THESE NEW CONDOS BUILT UP AROUND THERE, AND PEOPLE DON'T WANT A TIRE SHOP IN THEIR NEIGHBORHOOD.

THAT'S, I THINK THAT'S THE PREVAILING ISSUE.

I GET IT.

OKAY.

SO I'VE ALREADY MADE PLANS TO BUILD SOME CONDOS THERE.

HOWEVER, I'M NOT GONNA DO IT AT THIS INTEREST RATE.

OKAY.

SO I'M GONNA HAVE TO PUT THAT OUT.

I'VE GOT BANK FINANCING IN LINE, BUT I'M NOT GONNA PAY THAT KIND OF MONEY.

IT'S NOT WORTH IT.

BUT I'VE GOT ARCHITECTURAL PLANS, WHICH I CAN PROVIDE FOR, FOR A SEVEN UNIT CONDO, COMMERCIAL PARTIAL CAR, UH, MIXED USE COMMERCIAL AND RESIDENTIAL AT THAT LOCATION.

HOWEVER, I'M NOT GONNA PULL THE TRIGGER ON THAT UNTIL I GET MY FINANCING IN LINE.

IT'S, IT'S REASONABLE.

SO I WOULD PREPARE, I WOULD PROTECT THESE GUYS AT THE TIRE SHOP.

THEY'VE BEEN THERE LIKE 15 YEARS AND I DON'T HAVE ANY PROBLEM MAKING THE REPAIRS.

AND I WILL MAKE THE REPAIRS.

AND I'VE BEEN MAKING THE REPAIRS AND I'VE CERTAINLY BEEN, I'VE HAD THIS CONTRACTOR, HE WAS READY TO PULL THE TRIGGER TO GET GOING, AND UNFORTUNATELY HE DIED.

SO I'VE GOT OTHER CONTRACTORS LINED UP, BUT THEY HAVE TO HAVE TIME TO GO OUT THERE, LOOK AT THE BUILDING AND, AND ASSESS IT.

NOW, IF YOU LOOK AT THIS ENGINEER'S REPORT, THERE'S NOTHING STRUCTURALLY WRONG WITH THE BUILDING, AND HE DOES RECOMMEND SOME OF THE REPAIRS THAT YOU NOTED IN THAT PRESENTATION.

BUT AS FAR AS THE, THE CRACKS IN THE WALL, I BOUGHT THIS BUILDING 1978, THE CRACKS WERE IN THE WALL WHEN I BOUGHT IT, AND THEY'RE IN THE FLOOR WHEN I BOUGHT IT.

NOTHING'S CHANGED.

THE DROP CEILING IS WHAT I PUT IN THERE WHEN I HAD MY OFFICES.

UNFORTUNATELY, THESE GUYS AT THE TIRE SHOP HAVE THIS TIRE MACHINE THAT GOES UP AND DOWN AND POPS THE TIRES AND POPS THE RIMS AND EVERYTHING UP INTO THE, THEY BROKEN THEM ALL.

BUT THE, THE, THAT WAS JUST A, A COSMETIC THING THAT WAS, I PUT THAT IN THERE TO, AND I, BECAUSE I HAD AIR CONDITIONING COMING IN THERE, I HAD DROP CEILING LIGHTING.

THAT WAS ALL CUSTOM MADE 15, 20 YEARS AGO FOR MY OFFICES THERE.

BUT I DON'T THINK THE, THE CEILING TILES, I MEAN, I CAN REPLACE THOSE IF THAT'S GONNA BE AN ISSUE.

I DON'T SEE IT'S AN ISSUE.

THE EXTENSION CORD'S AN NOT EXTENSION CORD.

IT'S A PNEUMATIC CARD BECAUSE THESE GUYS RUN THE HOSES OUT FROM THEIR, THEIR, UH, WHAT DO YOU CALL IT, THEIR COMPRESSORS OUT TO THE LOT TO DO PEOPLE'S TIRES AND TAKE THEIR TIRES OFF.

BUT IF THERE'S AN EXTENSION CORD LAYING THERE, NO PROBLEM.

I DON'T THINK THERE IS NOW.

'CAUSE ONCE THEY WERE NOTICED, I'M SURE THAT THEY PULLED IT.

BUT I, YOU KNOW, I DON'T KNOW.

I THINK I'VE COVERED ALL THE ISSUES.

THE ONLY THING I CAN'T COVER IS, IS THE, UH, ESTIMATE ON THE REPAIRS RIGHT NOW AND A CONTRACTOR'S ESTIMATE BECAUSE THEY DON'T HAVE IT OTHER THAN MR. ALLISON'S.

ANY QUESTIONS? UH, MADAM CHAIR, I HAVE A QUESTION.

UH, THE NOTES THAT WE HAVE, UH, FROM THE COMPLIANCE OFFICER ON, UH, APRIL THE FOURTH OF 2025 SAID THAT, UH, MR. ALLISON CALLED THE OFFICER, UH, WHO SAID HE WAS A CONTRACTOR AND THAT THE, UH, OFFICER THEN MADE CONTACT WITH THE PROPERTY OWNER TO CONFIRM AND THE PROPERTY OWNER CONFIRMED.

SO DID YOU TALK TO THE CODE COMPLIANCE OFFICER APRIL THE FOURTH OF 2025? I DON'T RECALL THAT DATE, BUT YES, I HAVE TALKED TO HIM SEVERAL TIMES ON THE PHONE.

THAT'S THE ONLY CONTACT I'VE HAD, AND THAT'S THE ONLY NOTICE IS WHEN HE GOES BY THE FACILITY AND TALKS TO LIEUTENANTS AND THEY CALL ME UP ON THE PHONE.

AND OR AS FAR AS IN WRITING THIS NOTICE THAT I GOT FRIDAY, I MEAN, THEY BROUGHT IT OVER TO ME.

IT WASN'T SENT TO MY A BUSINESS OR MY HOME.

WHAT, WHAT IS THE ADDRESS THAT'S ON BA? ARE YOU TALKING TO ME? UH, MAD CHAIR.

YEAH.

UH, AS FAR AS THE ADDRESS, UH, NOTICE WAS SENT TO THE ADDRESS LISTED FOR THE OWNER MM-HMM.

ON BEXAR COUNTY APPRAISAL DISTRICT.

UH, RESEARCH WAS DONE ON THAT ADDRESS.

IT CAME BACK TO MR. ARD.

SO AS FAR AS, UH, NOTICE, ALL NOTICE REQUIREMENTS WERE MET WITH THE

[01:40:01]

ADDRESSES.

SO I WOULD RECOMMEND THAT, UH, MR. POLLARD, UH, YOU UPDATE THE OWNERSHIP INFORMATION WITH THE BEXAR COUNTY APPRAISAL DISTRICT.

WHAT ADDRESS IS THAT? UH, VILLAGE WAY.

THAT'S NOT MY ADDRESS.

I'VE NEVER LIVED THERE.

UH, WELL THAT'S, UH, COUNTY WEST.

I'VE USED MY HOME ADDRESS AND 1000 NORTH MAIN IS MY BUSINESS ADDRESS.

ALL MY TAX NOTICES GO TO THOSE ADDRESSES.

WELL, BEAR COUNTY HAS, THAT'S MY SON'S ADDRESS.

OH, LET ME FINISH.

OKAY.

BEAR COUNTY HAS YOUR ADDRESS.

HERBERT LAWRENCE ARD AT 51 0 7 VILLAGE WAY.

UH, TITLE SEARCH SHOWS THAT ADDRESS AS BEING YOURS.

SO ADDRESSES WERE SENT, UH, PURSUANT TO, UH, THE STATUTORY REQUIREMENTS OF 54 AND TWO 14.

THAT'S MY SON'S ADDRESS.

IT'S NOT MINE.

WELL, THAT'S WHAT BEAR COUNTY HAS.

SO YOU WOULD HAVE TO PARDON ME THAT THAT IS WHAT BEAR COUNTY HAS UNDER THE TITLE SEARCH.

SO YOU WOULD NEED TO UPDATE THAT WITH THEM.

I HAVE NO PROBLEM WITH THAT.

OKAY.

UM, ANY, ANY OTHER QUESTIONS? UH, WE SEE THE ENGINEER'S REPORT HERE.

IS THIS THE FULL REPORT? IS IT STAMPED? YES, THE REPORT IS 12 PAGES THAT WILL GO THROUGH THE REPORT.

AND ONCE MORE.

OKAY.

YEAH, LET'S DO THAT.

AND SIR, YOU ACKNOWLEDGE THAT MOST OF THIS REPORT ALREADY CONCURS WITH WHAT YES.

CODE HAS FOUND.

CORRECT? SIR, YOU HAVE ALREADY ACKNOWLEDGED THAT MOST OF THIS REPORT CONCURRED A LOT OF IT.

YES, EXCEPT FOR THE CRACKS IN THE BUILDING, WHICH THE ENGINEER DISPELLED BECAUSE THOSE AREN'T STRUCTURAL.

WELL, THAT'S WHY I SAID MOST OF THE REPORT.

YEAH.

OKAY.

SO IT CONCURS.

YEAH, THE BACK AREA WHERE THE CEILING JOIST IS ROTTED OUT.

YEAH, HE CONCURS.

OKAY.

HE CONCURS.

IT HAS TO HAVE A GUTTER TAKEN DOWN.

THERE'S A STRIP ON THE BACK OF THE BUILDING.

IT'S ALL ENUMERATED THERE.

OKAY.

UM, DOES ANYONE HAVE ANY OTHER QUESTIONS? OKAY.

UH, THANK YOU SIR.

YOU MAY BE SEATED.

ANY OTHER QUESTIONS? DID YOU HAVE SOMETHING TO ADD? OKAY.

COME UP.

THIS IS HASSAN ZAI AGAIN.

UH, I JUST WANT TO CONFIRM AS FAR AS LIKE COMMUNICATING WITH THE PROPERTY OWNER, IT WAS DONE MULTIPLE TIMES OVER THE PHONE AND VIA TEXT MESSAGES.

AND AS I MENTIONED IN MY OUTLINES, THIS IS THE ONLY PROPERTY THAT, UH, WE DID THE CONFERENCE MEETING, UH, REQUEST TWICE BECAUSE I RECEIVED A CALL FROM MR. LAWRENCE REQUESTING TO RESCHEDULE.

SO THAT'S WHY THIS IS THE ONLY PROPERTY THAT WE DID THE CONFERENCE MEETING ATTEMPT TWICE.

THANK YOU.

OKAY, I'M READY FOR A MOTION.

MADAM CHAIR, THIS IS FERNANDEZ.

I'D LIKE TO, UH, MAKE A MOTION.

OKAY.

I MOTION THAT THE PROPERTY LOCATED AT, UM, 1 9 1 8 MCCULLOUGH AVENUE.

IS IT PUBLIC NUISANCE, WHICH IS FEASIBLE TO REPAIR.

AND AT THIS TIME, I'D LIKE TO DO A RESET SO HE WOULD HAVE TIME TO FIND A CONTRACTOR, UM, AND, AND GET THE DOCUMENTS THAT ARE REQUIRED FOR THIS.

I'D LIKE TO RESET TO THE NEXT AVAILABLE DATE.

OKAY.

SO THE MOTION IS TO RESET TO THE NEXT AVAILABLE DATE AND TO REQUIRE, UH, THE DOCUMENTS.

YEAH, BECAUSE HIS CONTRACTOR HAS PASSED, SO HE NEED TO GET ALL OF HIS, UH, PAPERS TOGETHER AND A CONTRACTOR.

'CAUSE HE CAN'T BRING US TO BID, SO WE CAN'T GIVE HIM A TIMELINE IF WE DON'T HAVE THAT DOCUMENT.

CORRECT.

OKAY.

UH, IS THERE A SECOND? I SECOND.

OKAY.

IS THERE ANY DISCUSSION? UH, I WOULD LIKE A FRIENDLY AMENDMENT, UH, ADD, UH, FINANCIAL MEANS TO THAT DOCUMENT.

WELL, THAT WOULD BE REQUIRED YEAH.

AS PART OF IT? YEAH.

UM, WELL, WE REQUIRE THE CONTRACTOR, THE COURT CONTRACTOR, THE FINANCIAL STATEMENT.

YES.

UM, WHAT ENGINEERS, ENGINEERS REPORT, WHICH HE'S ALREADY GOT.

WE'VE ALREADY GOT IT.

SO HE'S ALREADY GOT THAT ONE.

BUT IF WE GO, ANYTHING OVER 60 DAYS WILL REQUIRE SPECIFIC, SO HE HAS THAT TIME TO GET ALL OF THAT TOGETHER BEFORE HE COMES BACK TO US.

OKAY.

AND IT IS SPECIFIED WITHIN THE SHEET THAT YOU READ THE THREE YEAH, NO, I KNOW THAT.

AND THEN CODE CAN, UH, GIVE HIM GUIDANCE.

OKAY.

SO WE'RE REQUIRING THE TWO DOCUMENTS THAT WE ARE MISSING? YES.

AND THAT'S GOOD, MELINDA? YES.

OKAY.

[01:45:01]

ALL RIGHT.

UH, LET'S DO A ROLL CALL.

VOTE.

KAYLA MIRANDA? YES.

JOEL SOLIS.

YES.

GEORGE GRIMES JR.

YES.

DR. LINDA LOPEZ RODRIGUEZ? YES.

YVONNE ADDISON.

YES.

FRED ANDIS? YES.

MOTION PASSES WITH THE VOTE OF SIX TO ZERO.

YOU CAN GET WITH THE CODE OFFICER.

WHAT IS THE TIME PERIOD? IT, IT, IT'LL BE THE NEXT AVAILABLE DATE.

UH, THAT JUST DEPENDS ON OUR SCHEDULING.

OKAY.

SO OUR NEXT, UM, ITEM IS 24 0 2 HICKS AVENUE TWO, BUILDING NUMBER TWO.

GOOD MORNING BOARD.

GOOD MORNING.

FOR THE RECORD.

MY NAME IS RYAN GARZA, THE DANGEROUS PREMISES OFFICER FOR THE CITY OF SAN ANTONIO DEVELOPMENT SERVICES DEPARTMENT.

THE ACCESSORY STRUCTURE BEING PRESENTED TODAY IS LOCATED AT 24 0 2 HICKS AVENUE, TWO, WITH A RECOMMENDATION FOR DEMOLITION IN ACCORDANCE WITH CITY CODE ARTICLE EIGHT, CHAPTER SIX.

THIS CASE IS THE FIRST TIME BEING HELD BEFORE THE BOARD.

THE LEGAL DESCRIPTION IS NCB 7 5 4 3 BLOCK 29, LOT NINE AND EAST 46 FEET OF 10, LOCATED IN CITY COUNCIL DISTRICT TWO.

THE OWNER ON RECORD IS CARLA JEAN GONZABA WITH THE MAILING ADDRESS OF 4 0 8 COSGROVE STREET, SAN ANTONIO, TEXAS 7 8 2 1 0.

ALL NOTICES OF HEARING WERE PROPERLY ISSUED AS REQUIRED.

THE FOLLOWING, UH, THE FOLLOWING INDIVIDUALS ARE PRESENT, WHICH WOULD BE THE OWNER.

UM, MS. CARLA JEAN GONZABA, UH, THE OFFICE OF HISTORIC PRESERVATION HAS CONFIRMED ON MARCH 3RD, 2025.

THE PROPERTY IS NOT ELIGIBLE FOR HISTORIC DESTINATION AND NO DECONSTRUCTION IS REQUIRED.

THE FOLLOWING IS A TIMELINE OF EVENTS REGARDING THE NOTIFICATION PROCESS.

THE FIRST INSPECTION REGARDING 24 0 2 HICKS AVENUE TWO WAS CONDUCTED ON DECEMBER 6TH, 2024.

THE ORIGINAL NOTICE WAS MAILED ON DECEMBER 6TH, 2024, AND A CERTIFIED RECEIPT WAS RETURNED UNCLAIMED ON DECEMBER 18TH, 2024.

AN ADMINISTRATIVE WARRANT WAS EXECUTED ON NOVEMBER 25TH, 2025 FOR INTERIOR INSPECTION AND PHOTOS.

ON JANUARY 27TH, A NEW NOTICE WAS SENT TO CARLA JEAN GONZABA AND CLAIMED ON JANUARY 14TH, 2026.

A SECOND ADMINISTRATIVE WARRANT WAS EXECUTED ON MARCH 18TH, 2026 FOR INTERIOR PHOTOS.

THE BSB POSTING WAS POSTED ON MARCH 26, 20.

MARCH 26TH, 2026 WAS POSTED AT THE LOCATION.

NO SCOPE OF WORK OR FINANCIAL PROOF OR LETTER OF CREDIT OR ENGINEERS REPORT THAT HAVE BEEN PROVIDED.

AS OF TODAY, NO PERMITS ARE FILED.

THE STRUCTURES LOCATED WITHIN A THOUSAND FEET OF HIGHLANDS HIGH SCHOOL WHERE THERE IS HEAVY FOOT TRAFFIC FROM THE SCHOOL ON DECEMBER 6TH, 2024 AND ON MARCH 18TH, 2026, THE ADMINISTRATIVE WARRANT WAS OBTAINED AND EXECUTED TO TAKE PHOTOS FOR TODAY'S PRESENTATION.

AND THIS IS THE FRONT ELEVATION OF THE ACCESSORY STRUCTURE.

THE PHOTO WAS TAKEN FROM THE RIGHT SIDE DUE TO THE PROXIMITY OF THE MAIN STRUCTURE, WHICH IS A COMMERCIAL, UM, OPERATING CONVENIENCE STORE.

THE ENTIRE WOODEN FRAMING AND WOODEN SIDING ARE DETERIORATED AND ROTTED, LACKING WEATHER PROTECTION.

THE OVERHANG AND FASCIA BOARDS HAVE DETACHED AND PORTIONS HAVE COLLAPSED.

THE ENTIRE ACCESSORY HAS BEEN VANDALIZED WITH GRAFFITI AND THE ACCESSORY STRUCTURE HAS A CONCRETE SLAB FOUNDATION, THE RIGHT SIDE ELEVATION, THIS IS THE RIGHT SIDE ELEVATION.

IT SHOWS A GLIMPSE OF THE GABLE ROOF SYSTEM, WHICH I WAS UNABLE TO OBTAIN A COMPLETE PHOTO OF THE ENTIRE ROOF SYSTEM.

THE FACIAL BOARDS ARE ROTTED AND THE WOODEN SIDING IS DETERIORATED, LACKING WEATHER PROTECTION.

THE ENTIRE RIGHT SIDE ELEVATION HAS WINDOW GLAZING AND HAS, UM, BEEN GRAFFITIED ON MUL MULTIPLE TIMES.

THIS PHOTO SHOWS THE REAR ELEVATION TAKEN FROM THE RIGHT REAR CORNER.

THE FACIAL BOARDS ARE MISSING AND THE REAR ELEVATION IS LISTING AND HAVE, AND HAS AND HAS A WAVE EFFECT.

GRAFFITI IS PRESENT.

THE MIDDLE COVERING HAS DETACHED FROM THE ROOF SYSTEM.

THIS IS ANOTHER PHOTO OF THE REAR ELEVATION TAKEN FROM THE ALLEY DUE TO THE PROXIMITY OF THE REAR FENCE LINE BY THE ALLEY.

THE WOODED SIDING IS LACKING WEATHER PROTECTION AND A PART OF THE WOODEN OVERHANG AS SEEN IN THIS PHOTO HAS DETACHED AND

[01:50:01]

IS ABOUT TO COLLAPSE.

WINDOW GLAZING IS ALSO PRESENT, BUT HAS BEEN BOARDED UP BY THE OWNERS.

THIS PHOTO SHOWS A LEFT ELEVATION OF THE ACCESSORY STRUCTURE.

THE FACIAL BOARD'S OVERHANG OF WOOD IS SIDING, IS DETERIORATED AND LACKING WEATHER PROTECTION.

THE LEFT ELEVATION HAS A HOLE WHERE UNHOUSED INDIVIDUALS ARE GOING IN AND OUT OF THE ACCESSORY STRUCTURE.

THE PLUMBING IS ALSO EXPOSED AND WINDOW GLAZING IS PRESENT, BUT AGAIN, HAS BEEN BOARDED UP BY THE OWNERS.

THIS PHOTO WAS TAKEN FROM THE INTERIOR REAR SHOWING THE FRONT ELEVATION.

THE FRONT INTERIOR WALL HAS SEVERE WATER DAMAGE AND PORTIONS ARE MISSING, AND SOME PORTIONS OF THE WALL HAVE WALL AND THE CEILING HAVE COLLAPSED.

EVIDENCE OF UNH INDIVIDUALS UNHOUSED INDIVIDUALS ARE GOING IN AND OUT OF THE ACCESSORY STRUCTURE.

TRASH AND DEBRIS ARE SCATTERED THROUGHOUT THE INTERIOR.

THE NEXT TWO PHOTOS WILL SHOW A CLOSEUP OF THE SEVERE DAMAGE AND HOLES IN THE ROOF SYSTEM.

THIS PHOTO SHOWS A CLOSEUP OF THE SEVERELY DAMAGED ROOF SYSTEM LOCATED ON THE FRONT RIGHT ELEVATION.

THE WOODEN AND CEILING JOISTS RAPTORS AND TOP PLATE ARE ROTTED AND DAMAGED, AND PORTIONS HAVE COLLAPSED.

THE HOLES ON THE ROOF SYSTEM HAVE CAUSED THE OUTSIDE ELEMENTS AND WILDLIFE TO ENTER THE ACCESSORY STRUCTURE.

THIS PHOTO SHOWS A CLOSEUP OF THE SEVERELY DAMAGED ROOF SYSTEM LOCATED ON THE RIGHT LEFT ELEVATION.

THE CEILING JOIST, RAFTERS AND TOP PLATE ARE ROTTED AND DAMAGED, AND PORTIONS HAVE COLLAPSED.

THE HOLES IN THE ROOF SYSTEMS HAVE ALLOWED THE OUTSIDE ELEMENTS TO ENTER ALONG WITH WILDLIFE ON THE ACCESSORY STRUCTURE.

THIS PHOTO IS THE RIGHT INTERIOR ELEVATION.

THE SHEET ROCK HAS WATER DAMAGE AND PORTIONS HAVE COLLAPSED EXPOSING THE WOODEN MEMBERS.

WINDOW GLAZING IS PRESENT.

THIS PHOTO SHOWS EVIDENCE OF UNHOUSED INDIVIDUALS GOING IN AND OUT OF THE ACCESSORY STRUCTURE.

YOU CAN SEE THE, YOU CAN SEE AN OVERVIEW OF THE WATER DAMAGE TO THE SHEET ROCK AND TRASH AND DEBRIS ARE SCATTERED.

THIS PHOTO IS AN OVERVIEW OF THE CEILING BOWING INWARDS TOWARDS THE CENTER, SHOWING THE WATER DAMAGE TO THE SHEET ROCK AND BEAMS. THIS PHOTO ALSO SHOWS TRASH AND DEBRIS SCATTERED.

THIS PHOTO SHOWS MORE OF THE WATER DAMAGE TO THE INTERIOR LEFT ELEVATION.

THE TOP PLATE IS ROTTED AND EXPOSED.

YOU CAN SEE SEPARATION FROM THE TOP PLATE, DETACHING FROM THE WOODEN FRAMING OF THE INTERIOR FRONT LEFT SIDE ELEVATION.

SHEET ROCK IS MISSING AND THE CEILING EXPOSED.

UM, DUE TO THE WATER DAMAGE OF WOODEN MEMBERS, THE CEILING SHEET ROCK HAS SEPARATED AND STARTED TO DETACH FROM THE SEVERE WATER DAMAGE AND IS STARTING TO CAVE IN.

THIS IS A COMMERCIAL SINGLE STORY ACCESSORY STRUCTURE.

THE COMMERCIAL SINGLE STORY ACCESSORY STRUCTURE IS IN A DETERIORATED CONDITION AND HAS WATER DAMAGE TO THE WOODED MEMBERS.

THE LOAD BEARING WALLS HAVE MAJOR WATER DAMAGE AND HAVE CAUSED THE LOAD BEARING WALLS TO BE COMPROMISED.

THE ENTIRE ACCESSORY STRUCTURE IS LACKING WEATHER PROTECTION.

THE STRUCTURE'S GABLE ROOF MIDDLE SYSTEM IS, HAS COLLAPSED IN THE FRONT ELEVATION AND THE ROOF SYSTEM HAS SEVERAL HOLES.

THE ACCESSORY STRUCTURE IS WITHIN A THOUSAND FEET OF A HIGH SCHOOL.

TO RECAP, THE ACCESSORY STRUCTURE LOCATED AT 24 0 2 HICKS AVENUE TWO IS IN VALIDATION OF CITY CODE ARTICLE EIGHT, CHAPTER SIX DASH 1 56, SUBSECTIONS 1, 2 5 7, 8, 11, 12, 15, 17, AND 18, IN WHICH ANY BUILDING OR STRUCTURE, WHICH HAS ANY OR ALL CONDITIONS OF DEFECTS HEREINAFTER DESCRIBED SHALL BE DEEMED TO BE A DANGEROUS BUILDING AND A HAZARD TO PUBLIC HEALTH, SAFETY AND WELFARE.

PROVIDED THAT SUCH CONDITIONS OF DEFECTS OF DILAPIDATION SUB CENTEREDNESS OR UNFITNESS FOR HUMAN HABITATION POSE A THREAT OR POTENTIAL THREAT TO LIFE, HEALTH, PROPERTY AND HUMAN SAFETY STAFF RECOMMENDS DEMOLITION.

THAT CONCLUDES MY PRESENTATION OF 24 0 2 HICKS AVENUE TWO.

ARE THERE ANY QUESTIONS FOR THE OFFICER? THANK YOU.

UH, WE DO HAVE A SPEAKER, UH, SIGNED UP.

UH, IT WILL BE THE OWNER, CARLA JEAN.

OKAY.

SO, OH, I'M MAKING ONE MOMENT.

OH, GO AHEAD.

OH, SORRY.

I'M MAKING AN AMENDMENT.

UH, I NEEDED TO ADD SUBSECTIONS ONE, TWO, AND 18 1, 2, AND 18.

SO WE ARE, WE'RE ADDING,

[01:55:01]

UH, SUBSECTIONS ONE, TWO, AND 18.

CORRECT.

OKAY.

AND, AND I WOULD LIKE TO SAY THAT THE OWNERS ARE HERE AND THEY ALSO WANT TO, UH, HAVE THE PROPERTY DEMOLISHED.

OKAY.

THAT'S GREAT.

UM, THANK YOU.

IF YOU WANNA COME UP.

HELLO, MY NAME'S IF YOU YEAH.

STATE YOUR NAME AND YOUR, YOUR, EITHER YOUR ADDRESS OR YOUR CITY COUNCIL.

MY NAME'S CARLA JEAN GONZABA.

MY ADDRESS IS 4 0 8 COSGROVE.

OKAY.

AND I HAVE BEEN IN COMMUNICATION WITH RYAN SINCE DECEMBER OF 2024.

AND AM AN AGREEMENT, UH, TO GET THE PROPERTY DEMOLISHED.

IT'S TAKEN A LONG TIME AND IT WAS UNDER THAT HOME HARMLESS AGREEMENT.

I GUESS THE FIRST, UH, AGREEMENT WAS SUPPOSED TO BE ON JANUARY 22ND.

I WAS READY TO COME THAT DAY AND, UM, I GUESS THE COURT WAS CANCELED FOR THAT DAY OR THE, THE MEETING FOR THAT DAY HE TOLD ME.

SO, UM, BUT I'M IN AGREEMENT TO GET THE PROPERTY DEMOLISHED.

OKAY.

ANY QUESTIONS? ALL RIGHT, THANK YOU.

OKAY.

ALL RIGHT.

I'M READY TO HOLD.

UH, I HEAR A MOTION, I, I'LL MAKE A MOTION.

OKAY.

I, I MOVE THAT THE PROPERTY LOCATED AT, UM, 24 0 2 HICKS AVENUE TWO BUILDING TWO IS A PUBLIC NUISANCE, WHICH IS NOT FEASIBLE TO BE REPAIRED AT THIS TIME, AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6.

SUBSECTIONS 1, 2 5 7, 8, 11, 12, 15, 17, 18.

I MOVE THAT THE PROPERTY BE DEMOLISHED WITHIN 30 DAYS OF THE ISSUANCE OF THIS ORDER AND, UM, BE SECURED FREE OF TRASH AND DEBRIS.

OKAY, LET ME READ THAT BACK.

UM, THE MOTION IS THAT THE PROPERTY LOCATED AT TWO, UH, 2 4 0 2 HICKS AVENUE, UM, TWO BUILDING TWO, UM, IS A PUBLIC NUISANCE, WHICH IS NOT FEASIBLE TO BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, UH, SECTION 1 56, SUBSECTIONS 1, 2, 5, 7, 8, 11, 12, 15, 17, AND 18, AND SHOULD BE DEMOLISHED WITHIN 30 DAYS AND BE SECURED AND FREE OF TRASH AND DEBRIS.

DO WE HAVE A SECOND MADAM CHAIR? THIS IS FRED ANDIS.

I SECOND.

OKAY.

ANY DISCUSSION? CAN WE HAVE A ROLL CALL VOTE.

KAYLA MIRANDA.

YES.

JOE SOLIS.

AYE.

GEORGE GRIMES JR.

YES.

DR. LINDA LOPEZ RODRIGUEZ? YES.

YVONNE ADDISON.

YES.

FRED ANDES? YES.

MOTION PASSES WITH A VOTE OF SIX TO ZERO.

OKAY.

YOU CAN GET WITH YOUR CODE OFFICER.

MADAM CHAIR, COULD WE TAKE A BRIEF RECESS? YES.

LET'S TAKE A, UH, A BREAK.

THE TIME IS 11:02 AM AND WE'RE TAKING A RECESS.

THE TIME IS 11:08 AM AND WE ARE COMING BACK.

OUR NEXT PROPERTY IS, UH, 1728 EL MONTE BOULEVARD.

GOOD MORNING BOARD AGAIN.

GOOD MORNING FOR THE RECORD.

MY NAME IS HASSANA ZAI.

I'M A DANGEROUS PERMIT OFFICER WITH CITY OF SAN ANTONIO DEVELOPMENT SERVICES DEPARTMENT.

THE ACCESSORY STRUCTURES BEING PRESENTED TODAY IS LOCATED AT 1 7 2 8 IN MONTE BOULEVARD, SAN ANTONIO, TEXAS, WITH A RECOMMENDATION FOR DEMOLITION IN ACCORDANCE WITH CITY CODE ARTICLE EIGHT, CHAPTER SIX.

THIS IS THE FIRST TIME THIS CASE IS BEING PRESENTED BEFORE THIS BOARD.

THE LEGAL DESCRIPTION IS NCB 9 0 8 5 BLOCK 1 8 4 LOT E 37.5 FOOT OF TWO AND W 25 FOOT OF THREE LOCATED IN CITY COUNCIL DISTRICT ONE.

THE OWNER ON ON RECORD IS BERTHA HERNANDEZ WITH A MAILING ADDRESS OF 7 1 7 2 8 EL MONTE BOULEVARD, SAN ANTONIO, TEXAS 7 8 2 0 1.

ALL NOTICES OF HEARING WERE PROPERLY ISSUED AS REQUIRED.

THE OWNER ON RECORD IS NOT PRESENT TODAY.

DOES THE BOARD WISH TO PROCEED? YES.

NO CONTACT WAS MADE WITH THE PROPERTY OWNER.

THE OFFICE OF HISTORIC RESERVATION HAS CONFIRMED ON NOVEMBER 5TH, 2025.

[02:00:01]

THE PROPERTY IS NOT ELIGIBLE FOR HISTORIC DESIGNATION, DECONSTRUCTION IS REQUIRED.

THE FOLLOWING TIMELINE OF EVENTS REGARDING THE NOTIFICATION PROCESS, THE FIRST INSPECTION REGARDING 1 7 2 8 EL MONTE BOULEVARD WAS CONDUCTED ON NOVEMBER 14TH, 2024.

ORIGINAL NOTICE OF VIOLATION WAS MAILED ON DECEMBER 3RD, 2024, AND THE NOTICE OF VIOLATION WAS CLAIMED ON DECEMBER, UH, FOURTH 2024.

THE CONFERENCE MEETING LETTER WAS MAILED TO THE PROPERTY OWNER ON DECEMBER 4TH, 2025.

AND ON DECEMBER 12TH, 2025, CONFERENCE MEETING HELD AT DSD WITH NO ATTENDANCE OF THE PROPERTY OWNER ON MARCH 26TH, 2026.

THE NOTICE FOR BSB HEARING WAS POSTED AT 1 7 2 8 EL MONTE BOULEVARD ON MARCH 20, UH, ON MARCH 25TH, 2026.

THE NOTICE FOR BSB HEARING WAS MAILED TO THE PROPERTY OWNER.

NO SCOPE OF WORK OR FINANCIAL PROOF OR LETTER OF CREDIT OR ENGINEER'S REPORT HAS BEEN PROVIDED AS OF TODAY.

APRIL 9TH, 2020 FI 2026.

MY APOLOGIES.

NO PERMIT ON FILE AS OF TODAY.

APRIL 9TH, 2026.

THIS IS THE ACCESSORY STRUCTURE.

UM, THIS IS A CONTEXTUAL PHOTO OF A SINGLE STORY WITH SLAP ON GREAT FOUNDATION, WOODEN SIDING AND GABLE ROOF SYSTEM WITH ASPHALT SHINGLE COVERING THE NEXT PHOTO, SHOWING THE FRONT LEFT ELEVATION OF THE STRUCTURE.

AS YOU CAN SEE, THE WOOD SIDING IS EXTREMELY DAMAGED, ROTTED AND DETERIORATED AND WEATHER WORN.

OKAY, THIS IS THE BEST ANGLE THAT I CAN GET.

UH, THIS IS SHOWING THE, UH, LEFT REAR ELEVATION OF THE STRUCTURE.

THE WOODEN SIDING IS SEVERELY DETACHING AND COLLAPSING, AND IT IS WEATHER WORN.

THE NEXT PHOTO SHOWING THE FRONT RIGHT ELEVATION OF THE STRUCTURE, IT SEEMS THAT, UH, THERE IS, UM, UH, A PORCH COVERING THAT IS COLLAPSING AND, UH, THE ROOF COVERING IS COLLAPSING WITH MULTIPLE HOLES.

THIS IS THE BEST ANGLE THAT I CAN GET BECAUSE THE ACCESSORY IS CLOSE TO THE MAIN.

THIS IS SHOWING THE FRONT RIGHT ELEVATION OF THE STRUCTURE.

THE WOOD SIDING IS EXTREMELY ROT AND A PART OF THE ROOF SYSTEM IS MISSING.

THIS IS SHOWING, UH, THE FRONT PORCH COVERING AND THE FRONT OF THE ACCESSORY STRUCTURE.

AS YOU CAN SEE, UH, THE PORCH COVERING IS COLLAPSING AND IT'S DETERIORATED.

THE NEXT PHOTO SHOWING THE FRONT, UH, RIGHT, I MEAN THE REAR RIGHT ELEVATION OF THE STRUCTURE.

UM, THE WOODEN SIDING, E EXTREMELY ROTTED, AND THE ROOF COVERING IS COLLAPSING AND MISSING IN SOME AREAS.

UM, I WAS ABLE TO TAKE SOME PHOTOS FROM THE WINDOWS.

THE WINDOWS ARE UNSECURED.

THIS PHOTO SHOWING THE STRUCTURE INTERIOR IS FULL OF ITEMS AND, AND TRASH AND SCATTERED LIKE TIRES AND OTHER ITEMS THAT ARE CAUSING, UH, EGRESS ISSUES.

THIS IS ANOTHER PHOTO FROM THE WINDOW SHOWING THE STRUCTURAL INTERIOR, UM, FULL OF ITEMS AND TRASH AND DEBRIS, WHICH IS CAUSING, UH, EGRESS ISSUES.

AS YOU CAN SEE ON THE TOP, THE ROOF COVERING IS COMPLETELY COLLAPSING AND MISSING WITH MULTIPLE HOLES EXPOSING THE INTERIOR TO THE ELEMENTS.

THE NEXT PHOTO SHOWING, UM, I BELIEVE IT IS THE MAIN ENTRANCE DOOR, WHICH IS MISSING.

AS YOU CAN SEE, A SCATTERED TRASH AND DEBRIS THROUGHOUT.

AND THIS IS ANOTHER ANGLE OF THE RIGHT SIDE OF THE STRUCTURAL INTERIOR.

AS YOU CAN SEE, THERE'S A SCATTERED TRASH AND ITEMS AND DEBRIS, AND THE ROOF SYSTEM IS COLLAPSING AND MISSING IN SOME SECTIONS.

AND THIS IS JUST A CONTEXTUAL PHOTO TO SHOW THE WHOLE, UH, ACCESSORY STRUCTURE.

I WAS NOT ABLE TO GO INSIDE THE STRUCTURE FOR SAFETY CONCERNS.

, THIS IS A SINGLE STORY ACCESSORY STRUCTURE.

THE STRUCTURE IS VACANT AND UNSECURED FROM UNAUTHORIZED PERSONNEL, AND IT IS COLLAPSING.

THE ROOF SYSTEM IS EXTREMELY DAMAGED.

THE ROOF SYSTEM IS COLLAPSING TOWARDS THE CENTER OF THE STRUCTURE AND THE, UM, THE ROOF COVERING IS MISSING IN SOME SECTIONS, THE WOODEN SIDING IS DAMAGED, ROTTED AND DEACH WITH BROKEN WINDOWS AND MISSING DOORS.

THE ACCESSORY STRUCTURE

[02:05:01]

CONTAINING A LONG-TERM DETERIORATION CAUSED BY LACK OF WEATHER APPROVING.

TO RECAP, THE ACCESSORY STRUCTURE LOCATED AT 1728 EL MONTE BOULEVARD IS IN VIOLATION OF CITY CODE ARTICLE EIGHT, CHAPTER SIX DASH 1 56, SUBSECTIONS 1, 2 5 7 8, 11, 12, 15, 17, AND 18, IN WHICH ANY BUILDING OR OR STRUCTURE, WHICH HAS ANY OR ALL OF THE CONDITIONS OR DEFECTS HEREIN AFTER DESCRIBED, SHALL BE DEEMED TO BE DANGEROUS BUILDING AND HAZARD TO PUBLIC HEALTH, SAFETY AND WELFARE.

PROVIDED THAT SUCH CONDITIONS OR DEFECTS OF DILAPIDATION OF, UH, SUBSTANDARD OR UNFITNESS FOR HUMAN HABITATION POSE A THREAT OR POTENTIAL THREAT TO LIFE, HEALTH, PROPERTY, OR HUMAN SAFETY STAFF RECOMMENDS DEMOLITION OF THE ACCESSORY STRUCTURE.

THAT CONCLUDES MY PRESENTATION OF 1 7 2 8 EL MONTE BOULEVARD.

ARE THERE ANY QUESTIONS OF THE OFFICER? OKAY, THIS IS JOEL PLACES.

IS THERE ANY UTILITIES HOOKED UP TO THE ACCESSORY? UM, THERE ARE SOME CABLES, BUT I'M NOT SURE IF IT'S, UH, THERE'S LIKE AN ACTIVE UTILITIES TO THE ACCESSORY STRUCTURE.

LIKE ACTIVE LIVE WIRES THERE? YES.

OKAY.

ALRIGHT.

THANK YOU.

THANK YOU.

OKAY.

THANK YOU.

THANK YOU MA'AM.

UH, WE DO HAVE THE OWNER'S SON HERE, JUAN RODRIGUEZ.

PLEASE STATE YOUR NAME AND EITHER YOUR ADDRESS OR YOUR CITY COUNCIL DISTRICT.

OH, JUAN RODRIGUEZ.

1728 ON MONTE BOULEVARD.

OKAY, GO AHEAD.

YOU HAVE THREE MINUTES.

THREE MINUTES? YES.

OKAY.

UM, I HAD TALKED TO THIS GENTLEMAN, UH, THE COURT ENFORCEMENT, UH, LAST JUNE.

HE ACTUALLY, UH, SHOWED UP TO THE LOCATION WHEN WE WERE WORKING ON THE BACKYARD AND HE SAID, UH, YOU NEED TO TEAR DOWN THE STRUCTURE.

I SAID, OKAY.

SO THEN ABOUT I, I'M NOT TOO SURE ABOUT, ON A DATE, MAYBE ABOUT TWO MONTHS LATER, HE CAME BACK AND I, I DID HAVE THE MACHINES TO TEAR IT DOWN AND HE SAID, NO, YOU NEED TO GET A PERMIT.

I WASN'T AWARE OF THAT.

I ALREADY HAD RENTED THE MACHINES TO TEAR IT DOWN.

'CAUSE THAT'S WHAT I, I WANT TO DO.

I NEED TO TEAR IT DOWN, IT LOOKS, YOU KNOW, AND, UM, SO HE SAID, NO, I NEED TO GET A PERMIT.

AND THEN THAT'S WHEN ALL THIS STARTED HAPPENING.

SO I'M WILLING TO PULL THE PERMIT AND, YOU KNOW, AND TEAR IT DOWN AND RENT THE MACHINES AGAIN.

UM, BECAUSE THEY DID, YOU KNOW, IT'S NOT JUST LIKE, OH, YOU CAN RENT ONE DAY, GET IT DELIVERED.

YOU KNOW, IT WAS SEVERAL DAYS THAT I HAD TO PAY FOR AND NOW I HAVE TO DO THAT AGAIN.

SO, YOU KNOW, COMING THROUGH THE HOLIDAYS, IT WAS KIND OF TOUGH FOR ME.

SO I I DON'T MIND TEARING IT DOWN.

I JUST, YOU KNOW, I'LL PAY FOR THE PERMIT TODAY AND THEN IF YOU COULD GIMME, YOU KNOW, AT LEAST 60 DAYS TO TEAR IT DOWN, YOU KNOW THAT I, I WOULD BE OKAY WITH THAT, YOU KNOW, IF Y'ALL ARE OKAY.

OKAY.

ANY QUESTIONS? I THINK THE ISSUE WITH THIS ONE WAS, IT NEEDED TO BE DECONSTRUCTED, WASN'T IT? YES.

IT HAS TO BE DE DECONSTRUCTED.

YES.

SO CAN WE, HOW THAT WOULD WORK IF WE'RE MOVING FORWARD TO LET THE OWNER DEMO, OH, I'M SORRY.

YEAH.

THIS IS, THIS IS HAS THAT WAY AGAIN.

YES, DECONSTRUCTION IS REQUIRED.

DE OKAY.

ALRIGHT.

YEAH.

NO CHAIR.

YES.

UH, I, UH, REQUEST AN EXECUTIVE SESSION TO DISCUSS ATTORNEY-CLIENT MATTERS.

OKAY.

UM, IF YOU'LL JUST HAVE A SEAT.

UH, WE'LL, WE'LL BE RIGHT BACK.

UM, SO THE TIME IS NOW 11:18 AM ON, UH, APRIL 9TH, 2026.

THE BUILDING STANDARDS BOARD WILL RECESS FROM OPEN MEETING AND CONVENE IN EXECUTIVE SESSION TO CONSULT WITH LEGAL COUNSEL TO DISCUSS ATTORNEY CLIENT MATTERS PURSUANT TO SECTION 5 5 1 0 7 1 OF THE TEXAS GOVERNMENT CODE.

THE TIME IS NOW 11:29 AM ON APRIL 9TH, 2026, AND THE BUILDING STANDARDS BOARD WILL NOW RECONVENE AN OPEN SESSION.

NO OFFICIAL ACTION WAS TAKEN IN THE EXECUTIVE SESSION.

IS THERE ANY OTHER QUESTIONS OR COMMENTS FROM ANYONE? OKAY, I'M OPEN FOR A MOTION.

YEAH.

THIS IS JOE ALISE.

I MOVE THAT THE PROPERTY AT 1728, UH, EL MONTE BOULEVARD, THE ACCESSORY, UH, AS A PUBLIC NUISANCE, WHICH IS NOT FEASIBLE TO BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6, UH, SPECIFICALLY SECTIONS 1, 2, 5, 7, 8, 11, 12, 15, 17, AND

[02:10:01]

18.

I MOVE THAT THE PROPERTY BE DEMOLISHED WITHIN 30 DAYS FROM THE ISSUANCE OF THIS ORDER THAT DECONSTRUCTION BE WAIVED AND THAT IT'D BE FREE OF TRASH AND DEBRIS.

SO THE MOTION IS THAT THE PROPERTY LOCATED AT, UM, 17:23 AM MONTE BOULEVARD IS A PUBLIC INNOCENCE, WHICH IS NOT FEASIBLE TO RE BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6, UH, SUBSECTIONS.

AND THIS IS FOR THE ACCESSORY, 1, 2, 5, 7, 8, 11, 12, 15, 17, AND 18 AND SHOULD BE DEMOLISHED WITHIN 30 DAYS.

AND WE MOVE TO WAIVE THE, UM, DECONSTRUCTION REQUIREMENTS, UH, FOR THE ACCESSORY.

IS THAT CORRECT? AND, AND, UH, FREE OF TRASH AND DEBRIS.

IS THERE A SECOND? CAN YOU REPEAT THE NUMBERS AGAIN? 1, 2, 5, 7, 8, 11, 12, 15, 17, AND 18.

MADAM CHAIR, I SECOND.

OKAY.

ANY DISCUSSION? ALL A FIELD CALL VOTE.

KAYLA MIRANDA? YES.

JOEL SOLIS.

YES.

GEORGE GRIMES JR.

YES.

DR. LINDA LOPEZ RODRIGUEZ? YES.

YVONNE ADDISON.

YES.

FRED ANDIS? UH, YEAH.

MOTION PASSES WITH A VOTE OF 6 2 0 YOU CAN GET WITH THE CODE OFFICER.

OUR NEXT PROPERTY IS THREE 12 FIGHT ALLEY.

IS IT FIGHT .

GOOD MORNING BOARD MEMBERS.

GOOD MORNING FOR THE RECORD.

MY NAME IS JOHN GARZA, S PREMISE OFFICER FOR THE CITY OF SAN ANTONIO DEVELOPMENT SERVICES DEPARTMENT.

THE STRUCTURE BEING PRESENTED TODAY IS LOCATED AT 3 1 2 FIGHT ALLEY WITH A RECOMMENDATION FOR DEMOLITION IN ACCORDANCE WITH CITY CODE ARTICLE EIGHT.

CHAPTER SIX.

THIS CASE IS THE FIRST TIME BEING HEARD BY THIS BOARD.

THE LEGAL DESCRIPTION IS NCB 24 18 BLOCK C LOT SOUTH 48.5 OF NORTH 1 0 8 0.5 FEET OF 12 AND SOUTH, 48.5 OF NORTH 1 0 8 0.5 OF WEST 10 FEET OF 13 LOCATED IN CITY COUNCIL DISTRICT FIVE.

THE OWNER ON RECORD IS SEVEN IGNACIO HUTA WITH A MAILING ADDRESS OF 7 38 EDGE BROOK LENGTH, SAN ANTONIO, TEXAS 7 8 2 1 3.

ALL NOTICES OF HEARING WERE PROPERLY ISSUED AS REQUIRED.

NO FOLLOWING INDIVIDUALS ARE PRESENT TODAY.

DOES THE BOARD PUSH TO PROCEED? YES.

OKAY.

CONTACT WAS MADE WITH THE DAUGHTER OF THE PROPERTY OWNER, MS. MARY ALICE.

THE OFFICE OF HISTORIC PRESERVATION HAS CONFIRMED ON JULY 3RD, 2025.

THE PROPERTY IS NOT ELIGIBLE FOR HISTORIC DESIGNATION BUT IS UNDER CONSIDERATION FOR, UM, DECONSTRUCTION IS REQUIRED.

THE FOLLOWING IS A TIMELINE OF EVENTS REGARDING THE NOTIFICATION PROCESS.

THE FIRST INSPECTION REGARDING 3 1 2 FIGHT ALLEY WAS CONDUCTED ON APRIL 30TH, 2024.

ORIGINAL NOTICE WAS MAILED ON MAY 15TH, 2024 AND THE CERTIFIED NOTICE HAS NOT RETURNED ON MARCH 26TH, 2026.

THE NOTICE FOR BSB HEARING WAS POSTED AT 3 1 2 5 ALLEY SAN ANTONIO, TEXAS 7 8 2 0 7 ON MARCH 24TH, 2026 THE NOTICE FOR BSB HEARING WAS MAILED TO THE OWNER AND A CERTIFIED RECEIPT HAS NOT RETURNED.

NO SCOPE OF WORK OR FINANCIAL PROOF OR LETTER OR CREDIT ENGINEER'S REPORT HAS BEEN PROVIDED AS OF APRIL 8TH, 2026.

THERE ARE NO CURRENT PERMITS ON FILE FOR 3 1 2 5 ALLEY 3 1 2 FIGHT ALLEY IS ALSO WITHIN 1000 FEET OF SYDNEY LEAR LANIER HIGH SCHOOL.

THERE HAS BEEN NO ABATEMENT FOR THIS PROPERTY.

[02:15:01]

THE PHOTOS THAT ARE BEING PROVIDED TODAY, TODAY'S PRESENTATION WERE TAKEN ON FEBRUARY 5TH, 2026.

3 1 2 5 ALLEY IS A 1020 SQUARE FOOT WOODEN VACANT STRUCTURE IN AN R FOUR ZONE LOCATED IN DISTRICT FIVE.

THE STRUCTURE CURRENTLY DOES NOT HAVE UTILITIES AS VERIFIED BY CPS DISCONNECTS AND SAN ANTONIO WATER SYSTEM HERE, THE FRONT ELEVATION, THE OVERHANG HAS FIRE DAMAGE AND IS MISSING IN SOME AREAS.

SOME ROOF SHINGLES ALSO HAVE FIRE DAMAGE AND MISSING.

ALSO, THE ROOF DECKING HAS A HOLE ALLOWING THE ELEMENTS IN TO ENTER INTO THE INTERIOR OF THE STRUCTURE.

THIS IS THE LEFT ELEVATION OF THE CEMENT SKIRTING IS CRACKED, DAMAGED, AND IS MISSING IN SOME PARTS.

IT ALSO LOOKS, UH, THERE'S SOME ELECTRICAL WORK DONE.

NO PERMITS WERE FOUND.

THIS IS STILL THE LEFT ELEVATION.

THE OVERHANG HAS FIRE DAMAGE AND IS MISSING ROOF SHINGLES.

THE ROOF SYSTEM IS OPEN TO THE ELEMENTS.

THE FRONT PORCH COVERING HAS LONG-TERM DETERIORATION.

THIS IS THE RIGHT ELEVATION.

THE CEMENT SKIRTING HAS CRACKS AND IS MISSING IN SOME AREAS.

THE CEMENT SKIRTING IS BOWING OUT, SHOWING SIGNS OF FOUNDATION SHIFTING.

THIS IS THE REAR ELEVATION.

THIS IS THE FRONT PORCH AREA.

THE PORCH COVERING HAS LONG-TERM DETERIORATION AND SOME OF THE WOODEN MEMBERS ARE MISSING.

THE PORCH COVERING IS DETACHING FROM THE MAIN.

THIS IS THE FRONT ENTRANCE.

THE EXTERIOR WALL IS DETERIORATED AND DAMAGED.

THERE'S ALSO NO FRONT DOOR.

HERE IS A FRONT ENTRANCE AREA WITH EXTERIOR WALL DAMAGE.

THERE IS SOME SHOWERING ON SOME OF THE WOODEN MEMBERS AND ON THE PORCH COVERING HAS PARTIALLY COLLAPSED PHOTO OF THE FIRE DAMAGE AND SHARD WOOD MEMBERS.

ANOTHER PHOTO OF THE PARTIALLY COLLAPSED COVERING.

THIS IS STANDING IN THE FRONT LIVING ROOM LOOKING INTO THE FRONT ELEVATION.

THE INTERIOR WALLS ARE DAMAGED AND THE WOOD HAS SEPARATED.

THE FLOOR IS DAMAGED AND UNEVEN WITH SCATTERED DEBRIS.

THE RAFTERS, CEILING JOISTS AND WOOD DECKING IS MISSING ANOTHER VIEW OF THE CEILING.

THIS IS STILL THE FRONT LIVING ROOM SHOWING THE FLOOR THAT IS UNEVEN DAMAGE AND HAS TRASH AND DEBRIS.

THIS IS A PHOTO OF THE BATHROOM.

THIS .

THIS IS THE REAR BEDROOM WITH DEBRIS, WHICH IS, WHICH IS COMPROMISING EGRESS.

THIS IS A ROOM TOWARDS THE BACK OF THE STRUCTURE THAT LEADS TO THE BACKYARD.

INTERIOR WALLS ARE DAMAGED AND THERE IS TORN UP DAMAGE SHEET ROCK ON THE FLOOR.

THE CEILING SHEET ROCK IS MISSING EXPOSING THE ROOF DECKING, WHICH HAS SMOKE DAMAGE AND IS CHARRED.

THIS IS A NEW ELECTRICAL PANEL.

NO PERMITS WERE FOUND FOR SUCH WORK.

3 1 2 FIGHT ALLEY IS A 120 SQUARE FOOT VACANT SINGLE STORY RESIDENTIAL STRUCTURE WITH NO CURRENT UTILITIES CONNECTED TO IT.

THE FRONT ELEVATION ROOF OVERHANG, THE FRONT ELEVATION ROOF AREA ALONG WITH THE FRONT PORCH AWNING IS DE DETERIORATED AND HAS FIRE DAMAGE.

THE ROOF SYSTEM HAS A, HAS LARGE HOLES ALLOWING THE ELEMENTS TO ENTER THE STRUCTURE, CAUSING DAMAGE TO THE INTERIOR ROOF RAFTERS AND CEILING JOISTS, AND ALSO CAUSING DETERIORATION TO THE INTERIOR OF 3 1 2 FIGHT ALLEY.

SOME OF THE ROOF SHINGLES TO THE FRONT ARE MISSING OR SEVERELY DETERIORATED AND THE ROOF HAS PARTIALLY COLLAPSED.

THE INTERIOR OF THE STRUCTURE HAS TRASH AND DEBRIS SCATTERED, COMPROMISED AND EGRESS.

THERE ARE LARGE HOLES IN THE CEILING ALLOWING THE ELEMENTS TO ENTER THE STRUCTURE, CAUSING FURTHER DAMAGE TO THE INTERIOR WALLS, WOOD MEMBERS.

AND A RESULT, THE FLOOR IN THE FRONT LIVING ROOM IS SOFT AND SPONGY.

TO RECAP, THE STRUCTURE LOCATED

[02:20:01]

AT 3 1 2 5 ALLEY IS IN VIOLATION OF CITY CODE ARTICLE EIGHT, CHAPTER 6 1 5 6.

SUBSECTION 1, 2, 5, 7, 8, 11, 12, 15, 17, AND 18 IN WHICH ANY BUILDING OR STRUCTURE, WHICH HAS ANY OR ALL THE CONDITIONS OR DEFECTS HEREINAFTER DESCRIBED SHALL BE DEEMED TO BE DANGEROUS BUILDING AND A HAZARD TO PUBLIC HEALTH, SAFETY AND WELFARE.

PROVIDED THAT SUCH CONDITION OR DEFECTS OF DILAPIDATION, SUBSTANDARD, OR OF FITNESS FOR HUMAN HABITATION POSE A THREAT OR POTENTIAL THREAT TO LIFE, HEALTH, PROPERTY, OR HUMAN SAFETY STAFF RECOMMENDS DEMOLITION OF 3 1 2 FIGHT ALLEY.

THIS CONCLUDES MY PRESENTATION.

ARE THERE ANY QUESTIONS FOR THE OFFICER? THANK YOU.

THANK YOU.

UH, THERE ARE NO, UH, INDIVIDUALS SIGNED UP FOR PUBLIC COMMENT, SO, UM, ANY DISCUSSION OR QUESTIONS OR, I'M READY TO HEAR A MOTION.

I'LL MAKE A MOTION.

OKAY.

I MOVE THAT THE PROPERTY LOCATED AT 3 1 2 FRIGHT ALLEY IS A PUBLIC NUISANCE, WHICH IS NOT FEASIBLE TO BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER.

ARE YOU ON? CAN YOU HEAR HER ON THE MIC? NO.

YEAH.

OH, I'M SORRY.

YEAH.

MOVE A LITTLE CLOSER.

I'LL START OVER.

I MOVE THAT THE PROPERTY LOCATED AT 3 1 2 FRIED ALLEY IS A PUBLIC NUISANCE, WHICH IS NOT FEASIBLE TO BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6.

SUBSECTIONS 1, 2 5 7, 8, 11, 12, 15, 17, 18.

I MOVE THAT THE PROPERTY BE DEMOLISHED WITHIN 30 DAYS FROM THE ISSUANCE OF THIS ORDER.

AND ANY, UM, TRASH, DEBRIS BE REMOVED AND PROPERTY SECURED.

OKAY.

SO THE MOTION IS THAT THE PROPERTY LOCATED AT THREE 12 SITE ALLEY IS A PUBLIC NUISANCE, WHICH IS NOT FEASIBLE TO BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6 SUBSECTIONS 1, 2, 5, 7, 8, 11, 12, 15, 17, AND 18.

IT SHOULD BE DEMOLISHED WITHIN 30 DAYS.

THE PROPERTY SHOULD BE SECURED AND FREE OF TRASH AND DEBRIS.

DO WE HAVE A SECOND? THIS IS JOE SEL SECOND.

OKAY.

ANY DISCUSSION? CAN WE HAVE A ROLL CALL VOTE.

KAYLA MIRANDA? YES.

JOE SLI.

YES.

GEORGE GRIMES JR.

YES.

DR. LINDA LOPEZ RODRIGUEZ? YES.

YVONNE ADDISON.

YES.

FRED ANDES? YES.

MOTION PASSES WITH THE VOTE OF SIX TO ZERO.

I I BELIEVE THIS IS OUR FINAL PROPERTY.

UM, IT'S 2 0 6 MANI BOULEVARD.

IS THAT HOW YOU SAY IT? YES, MA'AM.

OKAY.

GOOD MORNING BOARD.

GOOD MORNING.

UH, FOR THE RECORD, MY NAME IS JAIME HASSEL, DANGEROUS PREMISES OFFICER FOR THE CITY OF SAN ANTONIO DEVELOPMENT SERVICES DEPARTMENT.

THE STRUCTURE BEING PRESENTED TODAY IS LOCATED AT 2 0 6 MANIFE BOULEVARD WITH A RECOMMENDATION FOR DEMOLITION IN ACCORDANCE WITH CITY CODE ARTICLE EIGHT, CHAPTER SIX.

THIS IS THE FIRST TIME THIS PROPERTY IS BEING HEARD BEFORE THIS BOARD.

THE LEGAL DESCRIPTION IS NCB 3 6 9 6 BLOCK 37, LOT 34, LOCATED IN CITY COUNCIL DISTRICT FIVE.

THE OWNER ON RECORD IS RODRIGUEZ ANDREA R ESTATE OF WITH A MAILING ADDRESS OF 2 0 6 MANATEE BOULEVARD, SAN ANTONIO, TEXAS 7 8 2 0 7.

ALL NOTICES OF HEARING WERE PROPERLY ISSUED AS REQUIRED.

UH, THE OWNER ON RECORD IS NOT PRESENT TODAY.

DOES THE BOARD WISH TO PROCEED? YES.

UH, AS OF APRIL 9TH, 2026, UM, NO PERSONAL CONTACT HAS BEEN MADE WITH THE OWNER OR INTERESTED PARTIES ON APRIL 7TH, 2026.

UH, EILEEN LOPEZ DID MAKE CONTACT WITH CITY STAFF AND SHE IS A SISTER TO THE OWNER.

UM, SHE'S REQUESTING A RESET SO THAT SHE MAY SELL THE PROPERTY AND SHE WANTS TO START OBTAINING BIDS.

THE FOLLOWING IS A TIMELINE OF EVENTS REGARDING THE NOTIFICATION PROCESS.

THE FIRST INSPECTION REGARDING 2 0 6 EE BOULEVARD WAS CONDUCTED ON MARCH 7TH, 2025.

THE ORIGINAL NOTICE WAS MAILED ON MARCH 12TH, 2025 AND THE CERTIFIED RECEIPT WAS RETURNED UNDELIVERED ON MARCH 18TH, 2025.

[02:25:01]

ON MARCH 25TH, 2025.

A PRE-BOARD CONFERENCE WAS, WAS HELD AT 1901 SOUTH ALAMO.

NO OWNER OR INTERESTED PARTY ATTENDED ON MARCH 7TH, 2025.

A WARRANT WAS EXECUTED AT THE PROPERTY FOR ABATEMENT AND SECURING DURING THE ABATEMENT.

TWO INDIVIDUALS WERE FOUND INSIDE THE STRUCTURE.

NEITHER INDIVIDUAL WAS AN OWNER OR AUTHORIZED AGENT FOR THE PROPERTY.

OUTREACH WAS SUBMITTED FOR SERVICES ON APRIL 4TH, 2025.

HOMELESS SERVICES AND STRATEGY DEPARTMENT FORMERLY WITH DHS MADE CONTACT WITH THE INDIVIDUALS AND OUTREACH SERVICES WERE PENDING ON APRIL 30TH, 2025.

UH, SAPD NOTIFIED, UH, DANGEROUS PREMISES OFFICER THAT THE STRUCTURE WAS UNSECURED IN THE REAR ON MARCH 11TH, 2026.

A WARRANT WAS EXECUTED ON THE PROPERTY TO ABATE THE VIOLATIONS AND SECURE THE STRUCTURE.

THREE INDIVIDUALS WERE FOUND INSIDE THE STRUCTURE.

OUTREACH WARRANT WAS SUBMITTED FOR SERVICES.

A PROPERTY MAINTENANCE PLACARD HAS BEEN POSTED ON THE PROPERTY ON THE FOLLOWING DATES, JANUARY OF 2024, OCTOBER, 2024 AND SEPTEMBER OF 2025.

ON MARCH 24TH, 2026 THE NOTICE FOR THE BSB HEARING WAS MAILED TO THE OWNER.

AND ON MARCH 26TH, 2026 THE NOTICE FOR THE BSB HEARING WAS POSTED AT 2 0 6 MANE BOULEVARD.

AS OF A AS OF APRIL 9TH, 2026.

NO SCOPE OF WORK OR FINANCIAL PROOF OR LETTER OF CREDIT OR ENGINEER'S REPORT HAS BEEN PROVIDED AND THERE ARE NO ACTIVE PERMITS ON FILE.

UH, THIS PROPERTY DO LIKE TO INFORM.

THE BOARD IS LOCATED NEXT TO AN ACTIVE RAILROAD AND IT HAS BEEN VERIFIED.

THERE ARE NO ACTIVE SERVICES FOR CPS OR SAUCE.

THE PHOTOS THAT ARE BEING PROVIDED FOR TODAY'S PRESENTATION WERE TAKEN ON MARCH 11TH AND APRIL 2ND, 2026.

THIS FIRST PHOTO IS A FRONT ELEVATION OF THE STRUCTURE.

IT IS A COMMERCIAL STRUCTURE ON A CORNER PROPERTY NEXT TO AN ACTIVE RAIL LINE.

UM, HERE YOU CAN SEE THAT THE FRONT DOORS THAT WERE PRESENT HAVE BEEN REMOVED AND IS NOW JUST BOARDED UP.

YOU CAN SEE THAT THERE IS DAMAGE TO THE FASCIA BOARDS AND ONE OF THE FASCIA BOARDS IS MISSING.

THIS IS THE LEFT ELEVATION AS SEEN FROM THE REAR.

HERE YOU CAN SEE THAT SOME OF THE SIDING IS DETACHING AND THERE IS SOME SIDING MISSING.

THERE IS A LARGE HOLE THAT IS PRESENT THAT WAS, UH, BROKEN INTO THE STRUCTURE WHERE THEY'RE MAKING ENTRY.

THERE IS DAMAGE TO THE OVERHANG AND SOME OF THOSE BOARDS ARE DETACHING.

THIS IS THE REAR ELEVATION OF THE STRUCTURE.

HERE YOU CAN SEE MORE THAT THE SIGHTING IS LACKING WEATHER PROTECTION.

THERE'S MORE DETERIORATION VISIBLE TO THE OVERHANG AND FASCIA BOARDS.

SOME OF THE ROOF OF SHING, THE ASPHALT SHINGLE ROLL IS, UH, SEPARATING FROM THE DECKING AND THERE IS AN ATTACHED PORCH OR, UH, LANDING THAT IS DETACHING FROM THE STRUCTURE.

IT'LL BE VISIBLE IN ANOTHER PHOTO.

THIS IS THE RIGHT ELEVATION.

HERE YOU CAN SEE A CLOSEUP LOOK AT THE, UH, ATTACHED PORCH LANDING THAT IS DETACHING AND IS SINKING INTO GRADE.

THERE IS EVIDENCE THAT THE STRUCTURE IS, UM, SLIGHTLY SINKING INTO GRADE AS WELL, AND THERE IS SOME SEPARATION TO THIS REAR ADDITION.

UH, THIS IS A CLOSEUP OF THAT AREA THAT IS SHOWING THAT THE SEPARATION TO THAT REAR , UH, MAKING ENTRY, ENTRY INTO THE STRUCTURE.

YOU CAN SEE THAT THERE IS A LARGE AMOUNT OF TRASH AND RUBBISH AND DEBRIS ITEMS THAT ARE INSIDE.

THERE IS EVIDENCE OF VAGRANT THAT ARE USING THIS PROPERTY, UM, AND IT DOES POSE AN EGRESS CONCERN.

UH, WALKING FURTHER IN, YOU CAN SEE THAT THERE IS DAMAGE TO THE WALL WHERE A STUD HAS BEEN REMOVED TO ALLOW ACCESS TO THE ANOTHER PORTION OF THE BUILDING.

UH, LOOKING TOWARDS THE LEFT ELEVATION HERE YOU CAN SEE MORE EVIDENCE OF TRASH, RUBBISH DEBRIS AND VAGRANT THAT HAVE USED THE PROPERTY.

THIS HERE IS NATURAL LIGHT THAT IS ENTERING INTO THE STRUCTURE FROM A HOLE THAT IS PRESENT IN THE EXTERIOR WALL.

UH, LOOKING TOWARDS THE FRONT, YOU CAN SEE THAT SOME OF THE, UH, CEILING DRYWALL IS SEPARATING, IS STARTING TO SAG.

UH, THERE'S LARGE AMOUNTS OF TRASH, RUBBISH AND DEBRIS.

AND HERE'S A LOOK FURTHER INTO THE STRUCTURE.

YOU CAN SEE THAT THERE'S A MAKESHIFT ROOM THAT YOU'LL SEE IN A FURTHER IN ANOTHER PHOTO.

UH, SOME OF THE WOOD MEMBERS THAT ARE STARTING TO, UH, SAG AND THERE IS MISSING DRYWALL UP IN THE CEILING.

AND HERE'S A PHOTO.

UH, LIKE I MENTIONED BEFORE, THIS STRUCTURE WAS OCCUPIED AT THE TIME OF THIS INSPECTION.

UM, THERE IS INDIVIDUALS THAT WERE STAYING IN THIS, UH, STRUCTURE AND HERE'S EVIDENCE OF VAGRANT ARE USING IT.

THIS IS A MAKESHIFT ROOM THAT'S TOWARDS THE FRONT OF THE STRUCTURE WHERE THE DOUBLE DOORS, UH, PREVIOUSLY WERE.

THERE IS SOME DRY OR WOOD MEMBERS THAT ARE STARTING TO SAG AND ARE JUST RESTING ON THE MAKESHIFT WALL.

AND HERE'S A PHOTO WHERE NATURAL LIGHT IS ENTERING WHERE THE DOUBLE DOORS WERE PREVIOUSLY.

UM, ON THE STRUCTURE, UH, IT HAS BEEN SECURED, BUT IT IS DAMAGED TO THE FRAMING.

UH, LOOKING TOWARDS THE FRONT LEFT ELEVATION, YOU CAN SEE MORE NATURAL LIGHT THAT IS ENTERING INTO THE STRUCTURE, MORE TRASH, RUBBISH AND DEBRIS THAT IS PRESENT.

[02:30:02]

UH, WALKING THROUGH TO THE, UH, ATTACHED, UH, OTHER SIDE OF THE BUILDING, WE WENT THROUGH THIS HOLE THAT IS PRESENT ON THE WALL.

HERE.

YOU CAN SEE THAT THERE IS DAMAGE TO THE SUBFLOOR.

THERE IS WATER PRESENT, UH, THAT IS POOLING INSIDE IN THE INTERIOR.

THERE'S MORE TRASH AND RUBBISH LOOKING INTO THE BATHROOM FACILITIES.

THESE FACILITIES WERE BEING USED.

UH, THERE IS NO WATER SERVICE TO THE PROPERTY.

UH, THERE'S EXPOSED WOOD MEMBERS AND THERE'S WATER DAMAGE PRESENT.

UH, WALKING FURTHER INSIDE, YOU CAN SEE THAT THERE IS TARPS THAT ARE BEING USED TO KEEP THE MOISTURE AND, UH, WATER, UH, ELEMENTS FROM ENTERING THE STRUCTURE.

AND HERE'S A CLOSEUP OF THE ROOF DECKING THAT SHOWS THE WATER DAMAGE PRESENT TO THE WOOD MEMBERS.

UH, FURTHER TOWARDS THE FRONT OF THE STRUCTURE, YOU CAN SEE THAT THERE IS MORE EVIDENCE OF ANOTHER INDIVIDUAL THAT IS USING THIS PROPERTY.

AND THIS IS THE FRONT ELEVATION.

HERE YOU CAN SEE MORE WATER DAMAGE VISIBLE TO THE CEILING JOISTS, AND, UH, THERE'S WATER DAMAGE TO THE DRYWALL AS WELL, .

AND DURING OUR INSPECTION, WE DID FIND AN INDIVIDUAL THAT WAS SLEEPING IN THIS ROOM, SO IT IS BEING USED BY VAGRANTS.

TO RECAP THE STRUCTURE LOCATED AT 2 0 6 MANIFE BOULEVARD IS IN VIOLATION OF CITY CODE ARTICLE EIGHT, CHAPTER 6, 1 56, SUBSECTIONS 1, 2, 5, 7, 8, 11, 12, 15, 17, AND 18 FOR THE MAIN IN WHICH ANY BUILDING OR STRUCTURE WHICH HAS ANY OR ALL OF THE CONDITIONS OR DEFECTS HEREAFTER DESCRIBED, SHALL BE DEEMED TO BE A DANGEROUS BUILDING AND A HAZARD OF PUBLIC HEALTH, SAFETY AND WELFARE.

PROVIDED THAT SUCH CONDITIONS OF DEFECTS OF DILAPIDATION SUB CENTEREDNESS OR UNFIT FOR HUMAN HABITATION POSE A THREAT OR POTENTIAL THREAT TO LIVE HEALTH, PROPERTY OR HUMAN SAFETY STAFF RECOMMENDS DEMOLITION WITH THE PROPERTY REMAINS SECURED VACATED.

UM, THAT CONCLUDES MY PRESENTATION FOR 2 0 6 MANIFE BOULEVARD.

IS THERE ANY QUESTIONS FOR THE OFFICER? OKAY, THANK YOU.

UH, I'LL TAKE A MOTION.

OH, WAIT, THERE'S PUBLIC COMMENT.

I DIDN'T SEE THAT.

SORRY.

YES.

FROM EILEEN GARZA ON TUESDAY, APRIL THE SEVENTH TO JUDY KRUM, EILEEN LOPEZ, WE HAVE DEAR JUDY, I AM WRITING TO RESPECTFULLY INFORM THE COURT THAT I WILL BE UNABLE TO INTEND SCHEDULE HEARING ON APRIL 9TH, 2026 REGARDING THE PROPERTY LOCATED ON 2 0 6 MEFI, WHICH IS CURRENTLY ON THE MARKET.

UNFORTUNATELY, I DO NOT RESIDE IN SAN ANTONIO, WHICH MAKES IT DIFFICULT FOR ME TO APPEAR IN PERSON.

ADDITIONALLY, MY UNCLE IS DISABLED AND WILL NOT BE ATTENDING.

THANK YOU FOR YOUR TIME AND CONSIDERATION.

SINCERELY, EILEEN LOPEZ.

THAT IS THE OWNER'S SISTER EITHER.

ANY OTHER COMMENTS? YOU NEED TO UNLOCK YOUR IPHONE FIRST .

ALL RIGHT.

I AM READY FOR A MOTION.

OKAY, I'LL MAKE A MOTION.

I MOVE THAT THE PROPERTY LOCATED AT 2 0 2 0 6 MENIFEE BOULEVARD IS A PUBLIC NUISANCE, WHICH IS NOT FEASIBLE TO BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6.

SUBSECTION 1, 2 5, 7, 8, 11, 12, 15, 17, 18.

I MOVE THAT THE PROPERTY BE DEMOLISHED WITHIN 30 DAYS OF THE ISSUANCE OF THIS ORDER.

BE SECURED FREE OF TRASH AND DEBRIS.

OKAY, SO THE MOTION IS THAT THE PROPERTY LOCATED AT 2 0 6 MINUTE VIEW BOULEVARD.

IT'S A PUBLIC NUISANCE, WHICH IS NOT FEASIBLE TO BE REPAIRED AT THIS TIME AND IS IN VIOLATION OF CHAPTER SIX, ARTICLE EIGHT, SECTION 1 5 6, SUBSECTIONS 1, 2, 5, 7, 8, 11, 12, 15, 17, AND 18.

AND SHOULD BE DEMOLISHED WITHIN 30 DAYS.

AND THE PROPERTY SHOULD BE SECURED AND FREE OF TRASH.

IS THAT CORRECT? CORRECT.

OKAY.

UH, DO WE HAVE A SECOND EXCUSE SECOND BOARD? UH, THIS IS HYMAN HASSEL DANGEROUS PREMISES.

UH, STAFF WOULD ALSO RECOMMEND THAT THE PROPERTY REMAIN VACATED.

UM, OKAY.

LET'S GET THE MOTION GOING AND THEN WE CAN DO SOME AMENDMENTS HERE.

ALL RIGHT.

UH, SECOND.

DO WE HAVE A SECOND? YES, I SECOND.

OKAY.

NOW FRIENDLY AMENDMENT, UH, TO ADD, UH, VACATED, UM, UH, I'LL MAKE A FRIENDLY AMENDMENT THAT WE, UH, ALSO MAKE SURE IT'S VACATED.

OKAY.

IS THAT ACCEPTABLE? ACCEPTABLE, ACCEPTABLE.

LEMME CHECK.

OKAY.

SO BOTH, UH, UH, IT'S BEEN ACCEPTED AND, AND THE SECOND HAS ALSO ACCEPTED, SO THAT WILL BE PART OF THE MOTION TO VACATE THE

[02:35:01]

PROPERTY.

UH, LET'S DO A ROLL CALL.

VOTE.

KAYLA MIRANDA? YES.

JOEL ALISE.

YES.

GEORGE GRIMES JR.

YES.

DR. LINDA LOPEZ RODRIGUEZ? YES.

YVONNE ADDISON? YES.

FRED ANDES? YES.

MOTION PASSES WITH A VOTE OF SIX TO ZERO.

OKAY.

UH, THAT IS THE END OF OUR ADMINISTRATIVE AGENDA ITEMS. DOES ANYONE HAVE ANY ADMINISTRATIVE ITEMS? MADAM CHAIR? UH, CAN I ASK THE FULL, UH, FOR A FULL BOARD MEETING, WHEN WE HAVE OUR NEXT FULL BOARD MEETING, CAN WE HAVE, UH, WHOEVER'S IN CHARGE OF DECONSTRUCTION GIVE US A MORE IN DEPTH? BECAUSE I KNOW WE HEARD A, WHEN THEY WERE PROPOSING THAT.

CAN WE HAVE MORE IN DEPTH AT OUR NEXT FULL BOARD MEETING? YES.

WE'RE SCHEDULED TO HAVE A, A MEETING THIS AFTERNOON WITH, UH, OHP AND WE'LL CHECK ON THEIR AVAILABILITY.

THAT WOULD BE COMING FROM THE DEPARTMENT OF O, UH, HISTORIC PRESERVATION.

SO WE'LL, WE'LL WORK WITH THEM TO SEE IF THEY'RE AVAILABLE.

THANK YOU.

AND JUST TO ADD ON TO THAT, CAN WE ASK FOR A PRESENTATION ON THE, UH, DECONSTRUCTION THAT THE CASAS, I, I KNOW, UH, ESPERANZA PEACE AND JUSTICE CENTER HAS JUST DECONSTRUCTED LIKE FOUR OR FIVE HOUSES IN THE PAST YEAR AND THEY WERE RECONSTRUCTING THEM AND THEY'RE ALMOST DONE.

SO THAT WOULD BE REALLY AWESOME TO SEE.

I'M SORRY, YOU WERE ASKING, UH, THE PROCESS OR THE COST? I'M SORRY.

I WANTED TO CLARIFY JUST A PRESENTATION ON, ON WHAT THE DECONSTRUCTION DOES AND HOW IT CAN BE USED.

GOT IT.

BASICALLY INVITING ESPERANZA TO SHOW THEIR DECONSTRUCTION PROCESS.

ANY, ANYTHING ELSE? THIS IS JUDY CRIM.

JUST WANTED TO PROVIDE AN UPDATE.

OKAY.

EXCUSE ME.

TO THE BSB UM, PANEL.

PANEL A MEMBER, MS. DORIS SOLI REPRESENTING COUNCIL DISTRICT SIX AND PANEL B MEMBER GEORGE GRIMES JR.

REPRESENTING COUNCIL DISTRICT TWO, WERE BOTH REAPPOINTED TO THE BSB ON MARCH 19TH, 2026.

THE PLANNING AND COMMUNITY DEVELOPMENT COMMITTEE MET ON MONDAY, MARCH 30TH, 2026 FOR CONSIDERATION OF THE VACANT AT LARGE POSITIONS.

MR. ROBERT BANKY WAS SELECTED FOR REAPPOINTMENT DR.

FAZEL HUSSEIN IN THE VETERAN CATEGORY, AND MR. DAVID VALIER AND ARCHITECT WERE BOTH SELECTED FOR APPOINTMENT.

ALL THREE APPOINTMENTS ARE SCHEDULED FOR CITY COUNCIL APPROVAL TODAY, APRIL 9TH, 2026.

ADDITIONALLY, HYMAN, EXCUSE ME, JAMIE LITTLE HAS BEEN SELECTED AS A MAYORAL APPOINTMENT AND HER APPOINTMENT IS PENDING CITY COUNCIL APPROVAL.

DR.

HUSSEIN WILL JOIN PANEL A AND MR. VALIER AND MS. LITTLE WILL JOIN PANEL B.

UNFORTUNATELY, MS. ANNE WEINER WAS NOT SELECTED FOR REAPPOINTMENT AFTER THE APPROVALS BY CITY COUNCIL.

THE BSB WILL HAVE A FULL MEMBERSHIP.

THANK YOU.

THAT'S AWESOME.

UM, SORRY TO SEE ANN GO THOUGH.

WE WILL MISS HER.

UM, ALL RIGHT.

ANY, ANY OTHER ADMINISTRATIVE ITEMS? OKAY.

UH, BY, OH, IT'S 11:58 AM BY ANONYMOUS .

WE ARE ADJOURNED.

HAVE A GREAT DAY.