[00:01:02]
[00:09:03]
PERSONNEL RECOMMEND THAT NEIGHBORHOOD.[00:18:45]
BUENO[00:19:00]
LARGO HEIGHT.[00:24:12]
UM, CON CON CON COMM CRUZ[00:25:54]
MULTI, UM, GOVERNMENT[00:32:13]
IT THANKSGIVING[00:39:43]
CON CON[00:40:15]
WHEN I START THIS, UH, TYLER ADAMS RECOMMEND THAT IN INCIDENT,[00:45:07]
THOSE, THOSE UNIVERSITY GRACIAS[00:52:42]
WHEN I STARTED CONSULTANT GROUP ROAD, OLD ROAD ROAD IN MEDINA ROAD IN THE, IN[00:57:17]
MAGNIFI ROAD.[01:11:33]
I[01:11:33]
STARTED[01:11:47]
THE DSS.[01:15:39]
OKAY.[01:21:20]
MEDINA ROAD COMMISSIONER.BU JUAN VARGAS, DISTRICT FIVE LOCATION IS 7 2 0 NORTHWEST 24TH STREET AND IT'S ZONED C2.
THE REQUEST IS FOR A REQUEST FOR AN 18 FOOT VARIANCE FROM THE MINIMUM REQUIRED 30 FOOT REAR SETBACK TO ALLOW A STRUCTURE WITH A 12 FOOT REAR SETBACK AND TWO, AN ELIMINATION OF THE 15 FOOT BUFFER IN THE REAR.
[01:27:09]
WHEN MY FIRST TIME WE BOUGHT THE PROPERTY, WE CAME OVER HERE AND WE EXPLAINED WHAT WAS OUR PROJECT AND THEY ALLOW US TO HAVE IT.AND WE STARTED FROM 2016 UP TO 2022.
[01:31:10]
24.I CAME OVER TO GET A PERMIT TO HAVE A ROOM 30 BY 30.
AND THEN VERY RECENTLY, UH, WE HIRED ENGINEERS BECAUSE I WANTED TO HAVE A GATE.
AND THEN WHEN WE CAME OVER FOR THE PERMIT, THEY TOLD ME THAT THERE WAS A VARIANCE OF THE DIMENSIONS OF THE ROOF.
UH, I WOULD LIKE YOU TO CONFIRM THAT THE VERY, THE DRAINAGE THAT ROOF, EVERYTHING THAT WE INSTALL, THE WATER, WE ALWAYS WOULD WITH A, WITH A PERMIT FROM THE CITY.
I WAS NOT AWARE OF THIS VARIANT, AND THIS IS WHY I'M HERE TODAY BECAUSE I'D LIKE TO BE RESPONSIBLE.
THIS IS OUR, THE WAY WE LIVE AND THIS IS, UH, HOW, HOW WE MAKE MONEY, UH, WITH THIS, UH, TRUCK.
AND I'M HERE, UH, TO SEE WHAT CAN I DO THESE.
THERE'S NO PROBLEM WITH WHAT'S GOING ON.
ALL THE NEIGHBORS SUPPORT ME AND I WITH ALL NEIGHBORS THAT LIVE AROUND THE AREA.
[01:35:34]
AND WHAT WAS MY PURPOSE FOR THE PROPERTY? AND THEY SAID YES.I TOLD, OBVIOUSLY NOT NO BUENO
[01:44:43]
RE[01:59:54]
FROM[02:02:15]
HE[02:03:27]
A-D-U-I-D-U[02:15:59]
BU[02:19:15]
BUENO.[02:20:13]
AND[02:20:13]
THE[02:20:13]
CITY IS WORKING ON GETTING ZERO ZERO WEST MALONE AVENUE.[02:25:57]
YES.[02:32:51]
MAL[02:36:05]
AVENUE LAW CRUZ EZMAN, PINE NORTH PINE STREET,[02:41:05]
NORTH PINE STREET GON,[02:49:31]
PINE[02:51:48]
COMMISSIONER CRUZ CON COMMISSIONER AND RE, CONNELLEY STREET[02:55:05]
INCORPORATED.[03:11:43]
RE[03:11:44]
C[03:11:45]
CON CON CRUZ CON CONMAN CON COMM.[03:15:02]
SAN ANTONIO HOLDING L MAPS,[03:20:42]
THEY CHOSE LUIS ESTRADA, ENT, RANDOLPH BOULEVARD,[03:25:33]
BREGMAN COMMISSIONER REID COMM, MS. NOT RIGHT ROAD CONSTRUCTION.[03:33:37]
A[03:40:24]
ABRAHAM[03:40:25]
SANCHEZ.